Asp image gallery change order drag drop jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    311,777 asp image gallery change order drag drop jobs found, pricing in USD

    need small background colour change in home page in wordpress website and need to transfer whole website from current hosting new hosting

    $17 (Avg Bid)
    $17 Avg Bid
    33 bids

    Hi, I am looking some help in classic ASP application. Please let me know, if anyone can connect through webex. Thank you. It is bit urgent.

    $42 (Avg Bid)
    $42 Avg Bid
    2 bids

    apply bacterial foraging technique for image edge detection. should be implemented in [login to view URL] ref paper will be given. the program should accept jpg,bmp and png images of sizes 128x128 and 256x256. results should be analyzed comparing with sobel and canny operator [login to view URL] hamming distance as done in reference paper.

    $119 (Avg Bid)
    $119 Avg Bid
    5 bids

    Hi, We are looking to have a forms system setup. Basically the point will be for job reporting. An employee will login, they will then have a few feilds to fill out to submit a report. Some of the fields will be basic text, others will be drop down, while others will be lookup fields. In order to keep the form as simple as possible, we will need the end user who is submitting the form to have t...

    $190 (Avg Bid)
    $190 Avg Bid
    36 bids

    Hi, I need to make an image/face wink and smile. Total video needs to be approx 10 seconds. Supplied is similar image to be used (will be supplied) and similar style wanted. [login to view URL]

    $174 (Avg Bid)
    $174 Avg Bid
    16 bids

    You are creating an animation based on the attached aquarelle. The different strokes should appear gradually in the screen. You may separate it into different colors and deform it or liquify it with a blur perhaps. The idea is simply for the animation to look as if the aquarelle is being painted but this is easier said than done of course. In the process it should be visible how the ink is absorb...

    $11 (Avg Bid)
    $11
    0 entries
    logo design 6 days left

    I want to create my website same to same as [login to view URL] i can pay whatever you want but i want my website in just 15 days.

    $2132 (Avg Bid)
    $2132 Avg Bid
    10 bids

    Might be some customization required. it is WordPress Please check the attachment for the Layout. Don't bid unless checking

    $20 (Avg Bid)
    $20 Avg Bid
    6 bids

    Currently we have to MANUALLY add image + title of new posts to our homepage. We would like someone to update the container on the homepage so it will AUTOMATICALLY show the image and title of the most recent four posts. This way we do not have to update the homepage manually every time there is a new post. This is a WordPress website.

    $141 (Avg Bid)
    $141 Avg Bid
    41 bids

    The task is related to IOT and LoRa in particular. The initial references are provided and survey the papers and write a 3 to 4 page summary of them (Particularly the PHY layer). Specify your IOT related experience in the bids. Please drop your PREVIOUS WORK RELATING TO LORA OR IOT (or academic writing) in general to look into.

    $97 (Avg Bid)
    $97 Avg Bid
    29 bids

    I have a rigged 3D character model, but I want to have some changes made to the textures. See the attached image '[login to view URL]' to see the model with current textures. I want to end up with two versions of the character. For both the first and the second version, the following changes should be made to the textures: - the character currently has bare hands, I want him to have gr...

    $193 (Avg Bid)
    $193 Avg Bid
    26 bids
    Web-service App 6 days left
    VERIFIED

    Hi, The Tasks at hand are as follows: 1: Connect To API to fetch data for Football Teams 2: Display the Data How? - Have a blank page with two Drop Down Menus, where a user can select Data for different leagues/Competitions, under which we select different teams. a. Divide the Data into two sections - Likes and Dislikes (Will show which data will fall into which category, how to categorise the...

    $41 (Avg Bid)
    $41 Avg Bid
    14 bids

    Hello, we need a time keeper tool, which imposes an independent allocation of working time by each employee. It is allocated in three dimensions: Process / activity Country / business unit or â without client Standard vs. ad hoc tasks This is how the process looks like: 1. User Log In to system 2. User Create a new entry 3. User choose the right date (the day the entry applies) 4. User c...

