REFRIGERATOR PERFORMANCE LABORATORY & AIRFLOW IN PIPES LABOATORY

CLOSED
Bids
8
Avg Bid (USD)
$267
Project Budget (USD)
$50 - $400

Project Description:
Hello,

I have 2 labs, one of them about REFRIGERATOR PERFORMANCE LABORATORY and the other one about AIRFLOW IN PIPES LABOATORY.
The first one already instructed as a squares to fill in the lab sheet, so you don't need to add any extra bits, all you have to do is instructed in the lab sheet, easy one.
The second one is almost the same, I have a template of it including the graph and other calculations, it is also instructed precisely.

This is for me and my friend so we want 4 copies, and the writing should be on the lab sheet itself by microsoft word :)

PLEASE PLEASE PLEASE PLEASE if you do not know how to do it then do not ask me to do it for me cuz I had many cases where writers asked me to finish my work while they give me the worst job I have ever seen.

I wanted to be finished maximum by the 21st or the 22nd of March.

Skills required:
Engineering, Mechanical Engineering
Additional Files: xid-8019367_2.docx xid-8019368_2.pdf xid-8064205_2.docx xid-8064206_2.docx
About the employer:
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


Hire bchandra1955
$ 368
in 7 days
Hire rainbow
$ 388
in 10 days
$ 250
in 3 days
$ 336
in 7 days
Hire gvrtutor
$ 55
in 3 days
$ 100
in 5 days
Hire LeonardoMelo1
$ 333
in 10 days
$ 305
in 6 days