Looking for Academic writer: Must have at least Masters in Marketing and have a good command over English

IN PROGRESS
Bids
7
Avg Bid (USD)
$120
Project Budget (USD)
$30 - $250

Project Description:
I need an essay on the following topic, all the instructions have attached. Thank you

Subject: Business, Essay
Topic: Markeaton Park
Fixed Pay: $40 (No negotiation please, and lets start the work)
Instructions:
Assignment
Case Study: The Markeaton Park Project 2012
Background
Markeaton Park is Derby’s most visited and heavily used park and one of the most visited destinations in the East Midlands area, with a wide range of recreational and sporting facilities and attractions. However there has been a lack of investment in the park’s infrastructure over many years, with the park becoming tired and worn out. Many of the facilities on offer no longer meet the needs of today’s visitors, with increasing competition from other attractions. Despite this the park still retains a good reputation as a place to visit, but a continued lack of investment could lead to a self perpetuating spiral of decline.
The park faces many challenges to halt the slow decline and to retain and build on its city and regional standing as a visitor attraction. Some of the key issues and features of the park include, but are not limited to:
1. Reduced takings at the Mundy Play Centre, possibly indicating a fall in visitor numbers, reduced availability of facilities through restricted opening hours and less willingness of visitors to pay for below quality facilities and attractions
2. Intermittent and irregular opening hours on a number of the park’s private concessions, meaning that visitors are not sure what will be open when they visit.
3. Declining budgets available to maintain and manage the park, leading to reduced levels of staff and possible closure of facilities or further reduced opening times.
4. Slow decline in horticulture standards and features such as loss of herbaceous borders and bedding, indicating a reduced level of care by the Council.
5. Poor visitor experience when entering the park, in particular from the A38 leading to the main car park.
6. The park itself is a 20th century park set out within an 18 century historic parkland and remains an attractive place to visit for informal recreation, such as family picnics. However many people are unaware of the size and extent of the park as access is poor, with few footpaths and lack of signage.
7. Its size allows for the staging of major city events, such as the annual firework display and funfair. However this increases the pressure on the parks infrastructure and historic parkland.
8. Deterioration in the parks historic fabric, such as the listed Orangery, coupled with some poor quality spaces such as the stable courtyard that detract from the visitor experience.
The Challenge
• To halt the slow decline and restore the park’s standing as a visitor attraction.
• To increase visitor numbers
• To increase income that can be used to reinvest in the park in improved maintenance and management and provision of higher quality of facilities.
• To protect and improve the parks historic and natural fabric
2 Instructions files attached:
Deadline: 1 day 21h 06m
Style: Harvard
Language Style: English (U.K.)
Words: 3500
Sources: up to you.

Skills required:
Academic Writing
Additional Files: 781205_university_markeaton_park_masterplan_results.doc
Hire hassan114c
Project posted by:
hassan114c Canada
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the project creator or as one of the bidders to view bids.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.