Magento 2 change order number prefix jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    176,068 magento 2 change order number prefix jobs found, pricing in USD

    Looking for long term full stack developer to build our order form website. But this website don't include payment function. Only bid expert.

    $183 (Avg Bid)
    $183 Avg Bid
    49 bids

    SCOPE: - 66 product photos (approx. 17 products). See uploaded examples. REQUIREMENT: Change background colour/resize edit kids fashion product images including: - improve lighting, remove any discolouration, position product angle correctly. - change background colour: #e6e6e6 - resizing (portrait dimensions) 1600px x 2000 px. 300 dpi - pants to have border: 2.5cm x 2.5cm, Long Sleeve tops border...

    $54 (Avg Bid)
    $54 Avg Bid
    47 bids

    We have operate multi channel ecommerce store , now we want to develop our inventory management and order management that connect inventory and logistic

    $498 (Avg Bid)
    $498 Avg Bid
    39 bids

    Please visit : - [login to view URL] Website is designed in Magento 1. We are looking for Freelancer to change overall UI / UX design of website and make it user friendly and SEO Friendly. Having good knowledge of Magento (PHP) Expert to Update, Design, Develop custom Modules. Change design of home page , product page , cart page and checkout page.

    $781 (Avg Bid)
    $781 Avg Bid
    35 bids

    My name is Virey. I am looking for someone to help removing the sqlite from the app and implement the Firebase Cloud Store database, then fix any issues that arises from removing sqlite. If you think that you could do it, please give me a quote or we could discuss further in details. I have two collections which I set them up for the Firebase Cloud Store database. The data in Firebase is the same ...

    $1035 (Avg Bid)
    $1035 Avg Bid
    59 bids

    Need an install to easily fix URL Rewriting and Reindexing in Magento. Products are exported and imported frequently and since URL Rewriting and Reindexing is not working nothing displays correctly.

    $34 (Avg Bid)
    $34 Avg Bid
    19 bids

    I need some graphic design. We have designed boxes and covers that we need some quick changes on. our regular designer is on vacation so he cannot attend to this now.

    $24 (Avg Bid)
    $24 Avg Bid
    40 bids
    change themes 6 days left

    I want my original content and images moved to a new theme. The new theme is for carpet cleaning but I want to use oit for house cleaning

    $142 (Avg Bid)
    $142 Avg Bid
    53 bids

    8 photos that need editing 1. all photos to be brightened & shadows removed 2. All tattoos & necklaces to be edited out 3. all photos with Blue crop and tights needs to have crop and tights changed to another colour. ***these need to look realistic and unedited - no filters.

    $20 (Avg Bid)
    Guaranteed
    $20
    13 entries

    Magento 2 already migrated. Need to do: 1. Setting VPS for Magento 2. PHP setting. 2. Magento 2 speed optimization 3. Setting VPS for Magento 2 mail notification 4. Install Elastic Engine 5. Test function 6. Transfer data (DB) from the current website. VPS with root. Time for the project, 2 days.

    $443 (Avg Bid)
    $443 Avg Bid
    54 bids

    Hi Sreeraj V., I noticed your a that you had bid on a soap-error for magento. i have the same issue. is very urgent please contact me.

    $30 (Avg Bid)
    $30 Avg Bid
    1 bids

    I need a full magento install and setup created including integration with ebay and amazon using the m2e plugin. Existing eBay listings will need to be imported. (Using M2E) Im happy for the frontend to be a template or custom theme.

    $702 (Avg Bid)
    $702 Avg Bid
    44 bids

    I'm looking for 2 hours of tech assist completing theme troubleshooting on an update of Magento 2.2.5 to 2.3.2. The installation has been moved from a bitnami stack to a centos 7 stack. The theme paths have to be set and tested. Work to be done on a vpn to a local workstation with root access on the server.

    $143 (Avg Bid)
    $143 Avg Bid
    18 bids
    Magento Expert 6 days left

    We are looking for an excellent Magento Developer who are based on United States. For eCommerce Site.

    $50 / hr (Avg Bid)
    $50 / hr Avg Bid
    25 bids
    Magento Theme Installation 6 days left
    VERIFIED

    I've bought Wokiee Theme for Magento but I can't get it to work properly. After installation via SSH using Putty, I've got these errors on the image. I need someone to help me solve it so the template can work properly.

    $29 (Avg Bid)
    $29 Avg Bid
    20 bids

    DATA ENTRY: We are looking for a freelancer to join our team to undertake the data entry of new products for our Magento eCommerce website. We are currently adding 30-40 new products a week and have over 2000+ products that will need there descriptions updated. This will be ongoing work paid on an hourly basis for the work completed for the previous week for the right person that we can work wi...

