Method statement environmental management program infra works jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    442,182 method statement environmental management program infra works jobs found, pricing in USD

    I want a salesman who give me per day sell by online and offline method in my given time. I have 1- sarees 2- watches 3- ladies dress 4- shoes 5- headphones. Person who able to give per day sell can only bid.

    min $34 / hr
    min $34 / hr
    0 bids

    I have a small list of numbers containing 16 bits integers. My list is limited to 32 numbers. I would like to use SSE with 256 bits registers (__m256i) The list is stored in TWO mm256 registers offering 32 slots. The value 0 means that a slot is free. Here are the operations I want to optimize: - free all slots containing a value greater than x - remove a value x - given some int16 values (not m...

    $10 - $36
    $10 - $36
    0 bids

    I need to build a LMS (Learning Management System) system using Moodle The system need to be dockerized A Mother System to management others School System The System need to be simple and intuitive, with a good navigation system and a Front End intuitive. I like a App to Android and iOs too.

    $382 (Avg Bid)
    $382 Avg Bid
    4 bids

    Need a proofreader to review website content so it looks more articulate and professional. We are an IT product company offering solutions for US insurance compliance management

    $33 / hr (Avg Bid)
    $33 / hr Avg Bid
    9 bids

    A freelance trainer and consultant on business strategy and sales and marketing management. Have written a book on specific management approach based on last 40 years and require the service of an editor who is specialised in management subject to edit the manuscript before publishing.

    $288 (Avg Bid)
    $288 Avg Bid
    15 bids

    We have many clients we need to hire an SEO expert for. we are looking for up to 5 hours a month roughly. This would be short term 6 months and longer term 12 months per client.

    $51 / hr (Avg Bid)
    $51 / hr Avg Bid
    24 bids

    We are seeking proposals for a developer or development team to build a new portfolio page in its career platform. The Portfolio page must meet the requirements below, match our style guide, and integrate with common brand elements. Problem Statement High School and College students lack a way to track projects, achievements, and experiences that don’t fit well on a resume. Presenting visib...

    $5000 (Avg Bid)
    $5000 Avg Bid
    1 bids

    Write a well written conclusion for this essay

    $17 (Avg Bid)
    $17 Avg Bid
    18 bids

    this a long term position (FULL TIME) the technologies including: - familiar with AWS & GCP services - CI/CD pipelines (Jenkins, circleci, gitlabci...) - Kubernetes management and troubleshooting - Familiar working with security areas (securing cloud apps) any experiences in securing blockchain technologies will be a huge plus - git management - Create and enhance the existing infra as code mo...

    $10 - $2000
    $10 - $2000
    0 bids

    0 - YOU MUST HAVE GITLAB USERNAME AND PULL REPOSITORY OF PROJECT 1 - I need laravel email notifications created [make:notification] 2 - I need these notifications created... each notification should send an email to the user_id specified notification_interested_jobs notification_application_sent notification_phone_interview notification_sell_virtual_interview_mastery notification_in_person_vi...

    $54 (Avg Bid)
    $54 Avg Bid
    4 bids

    unable to run the jquery, Vue js component in Internet explorer. AEM content management system. need live support to fix the issue. it doesn't need to be babel, browsify. need to generate [login to view URL] so that it can run in chrome and internet explorer

    $25 (Avg Bid)
    $25 Avg Bid
    4 bids
    python file 6 days left

    I have a python file that has the majority of this covered in it, but there are some methods left to add on. abstract class abstract method method overloading search functionality sort & sorted functions sort & sorted with lambda use of a variety of data structures writing to JSON file reading from JSON file code compiling comments added adherence to coding standards all code te...

    $124 (Avg Bid)
    $124 Avg Bid
    10 bids

    This is personal trial project which should be developed with very basic designing and simple programming methods. You will be designing a personal financial management tool which should be able to record income and expenses, produce reports sorted by dates or on a ranged date. It should be build on Visual Studio C#. The main views and basic requirements are included in the file uploaded. And wil...

    $120 (Avg Bid)
    $120 Avg Bid
    2 bids

    We are a small Residential and Commercial development company serving Los Angeles county. We pride ourselves on our workmanship, project management, and looking to create more leads and engagement using our social media platforms. We are really looking for someone local to Los Angeles or nearby to take on the work

    $359 (Avg Bid)
    $359 Avg Bid
    17 bids

    I LIKE TO DESIGN A PETROL STATION APPLICATION USING C# SCENARIO The festive season is around the corner and many families will be travelling to their holiday destinations. This period is a fantastic opportunity for ‘Fuelling Around, Ltd’ to make up for the lower than expected profits earlier in the year. They therefore must ensure that the petrol station is working at full capa...

    $532 (Avg Bid)
    $532 Avg Bid
    6 bids

    [login to view URL] [login to view URL] It has all the required .c and .h files. and main method too

    $35 (Avg Bid)
    $35 Avg Bid
    4 bids
    Java Program 6 days left

    Developing a Photo Management Application using eclipse or other for my self.

