Project Description:
1)
Project: Migration and Develop Custom Application.
Technology: SharePoint 2010, ASP.Net 3.5
Duration: 4 Month
Description:
Canadian-based gold producer with significant gold production, gold development stage properties, exploration properties, and land positions in Brazil, Argentina, Chile, Mexico and Colombia. They have their site in SharePoint 2007.They had migrate site from 2007 to 2010 environment and faces lot of issues as well as develop custom Application.
Responsibilities:
* Migrate the site from Moss2007 to SharePoint 2010.
* Setting up the SharePoint Server 2010 Production Environment.
* Configure the Project sever for reporting services.
* Fix the after Migration Issues.
* Develop the Sharepoint2010 FBA (Claim Base Authentication).
* Develop the custom application web parts ,Content type , Reporting Services.
* Develop the location locator Web Part by using Google API service.
2)
Technology: SharePoint Server 2010, Visual Studio 2010
Duration: 3 months
Description:
The largest private label coffee and tea manufacturers in North America.
They have migrated from SharePoint 2007 to SharePoint 2010 and wants to Back up and restore the site. Our Company was the service provider for them; I was responsible for Backing up and restore, My Site Creation
for Mother Parker firm in SharePoint 2010 environment on production server, the site, Installing and Deploying WSP. Also perform the role of SharePoint Application Development for custom application.
Responsibilities:
* Migrate the site from Moss2007 to SharePoint 2010.
* Setting up the SharePoint Server 2010 Development Environment.
* Develop the Sharepoint2010 FBA (Claim Base Authentication) for there Intranet Site.
* Develop the Store locator Web Part to locate the coffee shop using Google API.
* Develop the Connected Web Part using the linq to display records.
* Develop the Sandbox as well as farm level solution.