login
Forgot?
Login with Facebook

Don't have an account? Register one now!

Operating Systems scheduler

Bids 
5
Avg Bid
$94 USD
CLOSED
  • Project ID:

    6963
  • Project Type:

    Fixed
  • Budget:

    $20-$100 USD

Project Description:

this is a class room assignment. deadline is 10/21/04

PART ONE
Implement a multi-level feedback Q scheduler satisfying the following requirements:
• The scheduler consists of 4 linear Q's.
• The first Q is FIFO, second Q is priority-based, third Q is SJF and the fourth (highest Priority) is round robin.
• Feedback occurs through aging, aging parameters differ, i.e., each Q has a different aging threshold (time) before a process can migrate to a higher priority Q. (should be a variable parameter for each Q).
• The time slot for the Round Robin Q is a variable parameter.
• Implement a switch (variable parameter) to allow choosing pre-emptive or non pre-emptive scheduling in the SJF, and priority-based Q's.
• Jobs cannot execute in a Q unless there are no jobs in all higher priority Q's.
• The jobs are to be created with the following fields in their PCB: Job number, arrival time, actual execution time, priority, Queue number (process type 1 - 4). The creation is done randomly; choose your own ranges for the different fields in the PCB definition.
• Output should indicate a time line, i.e., every time step, indicate which processes are created (if any), which ones are completed (if any), processes which aged in different Q's, etc.
• You should allow a variable context switching time to be specified by the user.

PART TWO
Very Important:
After completing the implementation and doing a few sample runs, start thinking of this problem as a multivariable optimization problem. From an algorithmic design point of view, you can think of this problem as a problem that involves the following parameters:
• Context Switching Time.
• Three Aging Parameters.
• Time slot.
• Two switches for Preemption/Non-preemption.
The eventual goal could be to optimize several (or some) performance measures (criteria) such as:
• Average waiting time.
• Average turnaround time.
• CPU utilization.
• Maximum turnaround time.
• Maximum wait time.
• CPU Throughput.
Perform several test runs and write a summation indicating how sensitive are some of the performance measures to some of the above parameters (or a combination of the above parameters). Include some of the results (time lines and/or graphs) with your observations and conclusions regarding the effect of changing the values of different parameters on the performance measures.

PART THREE:
Implement the above but have the process mix (the PCB's) created dynamically, i.e., jobs keep on arriving while the scheduler is running. i.e., create jobs at run time, use a randomizer to decide whether to generate a job (and its PCB) or not every time step, you can vary the probability of generating a job by playing around with your randomizer threshold (e.g., (rand leq 0.2) implies generate job with 0.2 probability, etc.)

PART FOUR (Required from graduate students) and Bonus Question (for undergraduate students):
• Don't use the actual execution time to do ordering and scheduling in the SJF Q, but use instead an estimation formula to estimate the execution time based on previously executed jobs of the same kind (i.e, ones that have arrived in the same initial Q)
• Implement an © updating scheme (sum of square difference method) for each one of the 4 © estimates.
• Study the effect of changing the four estimation Coefficients © (one for each Q), and the initial four estimates for execution time © (one for each Q), on the behavior of the performance measures.



Skills required:

C Programming

Project posted by:

bridgepro United States
(0 Reviews)

Last seen:

If you are the project creator or one of the bidders, please Log In for more options.


All Bids ()

siddhartha1 India
images.jpg
siddhartha1
India From India     Offline
  General Freelancer Orientation (90%, 98th percentile)
  Foundation LimeExchange Member
  Foundation EUFreelance.com Member
$100 in 3 days 
0
over 7 years ago
5.0

5.9

3 Reviews
97% Completion Rate
dear sir, pls check pmb
Maestros India
abhitech-logo.png
Maestros
India From India     Gold Member     Offline
  US English Level 1 (%, 46th percentile)
  Freelancer Orientation (80%, 97th percentile)
  Employer Orientation (80%, 99th percentile)
  Foundation EUFreelance.com Member
$80 in 8 days 
0
over 7 years ago
4.3

4.0

2 Reviews
79% Completion Rate
please check PMB for details
ccpplinux
logo-glu.jpg
ccpplinux
    Offline
  Foundation LimeExchange Member
  Foundation EUFreelance.com Member
$90 in 3 days 
0
over 7 years ago
5.0

3.5

3 Reviews
90% Completion Rate
Dear Sir/Madam, We have understood your project requirements. We can do it very smoothly and confidently in the time frame given by you, given you just accept our bid. Please see PMB for more details and accept our... more
Dear Sir/Madam, We have understood your project requirements. We can do it very smoothly and confidently in the time frame given by you, given you just accept our bid. Please see PMB for more details and accept our bid. Thanks ...  less
sujeethnair India
sujeethnair
India From India     Offline
$100 in 2 days 
0
over 7 years ago
0.0

0.0

0 Reviews
100% Completion Rate
I am an programmer+Lecturer of Computer Science. Since i hav experience of such problems, i can assure that i will be able to complete the work within time
tanuj99 India
tanuj99
India From India     Offline
$100 in 5 days 
0
over 7 years ago
0.0

0.0

0 Reviews
100% Completion Rate
please see pmb for details