layout of technology for production of bath radiators

CLOSED
Bids
6
Avg Bid (USD)
$2364
Project Budget (USD)
$250 - $750

Project Description:
we are looking for lay out and technology for a production line for manufacturing of bath radiators from carbon steel tubes and D profile. capacity 500 unit/day.

Skills required:
Manufacturing, Manufacturing Design, Product Design
Hire MilkoMinchev
Project posted by:
MilkoMinchev Bulgaria
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


$ 789
in 12 days
$ 555
in 5 days
$ 555
in 3 days
$ 288
in 6 days
$ 11111
in 30 days
$ 888
in 10 days