Change control tools and techniques

CLOSED
Bids
2
Avg Bid (USD)
$111
Project Budget (USD)
$30 - $250

Project Description:
This is a 2 page (500) words order. I will pay $2.5 per 250 words.. need at least 3 references with harvard references and Master Level

Installation of a baggage handling system (BHS) was an important part of the plan for the Denver International Airport (DIA) project. The project management team (PMT) for the DIA project decided to go ahead with a full-scale implementation of the BHS. The contract for installation of the BHS—with a fixed scope, schedule, and budget—was awarded to Boeing Airport Equipment Automated Systems, Inc. (BAE). For some reason, the airlines—major stakeholders in the project—were excluded from discussions about the project scope. One of BAE’s conditions was that no change requests would be accepted. However, as work progressed, the airlines made a number of requests for changes.

Assume that you were a project manager at BAE responsible for the installation of the BHS at DIA:
Give at least two recommendations to the BAE management about handling the change requests, also consider below elements in your recommendation:
• Include a description of the result that you expect for each recommendation.
• Be specific in your recommendations and in the description of the results that you expect if your recommendations are implemented.

Additional Project Description:
06/19/2013 at 13:12 BST
Payment will only be paid after due verification for checking of quality and plagiarism.. Satisfaction of my client is also necessary.

Skills required:
Academic Writing
About the employer:
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


$ 88
in 1 days
Hire arpitarathore
$ 133
in 3 days