    $2431 (Avg Bid)
    $2431 Avg Bid
    36 bids

    Hello, I need a script in python 3.x, that for given input (numeric values) will generate one image. Image will consist of few number fields (text), few bars with percentage values and some icons (applied to final image from external files). It should also take background and some constant parts from external files. I will send image in Sketch/Figma format and jpg/png for those who are interested...

    $132 (Avg Bid)
    $132 Avg Bid
    27 bids

    Looking for some creative designers on a freelance basis. The work revolves around designing the creatives/logo for the app. Kindly drop a msg or comment if interested. #freelance #designers #designing

    $20 (Avg Bid)
    $20 Avg Bid
    29 bids

    Hi, I have a screenshot of a phone conversation. I created a video of my iPhone showing the conversation. I need 6 numbers of the phone number on the iPhone in the video changed. The video is 10 seconds. If you can change the phone number on the video perfectly please bid. Deadline is 2 hours.

    $62 (Avg Bid)
    $62 Avg Bid
    25 bids

    I WANT TO BUILD WORDPRESS THEME OR SITE FROM HTML TEMPLATE ACCORDING TO THE DOCUMENT 100% I WANT TO CREATE THE THEME IN ONE LANGUAGE JUST IN RTL WITHOUT BUGS AND ISSUES "I WANT THE THEME DEVELOPED WITH BOOTSTRAP " ALSO I WELL PROVIDE HTML TEMPLATES AND DROP AND DRAG PLUGIN "IF YOU HAVE BETTER METHOD TO FOR DESIGN DROP AND DRAG ITEMS IN THE DOCUMENT TELL ME ABOUT IT ___________...

    $600 (Avg Bid)
    $600 Avg Bid
    37 bids
    Trophy icon Custom Icon Set for Website 13 days left

    I need a set of custom vector icons for a website. These need to all follow the same design theme and work well together. Delivered in individual .AI illustrator files. Each icon needs to work well on a light background color. In total about 27 Icons. Configurator Icons Two Versions needed for these. 1st version used to indicate that no selection has been chosen - I’m thinking either a str...

    $300 (Avg Bid)
    Featured Guaranteed
    $300
    1 entries

    This is my landing: [login to view URL] It is responsive. I want to add this image above the title "VIRTUAL SWITCHBOARD - NO PERMANENCE, NO INITIAL INVESTMENT.": [login to view URL], and I want it to be shown only for desktop devices. Also, I want to add this image above the title "VIRTUAL SWITCHBOARD - NO PERMANENCE, NO INITIAL INVESTMENT.": [login to view URL], and I want i...

    $26 (Avg Bid)
    $26 Avg Bid
    37 bids
    Image designing for Ecommerce 6 days left
    VERIFIED

    Hi, I am looking for someone who can design images for me for Ecommerce portals. The images needs to be edited and then needs to be designed along with text and other features in one image.

    $22 (Avg Bid)
    $22 Avg Bid
    20 bids

    build three column boxes Total 6 in a roll: -Responsive (using our current css or just add a custome css -each box with a picture and add select drop down options..... - buy button - trial button - whole frame with shadow

    $19 (Avg Bid)
    $19 Avg Bid
    48 bids

    At this site [login to view URL], there is a type effect at the main banner. I Need to make this effect loop only once and stop at the last word. The code is in a script tag at the end of file.

    $22 (Avg Bid)
    $22 Avg Bid
    19 bids

    When finished, I will have two sets of files. One referring to order details from ebay, and one for Amazon. I assume there will be some API integration details required too, and some authorisation codes that we will need to set up. I will be duplicating this for more than one ebay/amazon account so need to be able to set them up myself. The order details will be such that I can enter them via P...

    $228 (Avg Bid)
    $228 Avg Bid
    25 bids
    $92 Avg Bid
    14 bids

    To copy questionnaire answers on a spreadsheet into one Word report per respondent (4 respondents). Workflow: 1. copy answer from Excel 2. paste into a Word doc (matching style) 3. drag in an image next to the pasted text in Word. 139 answers to copy/paste x 4 documents. I have done the first report so will provide Word document example for you to use as your template for the remaining 4.