    $117 (Avg Bid)
    $117 Avg Bid
    15 bids

    need to change format of an invoice on a stock management system Work need to be submitted within 2-3 hours really urgent

    $25 (Avg Bid)
    $25 Avg Bid
    7 bids

    I have access to APIs and integration method for a given CRM/ Dealership but I need to send my form in proper ADF/XML format so they receive it correctly and parse it. If you have experience with ADF/XML protocol with Automotive CRM products, I would love to work with you on this quick project and long term project to be posted. In our ADF format, we would have customer/ buyer information (cont...

    $10 - $30
    $10 - $30
    0 bids

    I need some help with finding an accountant.

    $31 (Avg Bid)
    $31 Avg Bid
    8 bids

    *** DON'T WASTE TIME APPLYING WITHOUT A MEANINGFUL PROPOSAL*** our site currently has a PayPal Checkout. You would- Upgrade Keap to Infusionsoft. Setup 8-10 of products in Keap. Change website PayPal Checkout so that transaction are going through Keap Products. Setup a affiliate program in Keap Setup a Affiliate program registration page (something like refer a friend and get x% ...

    $415 (Avg Bid)
    $415 Avg Bid
    17 bids
    $15 Avg Bid
    1 bids

    Create a program that allows the monster (X) to move around the created maze. Provide the following program functionality: read the size of the maze as width x height, the playing field must be at least 5x5, create a border around the maze (so if playing field is 5*5 the border will be 6*6), make sure that there are random obstacles in the maze (of course, choose the appropriate ratio - so that ...

    $33 (Avg Bid)
    $33 Avg Bid
    6 bids

    Looking for SUBJECT EXPERT who have Master in Real Estate Management Construction for REAL ESTATE VALUATION AND APPRAISAL who can do the calculations

    $54 (Avg Bid)
    $54 Avg Bid
    1 bids

    i need a well designed and standard recruitment website with the best features and long term work. with samples of past works

    $421 (Avg Bid)
    $421 Avg Bid
    36 bids
    Build plugin for wizps.com 6 days left
    VERIFIED

    Build a WordPress plugin, that recites and/or shows in a selected number of different languages ‌(including sign language) in lines of different colours, a selected number of times or continuously, or from A to Z or randomly, or for a set time, sentences or paragraphs, or pictures or words of playing cards or a selected amount of sign language, word definitions, high-lighted text, pictures or...

    $305 (Avg Bid)
    $305 Avg Bid
    15 bids

    Nationwide Credit and Collection Outsourcing Services is one of India's leading organizations specializing in International Debt Collection and Customer Management. Established in 2012, aims at providing solutions to the NCCOSproblems of local and International Debt Recovery in India and in any country around the world. We have our presence in Mumbai, Gujarat, Bangalore, Hyderabad and have a ...

    $763 (Avg Bid)
    $763 Avg Bid
    1 bids

    We have an Android and iOS app that reads and writes from our sql database. Separately we have a web application written in Java which also reads and writes from same database. We have time of day issues across the system as the original Java wasn’t built to handle daylight savings time which occurs in some states of Australia. The apps were also not built to handle daylight savings time cor...

    $22 / hr (Avg Bid)
    $22 / hr Avg Bid
    29 bids

    This is personal trial project which should be developed with very basic designing and simple programming methods. You will be designing a personal financial management tool which should be able to record income and expenses, produce reports, and can also be used to predict your financial status at a future date based on expense patterns. Will be using basic addition and subtraction method for fin...

    $223 (Avg Bid)
    $223 Avg Bid
    8 bids

    I need a web application using java spring boot and MySQL database which a minimum number of web pages not less than 10 pages.

    $216 (Avg Bid)
    $216 Avg Bid
    15 bids

    Hi my name is Aaron, I am a second year engineering and management student. I have always loved food and technology and I have had an idea for an app that combines these in a brand new and exciting way! I need app designers to build this new food based social media app! It will have the 'usual' features including friends, direct and group messaging, liking, saving, commenting, etc. as we...

    $3088 (Avg Bid)
    $3088 Avg Bid
    51 bids

    Only interested in Philippines or Costa Rica Backpak ([login to view URL]) is a year old start up with contracts to build education portals for US families. Our founders have started and managed successful tech firms in Finance and are now turning to Education. We are seeking a small team of developers to work with our management remotely over the next few years as we develop the portfolio of...

