Maximum Demand and Load Scheduling

CLOSED
Bids
5
Avg Bid (USD)
$346
Project Budget (USD)
$30 - $200

Project Description:
Since electrical energy is the form of energy that cannot be effectively stored in bulk, it must be generated, distributed and consumed immediately. But load on the power plant is variable in nature. The power plants are designed to meet the maximum demand. However, there is large difference between peak demand and average demand which results in high generation cost per unit. Since peak demand is increasing sharply that demand large installed capacity. It is not possible for developing countries to meet the targeted capacity by installing new power plants. Since electricity is an essential input in all the sectors of any country, hence we need to focus on alternating means by which electricity can be saved and effectively utilized. The effective solution to above said problem is DSM strategies that lower the peak demand and bring immediate benefit to utilities and customers. This paper deals with the basic concept of Demand Side Management thrugh which electricity demand could be reduced at consumer end through effectively control and manage loads from utility side, and to use unsustainable energy practices into more efficient way.

Skills required:
Electrical Engineering, Electronics, Microcontroller, Software Architecture, Technical Writing
Additional Files: maximum+demand+and+load+scheduling+ppt.pptx
About the employer:
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


Hire melsayedhasan
$ 200
in 10 days
$ 200
in 10 days
Hire eicr2013
$ 200
in 20 days
Hire delegate
$ 130
in 5 days
Hire maksmusings
$ 1000
in 10 days