Project Description:
File name should have been "Week 2 George"
Project within scope of assignment, though there is duration on the Support
Product task.
You failed to meet the 42 detail task count requirement. 36
Project Start Date properly set.
The Summary Task Name for the Project should reflect the entire project and
be suffixed with Moniker. See Instructor Policies.
Some of your tasks need to be clarified. As stated in the Week 2 welcome,
when developing a schedule, the lowest or work level task must be action
oriented and should consist of a verb and an object.
Some of the tasks do not fit within the Summary. For example, you have
"Perform Vendor Response Requirements Gap Analysis" within "Integration Build
and Test".
The integrated HRIS is being developed in house with contractors that on
board from the previously failed project. Even if there were to be a purchased
product, what is it that the vendors have responded to? See additional
comments within content section.
First, the budget has been determined by Riordan. Riordan management will
review your schedule and based on various criteria, determine whether to accept
the schedule. Your proposed costs would be the cost of the project as
reflected within the schedule.
Second, the schedule needs to reflect the work necessary to develop the
integrated HRIS in house. Tasks need to be expanded to support the analysis,
design, and development of each of the HRIS modules (sub-systems) including
unit testing, integration testing, user testing, development of training, etc.,
as indicated in the feedback of your Statement of Work, which contained no
indication that a package would be procured.
Though all of your tasks are Auto Scheduled, As Soon As Possible, there are
numerous spelling errors, which detract from the quality of the schedule.
See details in the Assignment Tab Attachment

Additional Project Description:
04/08/2013 at 4:06 EDT
Due 4/8/2013 at 9pm EST.

Skills required:
Microsoft, Project Management
Hire lettgeorge
Project posted by:
lettgeorge United States
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


Hire preshitp86
$ 220
in 5 days
Hire tpksharma
$ 135
in 3 days
$ 250
in 20 days