online
Online now
Hire Me!
Rate: $30.00 USD/hour
Follow Invite to Project
 

ProDataAnalyzer

Professional Statistical Analyst, Econometrician and Data Scientist

Username: ProDataAnalyzer

  • Has not made a deposit.
  • Has verified their email address.
  • Has completed their profile.
  • Has verified their secure phone number.
  • Verified
  • Payment is not verified.

Location: Dhaka, Bangladesh

Member since: December 2011

Reputation:

4.8/5

(64 reviews)

6.2
[see more]

5 users have recommended this freelancer.

My projects:

  • €105.00 EUR
    4.2
    Profile image for Seller Philmster

    Philmster

    7 days ago

    Great expertise in Stata. It was a very time critical project and the delivery was slightly delayed, but it was ok. Quality was as good as it gets. Overall good experience.<br/>

    Project Description:Dear Sir or Madam, I need a Stata expert for performing a probit regression on a given data set. Further existing probit regressions must be altered. The completion of the project is time critical,...
    [more]
  • $200.00 USD
    4.4
    Profile image for Seller cmetaxas

    cmetaxas

    10 days ago

    Good work on time!

    Project Description:We need to calculate sample size based on a sample population using statistical techniques. We need full technical explanation of how the sample size was calculated by describing formulaes and technique used...
    [more]
  • $175.00 USD
    5.0
    Profile image for Seller socialife600

    socialife600

    Jun 11, 2014

    Awesome job! Stats expert! Will def work with again in future.

    Project Description:I need some assistance with a project, in which I will need to use Structural Equation Modeling With AMOS, EQS, and LISREL. This project is very intense, and will take my business to another level. Let me know if interested...
    [more]
  • £300.00 GBP
    5.0
    Profile image for Seller UNWRITERS

    UNWRITERS

    Jun 1, 2014

    well done.. will definitely work again..

    Project Description:We need a professional who can work with LISREL software. The person must have the acces to the software and can be able to produce an interpreted tables from the software. We will send you the data and results of the SPSS for you to create a tables in LISREL...
    [more]
  • $90.00 USD
    5.0
    Profile image for Seller socialife600

    socialife600

    May 28, 2014

    Best tutor around! Hands down!

    Project Description:I need to pick up and do some additional tutoring. Thanks
    [more]
  • $65.00 USD
    5.0
    Profile image for Seller azzignments

    azzignments

    May 22, 2014

    real master in stats.... done it very professionally... definitely hire him again.

    Project Description:Business Statistics Assignment 3 days time
    [more]
  • $80.00 USD
    5.0
    Profile image for Seller socialife600

    socialife600

    May 18, 2014

    Very great work. Will definitely recommend!

    Project Description:I need help preparing for a math project. By your credentials, it appears you are adequate enough to handle this for me. Thanks
    [more]
  • $155.00 USD
    5.0
    Profile image for Seller EddieCo0ray

    EddieCo0ray

    May 14, 2014

    Did a fantastic job, minimal fuss, got it done EXACTLY on time which is nice. Will hire again.

    Project Description:An Econometrics project involving STATA. Two questions. Should only take 3 hours to complete. Needs to be done by/on 12/05/2014.
    [more]
  • £90.00 GBP
    5.0
    Profile image for Seller yazeedaboalola

    yazeedaboalola

    May 4, 2014

    Very satisfied with the job. looking forward to work again with them

    Project Description:I have a statistics coursework that requires testing correlation between factors in a certain study. The tests should be carried on SPSS. I have attached the coursework specification and the data needed...
    [more]
  • $120.00 USD
    4.8
    Profile image for Seller thlgege

    thlgege

    Apr 18, 2014

    Quick response and delivery. Suggested!

    Project Description:Hi there! I am currently working on a research project and I need little help with the analysis of a cross-sectional regression. What I need is a basic analysis (like correlations of variables, SE&#039;s means and stuff), a hypothesis testing and I need some advice on how to improve the model...
    [more]
    ProDataAnalyzer has not completed any projects.
  • $19 USD/hr In Progress

    Need to do some regression analysis.

