Custom Project May 10 2012 11:00:41

IN PROGRESS
Project Budget (USD)
$3 / hr

Project Description:
I have some home work assignment 4 questions in water quality related.
As an example one question is given.

Question 1
a) What are the major nutrients required for growth of microbial population in wastewater treatment plants.
b) List the major factors influencing the rate of bacterial growth in biological treatment processes.
c) List the major differences and similarities between hetrotrophic bacteria and nitrifying bacteria.
d) If the BOD5 of a municipal wastewater is 310 mg/L and the BODU is 340 mg/L, determine the BOD reaction rate constant (base e). What would be the 3 day 30°C BOD? Assume, temperature coefficient = 1.047.

Hours of work: 10 hours / week Project Duration: 1 - 4 weeks Skills required:
Chemical Engineering, Engineering
Hire bchandra1955
Project offered by:
bchandra1955 India
Verified