INVENTORY / TRANSPORT MANAGEMENT SYSTEM

IN PROGRESS
Bids
54
Avg Bid (USD)
$2471
Project Budget (USD)
$1500 - $3000

Project Description:
We require an Inventory / Transport Management Solution that will provide optimal recommendations based on composition of assets and historical sales data.

Core Features
Implement an optimal algorithm for stock order fulfillment replenishment system
The system will take into consideration amongst other variables:
-The size and composition of the fleet
-The capacity of the fleet
-The location of the fleet
-The inventory levels per sku at each depot
-The min and max levels of stock per sku in each depot
-Historical data on Turnaround times, Time delays, Offloading/loading times, Operating hours etc.
-Sales history by SKU in each depot

It will calculate and recommend the optimal sku mix, optimal time and optimal vehicle to schedule to generate the optimal outcome.
As the data grows, must have the ability to improve its suggestion capabilities.

Data Sources
The operational data resides in SQL Server, Microsoft Nav native DB and Excel, so the system must have the capability to either connect directly to these data sources or import data in a defined format.

Efficiency
Existing data is huge and keeps growing so the system must be robust enough to analyze large data sets optimally.

Platform
System should be implemented in either Java or .NET and local database should be either SQL SERVER or MYSQL

Skills required:
.NET, Data Mining, Java, Software Architecture, SQL
About the employer:
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


$ 5154
in 90 days
$ 2474
in 20 days
$ 3092
in 90 days
$ 1894
in 30 days
$ 2500
in 3 days
Hire sinharavi
$ 2368
in 3 days
Hire takasoft
$ 2777
in 30 days
$ 1500
in 25 days
$ 2500
in 3 days
Hire indivar
$ 2526
in 25 days