Closed

design project2

This project received 6 bids from talented freelancers with an average bid price of £237 GBP.

Get free quotes for a project like this
Employer working
Project Budget
£20 - £50 GBP
Total Bids
6
Project Description

IT'S IMPORTANT THAT EVERY STEP OF THE WORK REQUIRED are sent to me upon completion, and not just the final piece.

Design a low-temperature central heating system that uses an efficient gas-fired boiler

Design hot and cold water services

The building drawings. You should use CAD or sketch drawings to indicate

 the layout of the hot and cold water services

 the layout of central heating system

Drawing of the heating system using AUTOCAD (or sketch), including ground/first

floor plans and space layout, as well as equipment/material specifications.

Layout and sizing of heat emitters in the building;

 Layout and sizing of piping system and calculation of pressure loss;

 Selection of the boiler and circulating pump;

 Drawing of the heating system using AUTOCAD (or sketch),

Estimate storage requirements

 Decide the location for storage vesselsHeating and Water Supply Design Project

 Draw the system layout (could be on the same drawing as for central heating)

2. DESIGN BRIEF

Building Occupancy

- for Marmont Centre

Monday – Friday 8 a.m. – 6 p.m.

Ground Floor

Café 2 people permanent, 24 people transient

Office 1 2 people, 2 computers

Office 2 2 people, 2 computers

First Floor

Lecture room 75 people, maximum

Computer room 6 people, 10 computers + 3 printers

Seminar room 6 people

Weekend

Unoccupied

The attachments require an autocad software to open and you must be able to understand the work.

Looking to make some money?

  • Set your budget and the timeframe
  • Outline your proposal
  • Get paid for your work

Hire Freelancers who also bid on this project

    • Forbes
    • The New York Times
    • Time
    • Wall Street Journal
    • Times Online