Msproject export excel selected fields jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    14,000 msproject export excel selected fields jobs found, pricing in USD

    result in column F needs to be the elapse time from column D minus E in hours and minutes. Also need the actual formula to copy and past myself on other similar calculations. I can only supply column D and E as shown.

    $27 (Avg Bid)
    $27 Avg Bid
    15 bids

    ...new interface to "WorldTracer" (a global bag tracing system from SITA). First an export interface to send delivery data to WorldTracer and second an import interface to replace an existing interface for the data import from WorldTracer to our system. Import and export is based on HTTP requests. Coordination during implementation and testing with SITA

    $739 (Avg Bid)
    $739 Avg Bid
    16 bids

    I just need help in exporting the SQL database ASAP

    $37 (Avg Bid)
    $37 Avg Bid
    12 bids

    We have wordpress based website and we need to do 3 things: 1- Add some missing fields in the user profile page in Buddypress (they are already in the database) 2- integrate the actual mailing app with a database (eg. sending emails to specific users according to a database) 3- Debug a current mailing ei. there a mailing system that is fully coded

    $94 (Avg Bid)
    $94 Avg Bid
    43 bids

    I need all data scraped from Google Maps from a particular region. This needs to be done within 2 weeks.

    $277 (Avg Bid)
    $277 Avg Bid
    70 bids

    i am using dokan lite for the site b2b multivendor ecommerce business details will be shared in chat plz bid if u r familiar with wordpress

    $16 (Avg Bid)
    $16 Avg Bid
    9 bids

    I am looking for angular expert who can fix my issue in 2 hours. Will share detail over chat

    $115 (Avg Bid)
    $115 Avg Bid
    10 bids

    I need a new website. I need you to design and build a website for my small business.

    $17 (Avg Bid)
    $17 Avg Bid
    7 bids

    We would like an ad (for recruiting students) to be posted in the internal networks of top Chinese universities. Accessing and posting in these networks require being affiliated with the university and have an email address, e.g., being a student in that university. You can bid for doing this project for the universities posted below. Once we give you the project, we will pay the agreed-upon mone...

    $83 (Avg Bid)
    $83 Avg Bid
    2 bids

    I want to add 2 custom header fields to the OpenFlow table. 1 buffer threshold (e.g. 80%) and 1 link bandwidth threshold (also in percent). An incoming flow is matched against that row only if the current link bandwidth or buffer usage is below their thresholds.

    $27 (Avg Bid)
    $27 Avg Bid
    2 bids

    i need a telegram script to run on a server that export any chat messages from channels and bots and parse it to a database it should also do a POST for every message parsed i found this on github iff it can be adapted im ok with it [login to view URL]

    $180 (Avg Bid)
    $180 Avg Bid
    13 bids

    Just a basic indoor positioning system app which will help me manually make a floor map with the help of wifi fingerprinting and magnetic field detection and show just two functions which is locate me and directions to a position.

    $133 (Avg Bid)
    $133 Avg Bid
    7 bids

    Simple work: Export events from the "The Event Calendar" plugin, to the "Event" custom type of the Wilcity Theme ([login to view URL]) Complication: For those who know "The Events Calendar" you should know that the address of the event is not included in the event, let me explain: An event

    $24 (Avg Bid)
    $24 Avg Bid
    6 bids

    ...of accounts so that you have accurate financial statements • Employee data : we have data in detail information in excel • Setting up customers and vendors : We have 3 customer & 10 vendors only . we can provide the data in excel .need help to setup in quick book • Connecting QuickBooks Online with our bank and credit card accounts to ensure all

    $122 (Avg Bid)
    $122 Avg Bid
    28 bids
    Export Photon Cloud + PLAFAB 3 days left
    VERIFIED

    hi are you familiar about photon cloud server with plafab ? [login to view URL] I will make payment with hourly, please bid if you are familiar about that. thanks

    $36 / hr (Avg Bid)
    $36 / hr Avg Bid
    17 bids

    ...ACF - PLEASE DO NOT APPLY FOR THIS PROJECT! I have a website using custom post types and ACF pro for custom fields. I need to build a large form that creates / edits custom post types and collects other information. I have all of the form fields and form groups needed, but I don't know the best way to set this up. This is great project for someone experienced

    $146 (Avg Bid)
    $146 Avg Bid
    11 bids

    I have some lists of products in my opencart system and i would like to export them in an Excel file. Also I want to be able to import an Excel file with my products so that those products will be shown on my website.

