Closed

Storm Water Drainage Scheme by civil 3d - repost

The students will be required to submit a design report and drainage drawings for the site. The design report should show

that all pipes are designed to efficiently work at a storm return period of 1 in 10 years. The design report should also

outline any issues with the scheme at a 1 in 50 year return period.

Drawings should show both plan and longsections for the drainage scheme for the entire site. These should be

adequately labelled.

The breakdown of marks is as follows:

Design Report

• Overall presentation of network,

• Efficient design for design storm

• Outline of issues for 1 in 50yr RP

Drawings

• Plan

• Longsection

• General Presentation

Skills: Civil Engineering, Engineering

See more: water design, site plan presentation, scheme, drainage, civil engineering design, civil design, plan drawings, storm drainage, presentation drawings, civil water longsections, civil plan, engineering civil, civil drainage, storm water, civil drainage design, water business marketing plan, presentation engineering, storm drainage layout plan, drainage layout plan cad, outline plan work, network design report, civil drawings, civil engineering report, engineering outline 3d, 3d presentation

About the Employer:
( 0 reviews ) India

Project ID: #4236928

3 freelancers are bidding on average $332 for this job

hasance06

Please check your PM

$250 USD in 7 days
(27 Reviews)
4.9
bchandra1955

Professional engineer can take care of your project

$245 USD in 22 days
(20 Reviews)
4.9
Nilupa

Please check your PM Box !!

$500 USD in 7 days
(8 Reviews)
3.7