Software Requirements Project

CANCELLED
Bids
3
Avg Bid (USD)
$257
Project Budget (USD)
$30 - $100

Project Description:
Requirement Item Project Requirement

Document Format At a minimum, use Template ‘D’ (page 423) from your book. Use the 3 samples I provide you to assist with format
Vision or Mission Statement You write it, I approve it
Stakeholders List at least 6 stakeholders in a stakeholder management list (Table). Us e the hierarchy in appdx ‘D’.
Operators 3 operator roles. These are people in your first inner ring of the onion model…those who are a part of the system.
Negative stakeholders List two, different from above
Goals At least 1 goal per stakeholder. With each goal, list obstacles and threats.
Rich Picture 1 complete picture that shows all stakeholders and their relationship and process. Mimic the book.
Should show at least one of each:
• Influence
• Relationships
• Transactions
• Processes
• Risks
Interfaces Minimum of 2 interfaces (Only system to system)
• Capture information direction
• What data transfers is involved
• Constraints
Context Diagram Shows interfaces and events in picture form. Show the two interfaces above (with their events) plus 3 other events.
Event handling Reflect Context Diagram (see page 88)
Scenarios Two Use Cases (Follow example on page 121)
1. Happy Path
2. Include 2 variations
3. Include 1 exception
4. Include 1 precondition
5. Include 1 post-condition (guarantee)
Scenario Write 2 Unwanted scenarios
Qualities and Constraints • Include 4 constraints. Describe in depth. Make it clear why these are constraints.
• Include 3 Development qualities. Describe in depth
• Include 10 Usage qualities. One sentence each.
Business Requirements 20 business requirements in a table format with rationale (Justification fields), priority and owner.
Functional Requirements 3 functional requirements for each business requirement. Show mapping to the BR.
Risk Capture 5 project risks and show traceability to BR
Project Dictionary 3 Roles (same as Operator roles)
5 Acronyms
12 Unique terms (project or industry)
(I will allow you to intermix these so long as you have 20 entries)

Skills required:
Software Testing
Additional Files: Sprint+2013+Software+Requirements+Project+Guidelines+%286%29.docx
Hire eyadabulafi
Project posted by:
eyadabulafi United States
Verified
Public Clarification Board
Bids are hidden by the project creator. Log in as the employer to view bids or to bid on this project.
You will not be able to bid on this project if you are not qualified in one of the job categories. To see your qualifications click here.


$ 385
in 14 days
Hire ann0710
$ 71
in 3 days
$ 315
in 60 days