    $16 / hr (Avg Bid)
    $16 / hr Avg Bid
    10 bids
    Bank Data entry in Odoo 6 days left
    VERIFIED

    I need someone to do data entry of bank records from bank statement to odoo accounts

    $3 / hr (Avg Bid)
    $3 / hr Avg Bid
    15 bids

    Requirements 1) Location Based Buy & Sell App 2) User can set their location 3) Upload Pet from User 4) Advanced Search Item 5) Items By Category 6) Categories List 7) Sub Categories List 8 ) Item Details 9) Firebase Chatting 10) Offer / Accept / Reject in between buyer and seller 11) Push Notification 12) User Favourite Pet 13) User Login, Register, and Logout 14) Follow User 15) Social Medi...

    $425 (Avg Bid)
    $425 Avg Bid
    5 bids

    Create a program that takes two csv files , then allows me to match the prices in file2 to file 1 , by picking the name. File 1 contains columns 1-8 , I need to replace the column called prices in file2 and replace it in file 1. You need to do the search by making sure productname1 = productname2 then{ code }

    $26 (Avg Bid)
    $26 Avg Bid
    10 bids

    I need someone to build a home bakers assistant app similar to [login to view URL] that also has a 3d cake designer similar to [login to view URL] The app will consist of a website in React/Firebase and a native mobile app(Android/iOS) with React Native/Firebase. When I say Firebase, I mean I want you to use the Firestore database and not the Realtime DB. The app helps home bakers with ingredien...

    $3780 (Avg Bid)
    $3780 Avg Bid
    2 bids

    Write Python program using SHA-512/ MD5 /Diffie-Hellman exchange protocol using predefined small text.

    $27 (Avg Bid)
    $27 Avg Bid
    7 bids

    I’d like to make business cards on vista print. Also, need a logo for my business card as well. I am Selling & Buying used/New/refurbished oxygen concentrators. Business Name: Respiration Nation You can check my website here to get an idea for my business. [login to view URL] The logo should be elegant, professional, and similar to the business. Would like to put the Referal program on ...

    $33 (Avg Bid)
    $33 Avg Bid
    75 bids

    I need you to write a research article. Research and analysis data about specific client based on the SPSS program

    $21 (Avg Bid)
    $21 Avg Bid
    14 bids
    PPC Management 6 days left

    I need help with managing my PPC Campaigns.

    $11 / hr (Avg Bid)
    $11 / hr Avg Bid
    29 bids

    developing an operations strategy for a study case in operations management class. see file for details

    $89 (Avg Bid)
    $89 Avg Bid
    49 bids

    Hello Taylor, On behalf of the management of Teleperformance, I am pleased to inform you that after reviewing your profile, the management sees you fit to occupy the position of a "Remote Data Entry" and you will be required to work from a remote / home office which will be set up for you by the management of Teleperformance. You have been scheduled for a Job briefing/Interview. you...

    $10 / hr (Avg Bid)
    $10 / hr Avg Bid
    1 bids

    Looking for : Front End & Back End Website development Responsibility : - Feature Development & Enhancement (time & date slot integration) - Create reporting dashboard on admin panel - Role setting management Language : – HTML + CSS + JavaScript – PHP & MySQL – Laravel – React JS, Node JS – Cpanel, GitHub

    $540 (Avg Bid)
    $540 Avg Bid
    46 bids

    will tell later in the chat for the project

    $47 (Avg Bid)
    $47 Avg Bid
    12 bids
    project evaluation -- 2 6 days left
    VERIFIED

    1.1 Introduction: 1.2 Project Definition: 1.3 Existing Flow: 1.4 Problem Statement: 1.5 Proposed Solution: 1.6 Objectives: 1.7 Motivation: 1.8 Project Overview: 1.9 Detail/Scope of Project: 2.1 Background 2.2 Limitation in Existing Systems: 2.3 How Our Proposed System Solve the Problems: 2.4 SDLC: 2.4.1 Required Analysis: 2.4.2 Designing: 2.4.3 Coding 2.4.4 Testing 2.4.5 Implementat...

    $11 (Avg Bid)
    $11 Avg Bid
    2 bids
    project evaluation 6 days left
    VERIFIED

    1.1 Introduction: 1.2 Project Definition: 1.3 Existing Flow: 1.4 Problem Statement: 1.5 Proposed Solution: 1.6 Objectives: 1.7 Motivation: 1.8 Project Overview: 1.9 Detail/Scope of Project: 2.1 Background 2.2 Limitation in Existing Systems: 2.3 How Our Proposed System Solve the Problems: 2.4 SDLC: 2.4.1 Required Analysis: 2.4.2 Designing: 2.4.3 Coding 2.4.4 Testing 2.4.5 Implementat...

    $111 (Avg Bid)
    $111 Avg Bid
    1 bids

    I am looking to hire multiple WordPress developers to help with the building of plugins/api wrappers for existing web applications. Main Goal: Tether/Bind these standalone web applications (each also has an API) to Wordpress users who sign up. Proposal Requirements: How long will it take to create each plugin/api wrapper (use the example below). How much for each plugin/wrapper for each app? (...

    $1261 (Avg Bid)
    $1261 Avg Bid
    30 bids