In Progress

Develop Cost Performance Index

Basic Assignment Requirementsni) As your site guarantees excellent results, for this assignment I want to achieve a score of at least 90% nnii) Please use Microsoft Project and send me the file together with everyone once donenniii) References and In text citation to be APA referencing stylenniv) Font size 12, Font type Arial and 1.5 Line spacingnnv) No point form or short answers. Please provide proper paragraphs of substantial quality text and reasoning’[url removed, login to view]) Please attach Microsoft Project charts and diagrams into my format provided and label clearlynnvii) Overall minimum amount of words: 3000nnnnnnnnnnnnBELOW INFORMATION IS FROM MY QUESTION PAPER. PLEASE READ CAREFULLY AND ANSWER PROPERLY WITH QUALITY [url removed, login to view] A: ECA REPORT (Total 65 marks) nThe student is required to submit a single MS Word document containing two (2) reports which must address the project issues specified by Q1 and Q2 below. This document must comply with the following guidelines: nn1. There should be no embedded files or documents for Q1 and Q2. nn2. Diagrams, charts, tables, graphs and relevant project outputs may be inserted as images. (Please insert for me) These must be appropriately formatted and presented so that they are legible and can be comfortably viewed. nn3. It is not sufficient to just include diagrams and project outputs. Students must provide comments on these diagrams and provide relevant, non-trivial interpretation and insights. nn4. The mpp file can be inserted as an Appendix as an evidence of the student’s ability to create a project model in MS Project. However, answers in Q1 and Q2 shall not refer the examiner to view the contents of the mpp file in the Appendix. (Please send me the mpp file as mentioned)nnREQUIREMENT 2 (1400 words PLEASE ALLOCATE ACCORDINGLY AND WRITE WELL) nTiming Required Report Content nReview Period 1: From 3rd January 2013 to 10th January 2013 The initial progress report should include the following details, with appropriate comments on each item: nn1. Resource Usage – Evaluate the weekly resource usage and appraise whether if any resource levelling is needed. Merely citing “auto levelling done” is not acceptable. A resource usage report must be attached. nn2. Budgeted Baseline Cost – Estimate the cost of activities and aggregate the total budgeted cost. nn3. Budgeted Cash Flow – Plan a budgeted cash flow by showing the outflow of cash on a weekly basis. nnn4. Network Diagram and Critical Path – Create a Network diagram and show the Critical Path. nn5. Activity Schedule list and determine ES, EF, LS, LF, Free and Total Slacks – Discuss how to eliminate negative slacks, if there are any. nn6. Gantt Chart – Prepare a Gantt chart and comment on it. nn7. One page summary on: nna. Identify the challenges that may be encountered and propose corrective actions that can be taken. nnb. Identify two risks anticipated ahead and propose the appropriate response plans at the time of preparing a report for Review Period 1, you were not supposed to know what happened between Period 1 and Period 2 as stated in the case. Do not state any of those incidents as your anticipated risks and challenges. nnREQUIREMENT 2 (1400 words PLEASE ALLOCATE ACCORDINGLY AND WRITE WELL)nnnTiming Required Report Content nnReview Period 2: 11th January 2013 to Project completion date. The final progress report should include the following project completion details. Appropriate comments on each item are [url removed, login to view] Report Content nn1. Schedule Performance nna. Compare the Actual Gantt Chart vs the Baseline Gantt Chart by Tracking Gantt, and ndiscuss your observations. nn2. Cost Performance nna. Prepare a table for the Actual Cost vs Budgeted Cost with cost variance nnb. Plan a post project evaluation by comparing Cumulative Actual Cost Curve vs nCumulative Budgeted Cost Curve – Both Cumulative Cost Curves are to be shown on the same graph. nn

Skills: Article Rewriting, Article Submission, Article Writing, Copy Typing, Research Writing

See more: write my paper for me free, write my assignment for me, write for examiner, what is use case diagrams, what is use case diagram, what is the use case diagram, what is network flow, what is ms project plan, what is cost flow, what is citation flow, what is a use case diagram, what is an use case diagram, what is a network flow, what are use case diagrams, want to create a chart, use case vs activity diagram, use case diagrams include, use case diagram include, use case diagram guidelines, use case diagram details, the basic cost flow model is, post it graph, path of a graph, path in graph, path graph

About the Employer:
( 110 reviews ) Burdwan, India

Project ID: #4858371

Awarded to:

aadilaman

Hired by the Employer

$2 USD / hour
(0 Reviews)
0.0