  • [Sealed] /hr In Progress

    As noted before, I have 2 projects to work on and I&quot;d like to have you work on one of them.I have data from 1992-2009 and I need to examine the relationship between executive pay and performance over that period (panel data/longitudinal analysis).I need:1) do files2) help in loading tables3) cleaning data4) regression model specification5) assumptions testing6) reporting/charts/analysis of findings

    [more]
  • $1000 USD 5 days ago

    We have an instrument to aid individuals in understand which of seven spiritual energies are most are more prevalent. This is based on the esoteric philosophy of Alice Bailey, Madam Blavatsky, and others. There are presently 107 statements, although we do that a &quot;test&quot; version with 205. We need to determine both the validity and reliability of each statement. We presently have several Excel spreadsheets. One on reliability which proably just needs a review. I have included several Excel spreadsheets as examples. We would like the analysis completed within 30 days of the contact.

    [more]
  • $300 USD 5 days ago

    NOTE: ONLY NEED DATA ANALYSIS, NOTHING ELSE=====================The title of the paper is &quot;Market reaction to extreme events during crisis, evidence from the European bond market&quot; and is an event study. The professor has requested a 10 year benchmark for the bonds of the following countries: Greece, Portugal, Ireland, Germany, France and USA (although in the title says European bond market we would also like to compare the US bond market In order to cross check the results). We would like to obtain the daily cumulative returns 10 days before and days after the date of the event which triggers a significant price change. The event which can cause the extreme event could be a rating announcement, a natural disaster, a reputational damage, the fear of political instability etc.. Please see attached a similar paper in which one of the authors is the professor who has assigned to me the paper. The analysis of the data can be done by using EVIEWS SOFTWARE Also a big part of the paper should be consisted by a literature review. I attach a representative Article for the topic. Data & Testing methodologyResultsThe paper should only deal with government bonds (so no stocks or corporate bonds)When it comes to the data testing, we should specify the date of the event (for example the date that prime minister of Greece announced that help from the IMS is needed, date that several European officers have made announcements concerning the debt and ways to fight the crisis, dates of natural disasters and terrorist attacks, dates of rating announcements, dates of jump events etc) and then we should test the cumulative daily returns 10 before and 10 days after the event in order to test if the theories have any true base.need update asap.

    [more]
  • $50 USD 6 days ago

    Need help solving some statistical questions.

  • $600 USD 8 days ago

    research analysis of the paper and having numerical analysis and report of 50 pages and work with me parallel

  • €20 EUR/hr 9 days ago

    I need somebody experienced with STATA, e.g. programming .do files data manipulation and interpolation. Preferably has experience with panel data. Let me know you hour rate, I suspect this to be a short project less than 3 hours., moreover use the word ‘Logic’ in your bid so I know you are not a robot. I will contact you regarding details.

    [more]
  • £200 GBP 11 days ago

    Hello, i have some quantitative data that i would like you to analyse in report format complete with tables etc. The results are from a questionnaire aimed at respondents aged 16-24. Previous experience ideal. Please only place a bid if you have worked on a similar project before. Please begin your mini proposal with 23/12 to show you have read the brief and not just automatically applied for every job in sight. I look forward to hearing from you.Kind regards,J

    [more]
  • $112 USD 12 days ago

    Hello, I have dataset with about 10 variables and measured 0/1 output. I am looking for someone to perform logistical regression analysis and write statistical interpretation of results in about 0.5 - 1 page text. Description should be delivered what package was used and what analysis was performed.

    [more]
  • £120 GBP 15 days ago

    A qualified and reliable statistician to run t-tests and Levene&quot;s. My research design is pretest-posttest design. The test scores will be ready in Excel sheets for the statistician by end of July.