    $5 / hr (Avg Bid)
    $5 / hr Avg Bid
    144 bids
    Change host on api command 6 days left
    VERIFIED

    I need some changes to an existing website , change master server host on api command server side

    $30 (Avg Bid)
    $30 Avg Bid
    13 bids

    we need some image for our website front page. I need a graphics designer for this. my business is related to solar design consultancy.

    $20 (Avg Bid)
    $20 Avg Bid
    26 bids

    Current website is [login to view URL] which is built using hosting software (dedicated company). I'm looking for the new site to be built on wordpress but to look exact (or very similar) to the current site. Drop down menu, categories etc to be kept the same url. I will get dedicated hosting elsewhere.

    $251 (Avg Bid)
    $251 Avg Bid
    139 bids
    website forum 6 days left
    VERIFIED

    We are a company that is mainly dedicated to the maintenance business. Within our services include that our customers can access an internal forum where they see the interventions made, parts of jobs etc. We are currently working with a for phpBB version 3.0.8. The structure of the forum that we want is the following: There are a series of forums grouped by countries, which within have grouped ...

    $598 (Avg Bid)
    $598 Avg Bid
    78 bids
    Back Order Shopify App 6 days left
    VERIFIED

    We need an app like this [login to view URL] we need it in PHP [login to view URL] no without a framework We need 100% the same as we will host on our site. I need you to install the Application and check the functionality. For you to bid on this project you need to go install the app as its 7 days once you do. Please install the app and share the screen shot. Once you see the app you will be ...

    $290 (Avg Bid)
    $290 Avg Bid
    17 bids

    Hi All, I am looking for a 3d style logo for a company i am calling "Artificial Intelligence Security" or "A.I Security" i am looking for samples of what work you have done and small images of what you are capable of doing. I will pay for the larger 3D image work as i want this to be printed on tshirts and transparent and white background for website as well as Vector image f...

    $84 (Avg Bid)
    $84 Avg Bid
    48 bids

    Hello, Am planning provide bulk sms service and looking for creating a website for it. Need a creative design Domain/Brand name is created have crated fb page with sample logo and all i have gone through themeforest and didn't liked any theme to be better Looking for trendy/modern designs similar to Fonedynamics, Exotel, illustration idea similar to iterable( [login to view URL] [login t...

    $127 (Avg Bid)
    $127 Avg Bid
    17 bids

    We have created this quiz [login to view URL] and have got it this far and the first question works as we want but after submitting the first question the section styles drop on the checkboxes and radio buttons, and the name changes on the button. We are using this plugin [login to view URL] to create the quiz but do not what to edit its contents so that we are still able to update it. All edits...

    $20 (Avg Bid)
    $20 Avg Bid
    18 bids

    We have a number of ongoing projects and need the following developers to work from our office (on site). Please drop me a message for more details. - .Net Programmers - React Native - React.Js - Node.Js

    $7 / hr (Avg Bid)
    $7 / hr Avg Bid
    15 bids

    Branding exercise for our technology conference later this year. We have existing brand guidelines but we'd like to make the event super enticing with great creative using the key theme: The future of work. I want to see a sci-fi element to the creative as we will be discussing: Robots, AI, space technology, design aesthetics, automation, the gig economy etc. - require a themed logo for th...

    $14 / hr (Avg Bid)
    $14 / hr Avg Bid
    33 bids

    Our website is [login to view URL] and serving wedding couples on wedding transport plus related services. Looking to revamp the entire content so that it can be a professional entity and at the same time align with google's ranking

    $28 (Avg Bid)
    $28 Avg Bid
    33 bids
    Image Retouch 6 days left
    VERIFIED

    Please retouch the images for school advertisement. We have have some photos without students, but we need some photos with Japanese adult students on the photos. So please retouch the photos to look many adult students in there. We need 2 types of photos. 1. many adult students are sitting learning facing the screen 2. many adult students are having a party with wines and Italian food. 3. Restau...

