Barons Keep

IN PROGRESS
Project Budget (GBP)
£8 / hr

Project Description:
I have attached another project we are working on at the moment. It consists of putting an additional floor on top of an existing building and you will see it is an awkward shaped building. We have currently designed the framing for Apartments 12-15 and we would like the steelwork drawings prepared. Although the contractor will prepare his own fabrication drawings we would like to provide a comprehensive package similar to the drawings you have completed for Serbert Road. There is likely to be quite a bit of adjustment to the frame and the design as the develops and as we add the remaining apartments.

Hours of work: 15 Project Duration: 1 - 4 weeks Skills required:
3D Modelling, AutoCAD, Engineering Drawing
Project offered by:
Verified