    $13 / hr (Avg Bid)
    $13 / hr Avg Bid
    13 bids

    change a 4-page document, numbers and words

    $312 (Avg Bid)
    $312 Avg Bid
    43 bids

    DATA ENTRY: We are looking for a freelancer to join our team to undertake the data entry of new products for our Magento eCommerce website. We are currently adding 30-40 new products a week and have over 2000+ products that will need there descriptions updated. This will be ongoing work paid on an hourly basis for the work completed for the previous week for the right person that we can work wi...

    $18 / hr (Avg Bid)
    $18 / hr Avg Bid
    29 bids

    There is a process of migrating workstations and user accounts from the source to the target domain. This process is accompanied by renaming of user accounts (the prefix is ​​added, that is, it was "username", became xxx_username, where xxx_ is a constant, and "username" is the user accounts that was last logged on to this workstation). It is required to develop a script (ps1,...

    $50 (Avg Bid)
    $50 Avg Bid
    3 bids

    DATA ENTRY: We are looking for a freelancer to join our team to undertake the data entry of new products for our Magento eCommerce website. We are currently adding 30-40 new products a week and have over 2000+ products that will need there descriptions updated. This will be ongoing work paid on an hourly basis for the work completed for the previous week for the right person that we can work wi...

    $14 / hr (Avg Bid)
    $14 / hr Avg Bid
    27 bids

    We will change the name of our organizations app. We will also fix few bugs that occurred after we removed login with Facebook from our apps. We have one app but divided into 2 (Donor and Organizations apps). Coding is the same. It is in Objective C. Also we will sign our apple push services certificates.

    $67 (Avg Bid)
    $67 Avg Bid
    21 bids

    DATA ENTRY: We are looking for a freelancer to join our team to undertake the data entry of new products for our Magento eCommerce website. We are currently adding 30-40 new products a week and have over 2000+ products that will need there descriptions updated. This will be ongoing work paid on an hourly basis for the work completed for the previous week for the right person that we can work wi...

    $14 / hr (Avg Bid)
    $14 / hr Avg Bid
    33 bids

    migrate magento 2 to AWS migrate and prepare server on AWS to receive magento 2

    $43 (Avg Bid)
    $43 Avg Bid
    22 bids

    I own [login to view URL]://[login to view URL] and I have recently upgraded my site to Magento 2.3.2. My current dev is half way around the world and works on my site part time and sporadically as his side gig. I need a new developer who will: 1. finish the optimization process of the current build 2. coordinate fixes with my SEO company and marketing team 3. bring in specialty help to get pe...

    $1001 (Avg Bid)
    $1001 Avg Bid
    57 bids
    Build a Magento 2 Site 6 days left
    VERIFIED

    We have a website that is currently built on wordpress. We do not have any customers at this time as we just started the business. Magento 2 is already installed in a subfolder, but I need someone to customize a template so we can get started with our site. I am willing to evaluate people who can do custom themes as I might need a custom theme later down the road. But for now, we just need a nic...

    $489 (Avg Bid)
    $489 Avg Bid
    73 bids

    change the leather texture, draping the cover. more details in chat. regular work.

    $20 (Avg Bid)
    $20 Avg Bid
    2 bids

    [login to view URL] Looking at this animation and to be able to enter 20 transactions and edit the numbers from wordpress backend.

    $119 (Avg Bid)
    $119 Avg Bid
    12 bids

    all I need is to add additional 2 fields to schema , BRAND and MPN both of these are attributes of magento used in products and have values assigned to them I just want them to be in the schema.I suggest that we add these in product page just for these 2 so that they get added to the base schema I need these to be working in schema No global identifier provided (e.g. gtin, mpn, isbn) Missing fiel...

    $66 (Avg Bid)
    $66 Avg Bid
    11 bids

    We are a new app-development company who is looking to fortify our small team with out-sourced, sub-contracted work. We develop many apps IN-HOUSE, however our small firm makes it difficult to accept certain jobs. Rather than turn those clients down we have found ways to share the work with other developers, or even pass the jobs along totally in exchange for a commission. - Delivery company need...

    $2296 (Avg Bid)
    $2296 Avg Bid
    104 bids

    I am looking for a developer to fix some tasks for an ongoing project. This would be a test project to check the skills.

    $23 (Avg Bid)
    $23 Avg Bid
    6 bids
    $18 Avg Bid
    49 bids

    a new Magento 2 website is looking to wear a Theme from "[login to view URL]" I'm looking for Magento 2 Certified Designer who can handle the Theme installation, optimizing and tuning the design her and there such as homepage, footer & menu ... please note the project budget is very limited.

