pTransport - a transport tunnel like module written in C

  • Status Closed
  • Budget $3000 - $5000 USD
  • Total Bids 6

Project Description

Detailed documentation will be sent when the signed NDA is received

Introduction :

The pTransport have the following sub-modules

• Resource Manager, contact all the information of related pAccelerator resources, including location of resources, configuration and validation status.

• Validator, assist the resource manager to validate the pAccelerator resources. If the resource is valid and reachable, report to Location Registrar to update the GeoDNS.

• Traffic director, directing ingress and egress traffic to different source and destination with appropriate header.

• Socks 5 Interface is the network ingress point for application to access PNS network

Get free quotes for a project like this

Looking to make some money?

  • Set your budget and the timeframe
  • Outline your proposal
  • Get paid for your work

Hire Freelancers who also bid on this project

    • Forbes
    • The New York Times
    • Time
    • Wall Street Journal
    • Times Online