    $30 (Avg Bid)
    $30 Avg Bid
    19 bids

    I’d like an automated tool that fills the blank fields on the attached form “Ficha Cadastral Pessoa Fisica Individual”. The tool should have the following characteristics: 1) Each field in the form should be filled with the data from an specific cell in the excel file “Planilha Modelo – Importação”. 2) For each field in the PDF file &...

    $166 (Avg Bid)
    $166 Avg Bid
    26 bids

    Develop detailed workflow for .net function to manage payments related to import / export fees related to values of shipments. Please review attached document for further details

    $526 (Avg Bid)
    $526 Avg Bid
    18 bids

    We need to migrate the data from a Drupal site to a Joomla site. We have access to both db and data. The drupal's tables all already in the joomla's mysql. I use the component Cmigrator to migrate the data to joomla but CMigrator is not aware of custom drupal types and can't migrate them. The goal is to transfer the product pages with the respective images and PDF. Eg: [login to vi...

    $191 (Avg Bid)
    $191 Avg Bid
    41 bids

    Created via WP All Export, this keeps some characters in

    $26 (Avg Bid)
    $26 Avg Bid
    11 bids

    I have multiple 2gig text files full of keywords. I need a program that will search the text files for certain words i suggest, and export that entire word along with the accompanied keyword phrase on that particular line, into a new text file.

    $29 (Avg Bid)
    $29 Avg Bid
    11 bids

    ...articles as a content provider is already included in WidgetKit. But what is missing in the native Joomla! content provider, is the possibility to access Joomla! native CUSTOM FIELDS. There is alreday a documentation from YooTheme, which explains how to build a "custom content provider": [login to view URL] https://yootheme

    $165 (Avg Bid)
    $165 Avg Bid
    12 bids

    I Would like a plugin to generate xml of products of woocommerce including variations and to support polylang and wpml. allow to schedule feed generation.

    $60 (Avg Bid)
    $60 Avg Bid
    10 bids

    Hi, we are a french web agency and our client needs a website to s...his work to his clients. His job is to print the lead/plastic cylinder around the bottlenecks of wine bottles. So we need a 3d artist to modelize a texturized bottleneck and export it for three.js. We will provide the website with a simple image upload so he can change the texture.

    $459 (Avg Bid)
    $459 Avg Bid
    30 bids
    export data 4 hours left

    ...need to export all records data from an our old website application. We will give you access to our account to proceed with extraction The main process can be seen here (the video is in italian language, but is almost simple as that) [login to view URL] basically freelancer has to login, enter in a category, do selections, and export present

    $84 (Avg Bid)
    $84 Avg Bid
    24 bids

    Hello, I think this should be a simple problem for someone with some computer macro or scripting knowledge. I have an excel document that logs our chat sessions with our small business. I need a way to export the session data from one column and put just client part of the conversation in the next column. In the example uploaded file, The entire

    $42 (Avg Bid)
    $42 Avg Bid
    7 bids

    Need to export data from access into a file to send to data companies. Doesn't take long but can't remember how to get to the manager program to export the data.

    $27 (Avg Bid)
    $27 Avg Bid
    31 bids

    Hi there, We need custom ACF fields displayed in the Woocommerce catalog (shop) display instead of the normal product short description. We are working with the Flatsome Wordpress theme, having experience with that theme is preferred. Thanks for your submissions

    $31 (Avg Bid)
    $31 Avg Bid
    22 bids

    ...results with eight or more fields You will need to create a series of spreadsheets that has 8 or more fields have the results of the following search: 1. Search: “[login to view URL]” 2. Enter the search: “Medical waste” state, where state is each state in the United States The eight fields are: State Company Address

    $112 (Avg Bid)
    $112 Avg Bid
    52 bids

    Export all posts from Ghost CMS to Wordpress, maintaining slugs and images that was selected using Unplash. Unplash plugin would be great. Thats it!

    $52 (Avg Bid)
    $52 Avg Bid
    16 bids

    I need Catalog import and Orders export using Webservice API on Prestashop. On catalog we have to do some changes: Generate price depending of a margin that depends on Brand of product. And create specific price depends on Clients Group. I need something with experience on it.

    $130 (Avg Bid)
    $130 Avg Bid
    8 bids

    I need to write down two functions form a "standard" woocommerce export 1) If product tag is "nuovo", write "N" in csv, if it is "usato" write down "U", if "EX DEMO" write down E 2) i need to output a category custom meta (inserted via Toolset) for each product. For example, product is in category "test", and category te...