    $167 (Avg Bid)
    $167 Avg Bid
    53 bids

    We have multiple SEO Clients. We are looking for someone experienced with Wordpress, Shopify and Magento for our SEO Services - Must have over 6 years experience - On Page and Off Page SEO - Fix Website Performance - Image ALT Tags - Link Building (Manually)

    $106 (Avg Bid)
    $106 Avg Bid
    85 bids

    i have a photo That Need tobe Change Backgroung and Need Colour Correction and Make Photo Correct [login to view URL] Should Be Look Like New

    $12 (Avg Bid)
    $12 Avg Bid
    42 bids

    Hi, It's our first project on Freelancer so I thought I would be easier to record a video what needs to be done. You can watch the video via [login to view URL] In essence I'm looking for a PHP & JavaScript developer who can help me out with dynamically generated table rows for products with some according calculations. I'm looking forward to your replies. Kind regards, Fili...

    $27 / hr (Avg Bid)
    $27 / hr Avg Bid
    52 bids

    We want to change the filter option on a category page on a mobile device. We made a project description. The webshop is build in Magento 1.9 and we use the Porto Theme

    $191 (Avg Bid)
    $191 Avg Bid
    44 bids

    We need our forms to be able to use Salesforce/Pardot Form Handlers. Our current one is served server side and we need them to be browser side to attach cookies. We would like them to be similar to Contact Form 7 on Wordpress but for Drupal 7. Can someone please help?

    $167 (Avg Bid)
    $167 Avg Bid
    28 bids

    We would like to improve our search result for our catalog to be more searchable and detailed by name and keyword Our application Magento 2.3

    $141 (Avg Bid)
    $141 Avg Bid
    24 bids
    Data Clean up 6 days left
    VERIFIED

    Hello i am in need of Somebody who can dedicate 8-10 hours short term to clean up around 3500 entries on excel, the work is simple but each entry will take 5 mins to complete we have a magento website which was last updated in 2015 so many products are no longer available or prices has changed since, we require all work to be done on excel however i will supply my log in details for my supplie...

    $585 (Avg Bid)
    $585 Avg Bid
    121 bids

    Hi Sabbir H., I noticed your profile and would like to offer you my project. We can discuss any details over chat. [login to view URL] site from back up 2. Install new theme: [login to view URL] 3. Complete remove Sub theme porto_jsb from the system

    $96 (Avg Bid)
    $96 Avg Bid
    1 bids

    Hello, I'm looking for someone who can change text (45 text files) in the same html code. We have the template, you just need to change the text accordingly.

    $125 (Avg Bid)
    $125 Avg Bid
    67 bids

    Build me drop list form and install in Magento 2 it will sync with Checkout/My-account/order and reg table The form can auto filter Sub-districts in District; Districts in Province; Provinces in Country the form contains 2 countries (Laos & Thailand) Thailand has 76 Provinces, 878 Districts, 7255 Sub-districts. Laos has 18 Provinces, 148 Districts, 0 Sub-districts. I need this form in 2 La...

    $169 (Avg Bid)
    $169 Avg Bid
    68 bids

    You have to follow some sample of reports and do the in three parts which are available in attachment

    $19 (Avg Bid)
    $19 Avg Bid
    11 bids

    Using magento create fiverr like responsive website( magento because you will get maximum work ready /or can use plugins in that for example reviews, shopping cart etc..) NOTE: need same responsive desgin and functions, everything should be same in terms of design, quality and functions..

    $812 (Avg Bid)
    $812 Avg Bid
    31 bids

    I have a website - please check before applying: www.furryfriends.ae. There are constant updates in terms of products and pricing. I need someone I can easily work and communicate so English is a must.

    $7 / hr (Avg Bid)
    $7 / hr Avg Bid
    44 bids

    We are looking for an admin support to key in orders. Almost everyday, we receive orders from our clients through emails / fax. Some of them use excel file, some of them send scanned copy of their PO and so on. What we need to do is as below; 1. key in item number and quantity into an excel file (template will be given to you) from the order form (the format will be either excel file or PDF) with...

    $7 / hr (Avg Bid)
    $7 / hr Avg Bid
    26 bids

    Hi i need a ready built eCommerce site with backend order managemnet system must be clean and professional design and fast. Only ready

    $174 (Avg Bid)
    $174 Avg Bid
    32 bids
    Trophy icon Simplify / change a logo 5 days left

    We have an existing logo which we would like this changed / simplified. See attached and website (website is in the attached). The colors used should stay the same (white, black, and orange). Please only contact us through freelancer. Do not contact us through other means.

    $100 (Avg Bid)
    Guaranteed
    $100
    106 entries