Project Description:
Web-site programming HTML 5.0 with esthetics.
Type: Programming of
a) web-site
b) mobile web-site (iOS & Android)(small)
c) MINI Intranet site
Assignment:
Program web-site based upon design and content delivered by client.
Floating layers (see inspiration pages)
Files delivered:
• PSD (layered)
• Word
• Links to vimeo (+ we have original files as well)
Description:
Web-programmer with design esthetics. Programming of web-site based upon clients content. Setup exactly as PSD designs and with an attention to detail and perfect fine-tuning. This project is for the experienced, punctual and detail oriented programmer – that also has a sense of design esthetics.
Size of project:
Main website
• 9 main pages
• 55 (+/- 8) sub
Mobile web-site:
• 9 main pages
• 15 (+/- 5) sub
Intranet site: (VERY SMALL):
• 4 main pages
• 20 (+/- 4) sub – PURE TEXT insert.
Intranet needs:
• Login function + individual password assignment control (only by IT director) (now 14 people)
• FTP access to folders
• Posting on wall of info of info/pictures etc. + auto-notification via email to (now 14 people)
Site contains of:
> Embedding Vimeo videos
> News page & Job posting (with MICRO management system)
> News can be generated into ‘own page’ with picture and text setup
> News ticker: bottom menu part with info appear
> “Share This Page” functionality
> Inquiry Forms
> ‘Like’ to Social Media
> SEO phrases integration on individual pages
Programming Language:
HTML5
Inspiration from:
www.whiteboard.is (primary; made in HTML5)
www.901.com (we know this is flash – and don’t want)
Main Website Timeline:
Main web-site:
Start date: April 11.
Delivery Date: May 4
First batch of material: April 11, 2012.
Second batch of material: April 23, 2012.
Third batch of material: April 25, 2012.
(final vimeo files (last 2): April 23, 2012)
Intranet timeline:
Start date: April 11, 2012
Delivery date: April 20, 2012
Mobile Page timeline:
Start date: April 27, 2012
Delivery Date: May 11, 2012.
Additional info:
Access directly to designers April 16, 17, 18, 19, 20, 23, 24, 25, 26, 27, 30, May 2, 3 from 9 am – 5 pm Central Time.
Project leader available every day 9 – 5 pm Central Time + via email on evening and weekends.