  • $10000 USD 16 days ago

    I need to predict bit occurrence from past bit string.I have a past bit string. it seems to be made from random bit generator.From the past string, need to predict next bit occurrence.I will give 2 part of bit string. one is past bit string, and another is one that must be predicted from past bit string by some formulas or model.i need a algorithm, not software.I am looking for skillful mathematics experts, especially, expert of random bit prediction.up to 80% of predict probability is OK.add 2 files , one is bit string generated in the past, another is one to be predicted from the past data.

    [more]
  • $120 USD 16 days ago

    The assignment is divided to three parts. All parts must be answered.

  • $50 USD 16 days ago

    My client is taking an statistic test this weekend so i will hire a savvy/master/expert in statistics!The topics covered are multiple regressions, some data analysis, simple linear regression, decision tree, type 2 error, etc.I will provide first a sample quiz just to make sure you are the right candidate, it will help you to know if you have the knoledge required and help me also to chose the right candidate.Please give me your lowest bid and i will give some extra dollars according to the final grade.Ej. >80% +$10>90% +$25=100% +$40but...

    [more]
  • [Sealed] 19 days ago

    Individual will be giving a set task to decipher and analyze based on requirements once the individual is chosen. Individual must be proficient in Statistics , Mathematics, and algorithm analyzing

  • $66 CAD 19 days ago

    few questions to be done by using microsoft excel.

  • £15 GBP/hr 25 days ago

    MSC level thesis on FX Details will be provided on enquiry

  • $300 USD 26 days ago

    I help companies manage their transportation spend and I need a way to measure cost savings that my company has delivered against what their costs would have been if they continued to ship products in the manner they have historically. I need a method for measuring what their costs would have been by using past shipment data and a formula by factoring in weight, miles traveled during the month, and the increase/decrease in fuel surcharge.The are variables that come into play, like: fuel cost, distance of shipments, weight per shipment to consider. I realize that it can’t be perfectly accurate, however, I’d like to be able to provide a “you would have spent this amount” estimate based on a formula that would be accurate within +or- x%.I want to use a year over year analysis - example: November 2013 vs November 2014. When November 2014 comes, I’d like to be able to enter total weight, miles, and a fuel surcharge amount and have the model give me a total cost of what they would have spent had they continued with their strategy they used a year ago. I have two months of recent data and a fuel surcharge matrix - fuel currently represents 30% of total cost and moves up and down depending upon the price of fuel. What ideas do you have to be able to build a google spreadsheet for me to help me estimate what costs for client would have been given past shipment history?

    [more]
  • $120 USD 26 days ago

    need help with descriptive analysis of 32 data. no hypotheses, need charts/ tabulations. will provide detail information later.

  • $200 USD Jun 11, 2014

    I have a set of data composed of 5 arrays and would like to find out the correlation between the data. I need someone whose especially is statistics. I also need a report. Each array is about 20,000 data points.

