design project2

CLOSED
Bids
6
Avg Bid (GBP)
£237
Project Budget (GBP)
£20 - £50

Project Description:
IT'S IMPORTANT THAT EVERY STEP OF THE WORK REQUIRED are sent to me upon completion, and not just the final piece.

Design a low-temperature central heating system that uses an efficient gas-fired boiler
Design hot and cold water services
The building drawings. You should use CAD or sketch drawings to indicate
 the layout of the hot and cold water services
 the layout of central heating system
Drawing of the heating system using AUTOCAD (or sketch), including ground/first
floor plans and space layout, as well as equipment/material specifications.
Layout and sizing of heat emitters in the building;
 Layout and sizing of piping system and calculation of pressure loss;
 Selection of the boiler and circulating pump;
 Drawing of the heating system using AUTOCAD (or sketch),
Estimate storage requirements
 Decide the location for storage vesselsHeating and Water Supply Design Project

 Draw the system layout (could be on the same drawing as for central heating)

2. DESIGN BRIEF
Building Occupancy
- for Marmont Centre
Monday – Friday 8 a.m. – 6 p.m.
Ground Floor
Café 2 people permanent, 24 people transient
Office 1 2 people, 2 computers
Office 2 2 people, 2 computers
First Floor
Lecture room 75 people, maximum
Computer room 6 people, 10 computers + 3 printers
Seminar room 6 people
Weekend
Unoccupied
The attachments require an autocad software to open and you must be able to understand the work.

Skills required:
AutoCAD, Building Architecture, CAD/CAM, Engineering, Solidworks
About the employer:
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


£ 250
in 7 days
£ 1049
in 10 days
Hire Fahimarch
£ 40
in 3 days
£ 20
in 1 days
Hire ghshaiq
£ 30
in 10 days
Hire sstsohel
£ 30
in 1 days