Move and upgrade TYPO3 web site

IN PROGRESS
Bids
8
Avg Bid (EUR)
176
Project Budget (EUR)
€30 - €250

Project Description:
TASK:
1. Move a TYPO3 web site from a web hotel with PHP version 5.2.17 to a web hotel with PHP version 5.3.19.
2. On the new web hotel, upgrade TYPO3 from 4.1.2 to version 4.7.7
3. Check that everything works. If not, fix it.


BACKGROUND:
The TYPO3 website, which consists of around 50 database tables and 3 gb of data, should be moved from an old web hotel to a new one. If moving of 3gb data will be a problem, I can help doing it. You move the database tables.

On the new web hotel, the PHP version is 5.3.19. This means, that the old TYPO3 4.1.2 will not work. After moving all data and database, TYPO3 needs to be upgraded to the latest 4.7.7. This should be done on the new web hotel (data on the old web hotel may not be modified).

When the site has been moved and upgraded, it should be tested that it is still working and that it is possible to add new content; pages, text (HTML editor) and images.

If everything is done smoothly, I can give you more simmilar projects.

Knowledge in TYPO3 is required.

Skills required:
PHP
About the employer:
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


Hire zeke
€ 200
in 2 days
Hire steven6
€ 199
in 0 days
€ 250
in 3 days
€ 100
in 2 days
Hire Hratly
€ 150
in 3 days
€ 225
in 3 days
€ 80
in 5 days
€ 200
in 5 days