    [more]
  • $500 USD Jun 8, 2014

    Applied Business Statistics II BUS 255- (online)Summer 2014starts from tomorrow and ends on july 27thExam Policies1.There will be a total of four exams. The first three will be taken online and the fourth (the final exam) will be given on campus. Together the exams will account for 80% of your grade. Your lowest score of the four will be weighted less heavily (15%) and your highest scores will be weighted more heavily (25%). The middle two exams will each account for 20% of the grade.2.You are to do all your exams by yourself without assistance from any other person.3.Once you begin an online exam there will be a limited amount of time to complete it.4.For the final exam that is given on campus you need to bring a calculator (no cell phones permitted) and you may bring one page of notes to assist you. This should be on a standard size sheet of paper (8 ½ x 11) using both sides.Connect Plus (for homework and ebook access)To register to use Connect Plus:1.Go to: http://connect.mcgraw-hill.com/class/dr_r-r_spring_2014_online2.Click “REGISTER Now”3.Enter you email address4.Choose one of the these options:•If you previously bought Connect Plus for BUS 245, enter the email address you used previously, it will then ask you for your previously created Connect password. Say Yes to registering and follow the on screen instructions.•If you bought at the bookstore enter your “Registration Code”•To buy directly online (for $120), click “BUY Online” DO NOT buy the $50 version which does NOT include the ebook unless you have a hard copy of the text.The most effective means of learning the material and doing well on the exams is to spend time working the homework problems, and working additional problems from the textbook. Homework in ConnectThere are three types of assignments in Connect. All of them have a specified due date and time, but you have unlimited time to work on each one, and they can be submitted more than once, with your best score being used towards your homework grade. DO NOT wait until the last minute to begin assignments because this may not give you enough time and you will not have the opportunity to get questions answered. The three types of assignments are:1.Learn Smart Modules – There is one of these per chapter. You are given each question and before answering, you enter how certain you are that you know the right answer, then you answer the question. If you get it wrong, it shows you the correct answer (to help you learn it) and then later comes back to the same (or a similar) question. It keeps doing this until you have answered all the questions correctly. So if you keep working on it until it’s complete, you will have 100% for Learn Smart assignments.2.Homework Assignments – There are several of these per chapter (about 20 total for the semester). The chapter and section(s) of the text book that the assignment comes from are given in the assignment name. Helpful tools in Connect include:• There is a “check my work” feature that will tell you whether your answers are correct or not. If they are not correct you can try again.• Many of them have a “View hint” feature that leads to a “Guided Example” video that works through a similar problem. •There is an “ask my instructor a question” feature that allows you to type in a question. This feature allows me to see the question and what answers you have entered. •There is an “ebook and resources” feature that will take you to the specific part of the text book when the given topic is covered. Late work will not be accepted. There will be about 28 assignments on Connect during the semester. Your homework grade will be the average of your best 14. (or whatever is half of the total number of assignments on Sakai not counting the test) Also read the document called “Using Connect Plus” that is posted on Sakai. Click on “Resources” to reach the posted files.

    [more]
  • $30 USD May 31, 2014

    Hi, i am looking for someone to analyze a set of data for me, the data is already prepared for SPSS, just need to do factor analysis, regressions etc

  • $150 USD May 8, 2014

    Selection criteriaStructure Literature review ( I need to full 4 table summary of 8 studies ) then write result chapter .i need my work via 4 days .if you can please send me respond !!!Title of dissertation The effectiveness of Lifestyle and psychosocial intervention among child obesity 5-17 yearsWe selected randomised controlled trials (RCTs) of lifestyle (i.e. dietary, physical activity and/or behavioural therapy), psychosocial interventions for treating obesity in children (mean age under 5-17 years) .minimum of 3 weeks follow up 2 years……..,English language2004-2014The Tool consists of 6 criteria for methodology quality assessment; selection bias ,study design (collocation),confounders, blinding, data collection methods and withdrawal and dropoutsResult chapter (2000 wards)Regardsfaad ‪

    [more]
    ProDataAnalyzer does not have any open projects.
    ProDataAnalyzer does not have any work in progress.
[see more]

Portfolio

[see more]

Résumé

Experience

Lecturer in Statistics

Jul 2005 - Present (9 years)

Department of Statistics

As a teacher in Statistics in a graduate level college, I have to deliver class lecture, provide assistance to the students for weekly assignments, guide Masters level students for dissertation writing and prepare multimedia class documentations for class delivery.

Senior Research Analyst

Jan 2003 - Jun 2005 (2 years)

Institute of Biostatistical Research

Major responsibilities:<br />1. Questionnaire design and pilot survey<br />2. Sample size determination<br />3. Survey management<br />4. Data validation and cleaning<br />5. Database management with SPSS/STATA<br />6. Statistical analysis of data and report writing<br />7. Analysis of data for publication.<br />

Education

MSc in Statistics and Econometrics

University of Chittagong

2004-2006

BSc. (Honours) in Statistics

University of Chittagong

2000-2004

Certifications

Certificate on ICT

National University of Bangladesh

A 6 month duration training was held on comprehensive use of ICT in various sectors now a days and awarded a certificate after successful completion of the course.