    $23 (Avg Bid)
    $23 Avg Bid
    47 bids

    OUTLINE OF FUNCTION REQUIRED It will allow you to create holistic custom Odoo applications without Python programming. Moreover, you can develop your own models, actions, views as well as menus with this. LIST OF SPECIFIC FUNCTIONS REQUIRED • Drag and Drop From Builder that makes it super easy and quick to add customizations • Activate new views such as Kanban, calendar, form, graph, ...

    $383 (Avg Bid)
    $383 Avg Bid
    18 bids

    We are a software solution provider with several products too in our kitty. We need a creative display of the brochure of our company. Content will be provided. Please drop in few samples of your creation to access your previous work

    $82 (Avg Bid)
    $82 Avg Bid
    39 bids
    Image to text 6 days left

    I have two images that I need to transfer to excel

    $12 (Avg Bid)
    $12 Avg Bid
    8 bids

    Requirements : Decent internet, Basic english level. We provide the opportunity for almost anyone to work from home/part-time/freelance to generate side income. We pay on a per-job completion basis (estimated 5-6 hours of work @7$ per job complete). You can take on multiple jobs at a time. Work faster, earn more! Job is simple. Simply drag and drop wrongly classified vehicles in their correct ...

    $17 (Avg Bid)
    $17 Avg Bid
    52 bids

    Need quick turnaround to convert Screen (Facebook Home page like) to React Native app (with static data). You can either use NativeBase or react component for designing the app. Attachment has the screen & required graphic assets

    $20 (Avg Bid)
    $20 Avg Bid
    3 bids

    We are in need of MIDI Player VST Plugin Interface includes the following: MIDI File Name display MIDI Folder Select Left & Right buttons to switch between MIDI files Functionality includes the following: Read MIDI and play in sync with a sequencer's time clock The MIDI play start time triggered by any MIDI note in a sequencer Drag & Drop MIDI file by clicking the MIDI File Name dis...

    $500 (Avg Bid)
    $500 Avg Bid
    4 bids

    I have a PDF file that I would like to recreate. It is currently set up for online viewing, and not printing. I would like to remove data from 2 out of 6 columns and have clean page breaks placed into the file for easy printing. I need this completed in the next 8 hours. Private message me for the file and confirmation you can complete the project over the next 8 hours. I need to remove the fir...

    $23 (Avg Bid)
    $23 Avg Bid
    22 bids

    Can u develop a software to be able to change Nokia c2-01 imedi

    $1238 (Avg Bid)
    $1238 Avg Bid
    6 bids

    I have two images that I need to have fixed made into high resolution so that I can print on our team shirts.

    $64 (Avg Bid)
    $64 Avg Bid
    34 bids

    I need some graphic design. I'm looking for designer who is able to draw a unique designs. At this time I plan to order 2 T-shirt designs for my Amazon Merch store. One example is in attachment.

    $27 (Avg Bid)
    $27 Avg Bid
    11 bids

    I need a python script to watch a folder for new images. The script will update a locally hosted html page utilizing jquery to display a grid of all the images. The gallery will show options to send the image file via SMS (via twillio API), email (via sendgrid), and the option to launch a print script on the server. I believe this would be a rather simple project, I just don't have the skil...

    $134 (Avg Bid)
    $134 Avg Bid
    11 bids

    Just need some logo's adjusted for my sock company

    $45 (Avg Bid)
    $45 Avg Bid
    56 bids

    I need you to write some content for a website. Need original content - business description/about me. Must be seo optimized. 400 word minimum. small business (one owner/employee) female owner local business offering professional pet services including dog walking, pet care drop-in visits, small breed dog boarding, hikes, wedding day pet chauffeur more information/reference material will be...

    $25 (Avg Bid)
    $25 Avg Bid
    27 bids