Project Description:
The students will be required to submit a design report and drainage drawings for the site. The design report should show
that all pipes are designed to efficiently work at a storm return period of 1 in 10 years. The design report should also
outline any issues with the scheme at a 1 in 50 year return period.
Drawings should show both plan and longsections for the drainage scheme for the entire site. These should be
adequately labelled.
The breakdown of marks is as follows:
Design Report
• Overall presentation of network,
• Efficient design for design storm
• Outline of issues for 1 in 50yr RP
Drawings
• Plan
• Longsection
• General Presentation