Case study on HVDC Transmission system

CLOSED
Bids
5
Avg Bid (USD)
$380
Project Budget (USD)
$30 - $250

Project Description:
the idea is the i want to make a study about connecting to cities by HVDC transmission system and compare it to the normal T.L system figuring out the following ( should be in the range of 90-100 page with references ):

HVDC Transmission system between Aqaba and Amman the two cities they are in jordan

( 320 km, 400 kv, almost 600 MW )

* Converter type: IGBT or Thyristor.. ( efficiency, cost, maintenance, power …etc. ).

* Voltage level to be used : could be 500 kv.

* Number of conductors and size (cross sectional area).

* Earthing method.

* Type of insulators to hold conductors.

* Harmonic filter at the inverter side.

* Transmission loss comparison.

* Cost (economical comparison).

Skills required:
Aufbereiten von Daten, Ingenieurwesen, Abfassen technischer Texte
Hire amhq
Project posted by:
amhq Jordan
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the project creator or as one of the bidders to view bids.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.