Quantity takeoff 2009 software jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Skills
Languages
Job State
2,201 quantity takeoff 2009 software jobs found, pricing in USD
construction estimator 6 days left
VERIFIED

takeoff from plans for insulation waterproofing firestopping

$27 (Avg Bid)
$27 Avg Bid
4 bids

This is about modification on Prestashop platform. Prestashop decreases stock quantity by combinations (id_product_attribute) after every sales order. I need help to decrease stock quantity for all combinations from product (id_product), so that all combinations from the product are equal and thus no matter which combinations customer selected, at the

$41 (Avg Bid)
$41 Avg Bid
7 bids

I have a website in Woocommerce and variable products, each product have 2 attributes. I need to allow visitors to select size and quantity; even if quantity is 0

$25 (Avg Bid)
$25 Avg Bid
24 bids

Build a file download website limit with file quantity based on membership levels.

$120 (Avg Bid)
$120 Avg Bid
47 bids

Process format photos for removing dust, cropping. Dimensions of each JPG more than 800x800 pixels (near to 100-200 KB). Background web white or black!...photos for removing dust, cropping. Dimensions of each JPG more than 800x800 pixels (near to 100-200 KB). Background web white or black! Difficulty of work easy to medium. Quantity about 1000 photos.

$191 (Avg Bid)
$191 Avg Bid
79 bids

Prepare bill of quantities for Industrial building. Must include details Civil works and electromechanical works. Kindly any bidders MUST proof he is Building Surveyors

$178 (Avg Bid)
$178 Avg Bid
21 bids

The lab report topic will be relating sleep quantity to cognitive performance. Instructions, methods and results are attached. 2000 words, ~8-10 references, APA format

$83 (Avg Bid)
$83 Avg Bid
31 bids

I need support to make the carpentry and Joinery part of a Quantity survay will bill of quantities and estimate of materials. I will provide pdf Drawings and model for the excel.

$149 (Avg Bid)
$149 Avg Bid
54 bids

We need take off done for the following attached project. READ ALL specs to find out what gets painted. Then provide us spreadsheet with the take off broken down by sections and paint products called out for all items both interior and exterior that need painted on the project. Please be detailed and complete. I will be checking the project and will not want to pay the full price you quote if ...

$169 (Avg Bid)
$169 Avg Bid
30 bids

I want a cartoon picture, with some people standing around the tombstone. On the tombstone, it reads "RIP Microsoft Dynamics AX 2009 June 2008 - April 2018

$100 (Avg Bid)
$100 Avg Bid
2 entries

Looking for someone to quantity survey construction plans and compile a list of the fasteners required

$306 (Avg Bid)
$306 Avg Bid
31 bids

...options when selecting a product, so the quantity isn't known until exactly until the final dropdown is selected, for e.g if the user selects, 'Blue' then the next dropdown they select 'Width' then the final dropdown they selet the 'Roll Legnth' of the ribbon, it's not until they select that then the stock quantity is know. Also to note ...

$237 (Avg Bid)
$237 Avg Bid
75 bids

Quantity surveying from residential building and construction plan set. I will require a clear break down of the materials and services required. I can give access to software for the right person to use. Thanks

$361 (Avg Bid)
$361 Avg Bid
15 bids

Quantity surveying from residential building and construction plan set. I will require a clear break down of the materials and services required. I can give access to software for the right person to use. Thanks

$387 (Avg Bid)
$387 Avg Bid
26 bids

for a piece of coursework that needs to be done ASAP, including bill of quantities, take off and abstracting all in line with NRM2 UK format

$238 (Avg Bid)
$238 Avg Bid
24 bids

preparing tender documents and quantity surveying

$27 (Avg Bid)
$27 Avg Bid
10 bids

...to the application Plan Viewer Download OnScreen takeoff, I will incorporate it into my own estimating software, so full source code would be required. The Access Database (Which is Fully Developed & Ready), will also be required to be developed to upgrade to SQL as my does my estimating software. This a Windows Forms Application - PDF Reader/Editor

$6 / hr (Avg Bid)
$6 / hr Avg Bid
25 bids

I NEED THE QUANTITY ANALYSIS & ESTIMATION OF ROAD PROJECT....

$150 (Avg Bid)
$150 Avg Bid
4 bids

Hi Freelancers, I am working on a project related to Construction Quantity surveying, and I an looking for a construction specialist who can help me with the report. The ideal candidate should have a civil engineering or construction background. This is an urgent project and requirement high quality of work. More details in conversations.

$68 (Avg Bid)
$68 Avg Bid
11 bids