    $28 (Avg Bid)
    $28 Avg Bid
    13 bids

    I want to make my Wizard form able to capture selected value from multiple drop down and input field and display in a the same page (different tab). The value display must be able to be remove later.

    $127 (Avg Bid)
    $127 Avg Bid
    14 bids

    Hello we are into automobile industry dealing with spare parts and we are planning to introduce more products to our c...can source, who can negotiate and inspect the quality of the product, then ship the product to the given destination point. Some one who have good knowledge over import and export business and assisting buyers at every step needed.

    $384 (Avg Bid)
    $384 Avg Bid
    16 bids

    Hallo, I need now someone wich can help via Teamviewer to fix a Problem wich I am unable to understand. I have a Menu in my MainActivity. The MainActivity shows three Fragments. If I am on Fragement one, wich is the "Home"-Fragment, the Menu works, if I open another Fragment, the Menu still will be show, but the App Crashes. The Same Menu must be show on all Fragments, and the Menu-P...

    $19 (Avg Bid)
    $19 Avg Bid
    15 bids

    You have to know C++ and Ultimate++, DB. Then you can help me. Please bid on my project. Thanks.

    $152 (Avg Bid)
    $152 Avg Bid
    8 bids

    ...target, profile name, and scan description as parameters • Start the scan using openvas • Log start of scan • Periodically check progress and log progress • Log end of scan • Export scan report and convert to JSON • Process JSON removing redundant information • Log summary of scan • Save JSON file locally • Log end of the processing Running t...

    $296 (Avg Bid)
    $296 Avg Bid
    10 bids

    scrape data and export to excel

    $1 / hr (Avg Bid)
    $1 / hr Avg Bid
    39 bids

    The file needs to have the logo, then Dubai underneath, then Signify at the bottom right (same as on the example) attached. As an output, I need a .CDR and .AI files which can be open in CorelDRAW versions before 14. Example attached (just Dubai needs to be added from the .AI template. Keep the fonts as they are. Before award - I want to see a PDF version of what has been done.

    $10 (Avg Bid)
    Guaranteed
    $10
    10 entries

    ...file to Excel and Export back to XML Do not provide a solution using Excel Developer Tab -does not work Do not provide a solution using Excel Data Import > XML File - it does not work Do not provide solution using Note++ or Notepad - it does not meet what I need I have a file that is in XML format - I need it in format I can edit (ie..Excel) and

    $40 (Avg Bid)
    $40 Avg Bid
    7 bids

    Show me how to import XML to Excel ,make change to the Excel file , then export back to XML

    $19 (Avg Bid)
    $19 Avg Bid
    10 bids

    I can show my project with detalis after the contact. Thank you

    $212 (Avg Bid)
    $212 Avg Bid
    7 bids

    When a run a search on zillow, I want to be able to export the results to an excel file. I need information such as: Owner phone, public comment, address, days on zillow, etc. I do not want to have to click through each homes page to copy data.

    $131 (Avg Bid)
    $131 Avg Bid
    23 bids

    sketch To images export only mac user bid me max price 700

    $11 (Avg Bid)
    $11 Avg Bid
    4 bids

    ...API 3a. If an address is selected, the first address input field is to become the address 1 field with address 1 information (i.e. street number, street name, street type / unit number, street number, street name, street type), and Suburb, Country, Postcode would be filled out. 3b. If "can't find your address?" is selected, the first address field stays

    $23 (Avg Bid)
    $23 Avg Bid
    6 bids

    This is an easy task for laravel programmers: I'm using a dropdown to read a column from a database table. All i want is to get the selected value and use it to create a new query that will be populated in a new dropdown. What i need is: - To come out with the more efficient method and tell me why do you think that's the best way (ajax, or php only

    $33 (Avg Bid)
    $33 Avg Bid
    22 bids

    I need a Cinema 4D plugin programmer to make a plugin for Cinema 4D R13. The plugin should export point level animations to Alembic (.abc) formats out of Cinema 4D R13. Although newer versions of C4D have this exporter, my version (R13) doesn't , because it is a bit old now. Note: The exported alembic file, should be imported well to Unreal Engine

    $30 - $250
    $30 - $250
    0 bids

    Needing to have multiple databases exported into workable Excel Spreadsheets from software named: Misys (aka Misys Tiger), later known as Allscripts. All databses are on a windows server 2003 R2.

    $962 (Avg Bid)
    $962 Avg Bid
    27 bids

    Twixtel data bank export on exel, also the robinson entries with star.

    $408 (Avg Bid)
    $408 Avg Bid
    6 bids