Alterative solution required to meet the BCA - 3.4.1 Report

CLOSED
Bids
4
Avg Bid (AUD)
$1319
Project Budget (AUD)
$750 - $1500

Project Description:
Alterative solution required to meet the BCA - 3.4.1 subventalation

Example of the alternative solution for celling heights attached but now I need one for subventalation done.

The following works have been done in the property as per attachment.

The job will be awarded within 24hours and expected report to start straight away and submit with in 48hours.

Must be accredit certifier to do this work.

The job is located in 39 Brown Street newtown can you can find all the details from the example attached already done by another certifier for the same job.

Photos can be attached of the existing vents installed. The location of them have been attached.

Must be Australia base and you can contact me 0414 668 240

This work is very urgent so no time wasters.

Additional Project Description:
03/18/2013 at 5:50 ECT
Files Attached.

03/18/2013 at 5:52 ECT
Example attached "alterative example" for the same development done by another certifier

03/18/2013 at 5:56 ECT
Attached is photos and report done by the company so this can be used as reference when composing the "alterative solution report"


03/18/2013 at 5:57 ECT
Example

Skills required:
Building Architecture, Engineering, Project Management, Structural Engineering
Additional Files: Vents+installed.png DA_2.pdf MHB+Letter+3.4.1+V2.pdf
About the employer:
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.