Plot south facing building south facing jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Skills
Languages
    Job State
    9,922 plot south facing building south facing jobs found, pricing in USD

    Need to have javaFX program module in Netbeans to use ChartJS to plot dynamic data from JavaDB. like this but reading from live Reconrds and updating chart. *Must have TEAMVIEWER and know what you are doing. ([url removed, login to view])

    $186 (Avg Bid)
    $186 Avg Bid
    12 bids

    the project is for a resort dedicated for bird hunters during the hunting season and a res...available for rent. the resort also has a swimming pool, multi use sports facility, ATV rental shop, gun shop, shooting club and the remaining plot will be used as a hunting ground for the resort tenants the total plot area will between 60,000 and 100,000 sqm

    $271 (Avg Bid)
    $271 Avg Bid
    23 bids

    I am looking for someone located in Kericho Town, or nearby, to take some pictures of the external areas of the Kericho Town Cathedral. I have provided below some pictures and it would be useful to have pictures that are as similar as possible along with any others. This timeline is that I require pictures by Friday 29 September at the latest. Please let me know whether you have any furt...

    $27 - $337
    Local
    $27 - $337
    0 bids
    Hire an Android Developer 5 days left
    VERIFIED

    1) Interaction between ag-grid and highcharts. I ...I want to create a custom checkbox component in ag-grid and on checkbox selection send the row data to the highcharts to hide and show series lines and points on the scatter plot. 2) I want to develop a side menu which changes according to the routing url. I can share more details regarding this.

    $52 (Avg Bid)
    $52 Avg Bid
    9 bids

    ...analyse the data and WRITE UP the results section. I will also require the raw SPSS Output data as well. Study Design: • Mixed Design analysis of variance (Split Plot ANOVA). • Two independent samples with repeated measures. • Comparing (Pre-Test) vs (Post-Test) on pain score on 3 different days. • Pre vs. Post Test comparison. • Significance

    $214 (Avg Bid)
    $214 Avg Bid
    16 bids

    URGENRT I have a script detecting centroids of objects in a video, I need to plot a circle centered on this centroid, then display the video frame and the circle before recording this frame+circle

    $122 (Avg Bid)
    $122 Avg Bid
    32 bids

    ...a signal vector called “AlasPoorYorick”. The script should plot each signal separately and the title of each plot should be the word in the audio signal. A call to the sound function should be set up for each signal. Also in this script you must set up the chirp sound (play the sound and plot it), except that the chirp should start at the high frequency

    $31 (Avg Bid)
    $31 Avg Bid
    5 bids

    ...Requirements: I need Java code which will take 3 parameters (double latitude, double longitude, String highwayName) to check if the given lat/lng point is East, West, North, or South of the given Highway, and will return one of 5 values: isWest, isEast, isNorth, isSouth, or NULL. Input coordinates will be in standard GPS format, also known as WGS-84 (please

    $130 (Avg Bid)
    $130 Avg Bid
    8 bids

    ...consumption survey in a building of choice. The stochastic behavior of the energy usage should be analyzed on different time frames. A simulation of the building of interest is to be developed as to compare the actual data to that obtained from the simulation. This comparison will then allow comment to be made on how efficient the building is and necessary

    $109 (Avg Bid)
    $109 Avg Bid
    3 bids

    ...consumption survey in a building of choice. The stochastic behavior of the energy usage should be analyzed on different time frames. A simulation of the building of interest is to be developed as to compare the actual data to that obtained from the simulation. This comparison will then allow comment to be made on how efficient the building is and necessary

    $37 (Avg Bid)
    $37 Avg Bid
    2 bids

    Hi Audrey, I contacted you quite some time ago. Do you remember me? I profusely apologise for not staying in contact. I lost the plot, as they say, and almost ended it all. I am still homeless, but doing my best to keep my head up. May I have the pleasure of speaking with you again? Thank you, Justin

    $251 (Avg Bid)
    $251 Avg Bid
    1 bids

    ...second experiment is about( Isolating Bits on a Magnetic Disk Drive). In each experiment, there are 3 plots with total of 6 plots for both and you will have to build codes to plot these graphs using Matlab. After that, I need a lab report for both of the experiments only one report for both. The attachments has both of the experiments and the report guidelines

    $87 (Avg Bid)
    $87 Avg Bid
    7 bids

    Need to have javaFX program module in Netbeans to use ChartJS to plot dynamic data from JavaDB. like this but reading from live Reconrds and updating chart. *Must have TEAMVIEWER and know what you are doing. ([url removed, login to view])

    $28 (Avg Bid)
    $28 Avg Bid
    6 bids

    Its a small project I am stuck with. you will be needing to know R language and working with shiny package. you will be doing code for a small plot drawn from data in csv file.

    $31 (Avg Bid)
    $31 Avg Bid
    5 bids

    Its a small project I am stuck with. you will be needing to know R language and working with shiny package. you will be doing code for a small plot drawn from data in csv file.

    $25 (Avg Bid)
    $25 Avg Bid
    12 bids

    Its a small project I am stuck with. you will be needing to know R language and working with shiny package. you will be doing code for a small plot drawn from data in csv file.

    $118 (Avg Bid)
    $118 Avg Bid
    4 bids

    ...(output 0). You can not use the ‘isprime’ function. 2. Write a script to calculate the value of x in the following nested square root for different numbers of square roots. Plot the value of x versus the number of square roots. Does it converge to a specific number? 3. Confirm Kepler’s 3rd Law (Harmonic Law) and estimate the mass of the Sun If the

    $26 (Avg Bid)
    $26 Avg Bid
    6 bids

    Its a small project I am stuck with. you will be needing to know R language and working with shiny package. you will be doing code for a small plot drawn from data in csv file.

    $28 (Avg Bid)
    $28 Avg Bid
    10 bids
    The involute 1 day left

    I have a small project that asks me to write a computer program that will calculate x and y coordinate of points belonging to an involute and plot the involute section. I also want someone to write a report for me regarding to this project. The format for the report that should be followed will be attached. It is a mechanical engineering problem

    $37 / hr (Avg Bid)
    $37 / hr Avg Bid
    6 bids