Mechanical & Civil Design Projects

CLOSED
Bids
22
Avg Bid (INR)
1228 / hr
Project Budget (INR)
₹750 - ₹1250 / hr

Project Description:
MEP Projects:
• Quantity Surveying for Pre-Tender,
• MEP Designing- HVAC, Firefighting & PHE
• Clients: Sheikh Khalifa Medical City (SKMC)-Abu Dhabi and United Arab Emirates (49,00000 Sq.Feet), Indian Railways-Dedicated Freight Corridor Corporation(DFCC),11Stations in Gujarat, L&T and L&T- Ford India Pvt Ltd, (Whole Plant in Gujarat).

Solar Junction Box Projects:
Software Used : Solid works 2011 & Pro- E.
Project Description :
• Handling the New Product Development
• Develop the Junction Box and MC4 Connectors for Solar Industries.
• Meeting IP 65 & 67, TUV & UL solar Industries.
• Product Sizing, Material selection and troubleshooting customer complaints.
• Understanding the Design records, Engineering drawings / specifications from Customer.
• Conduct Engg specification and feasibility reviews.
• Involving in Reverse Engineering Process and Preparing prototype products.
• Responsible for Legacy Data Conversion 2D to 3D.
• Taking part in Finite Element Analysis.
• Major clients Moserbaer, Lanco and Tata BP.
Solar Junction Box Projects:


Software Used : AutoCAD2007, Solidworks2010, Tekla & Pro-e wildfire.
Responsibilities :
• Understanding the requirement.
• Preparation of Concept & machine layout.
• Designing a Suitable Main Frame as per the Machine Requirement.
• Designing the AUTOMATION Module As Per the Customer Requirement
• Creating the Part, Assembly drawings and Detailing.
• BOM generation and Drawing.
• Drawing standardization.
• Operation & maintenance documentation.
• To ensure timeliness of project deliverables within the allocated man-hours.

Project Title: Tube Loading & Unloading Machine.
Customer : TI-Tube Products, Chennai.
Project Description:
The tube from the furnace conveyor moves to the lifter machine and then moved to the mainline with the help of crane powered by motor.
Project Title: Automatic Fuse Assembly in Ultrasonic welding machine.
Customer : Cooper Bussmann India, Pondicherry.
Project Description:
This Project aimed to develop a material handling equipment for fuse assembly passing through ultrasonic welding, leakage inspection and finally to the bin. This setup was operated through pneumatic cylinders.
Other Projects handled.
M/S.TI Metal form, Patabiram-Induction Table for Grinding and Buffing station.
M/S.TI Metal form, Patabiram-Rafter Cutting machine to Pallet using Conveyor.
M/S.TI Tube Products, Avadi-Bend Removing Machine in Tubes.
M/S.TI Tube Products, Avadi-Dend Removing Machine in Tubes.
M/S.Tafe Tractors and Farms- Carrier Assembly in assembly line.
M/S.Tafe Access Hydraulic – Oil pump assembly line fixture lifter unit.
M/S.Caparo Engineering Pvt Ltd –Rough Boring Machine.
M/S.CooperBussmann India-Fuse Cap assembly machine.
Project Title: 10000MW Phase I & II, Valves Expansion.
Customer : Bharat Heavy Electricals Limited., Trichy.
Project Description :
• Gathering the requirement and inputs.
• Analysing the Layout drawings.
• Preparing General Assembly drawings of Top Guard (Sun roof).
• Preparing detail drawings of Column, beam, bracing, support and purlin.
• BOM generation using the in-house designed tools.
• Preparing weight calculation.

Hours of work: Unspecified Project Duration: 1 - 4 weeks Skills required:
CAD/CAM, Engineering, Manufacturing Design, Product Design, Solidworks
Hire Rigoecs
Project posted by:
Rigoecs India
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


Hire bchandra1955
₹1052 / hr
Hours: 3 hr/ week
₹1666 / hr
Hours: 5 hr/ week
₹1263 / hr
Hours: 5 hr/ week
₹1000 / hr
Hours: 10 hr/ week
₹1250 / hr
Hours: 35 hr/ week
₹2222 / hr
Hours: 30 hr/ week
₹1222 / hr
Hours: 20 hr/ week
₹1000 / hr
Hours: 30 hr/ week
₹1111 / hr
Hours: 3 hr/ week
₹888 / hr
Hours: 5 hr/ week