Mechanical & Civil Design Projects

This project received 22 bids from talented freelancers with an average bid price of ₹1228 INR / hour.

Get free quotes for a project like this
Employer working
Project Budget
₹750 - ₹1250 INR / hour
Total Bids
Project Description

MEP Projects:
• Quantity Surveying for Pre-Tender,
• MEP Designing- HVAC, Firefighting & PHE
• Clients: Sheikh Khalifa Medical City (SKMC)-Abu Dhabi and United Arab Emirates (49,00000 [url removed, login to view]), Indian Railways-Dedicated Freight Corridor Corporation(DFCC),11Stations in Gujarat, L&T and L&T- Ford India Pvt Ltd, (Whole Plant in Gujarat).

Solar Junction Box Projects:
Software Used : Solid works 2011 & Pro- E.
Project Description :
• Handling the New Product Development
• Develop the Junction Box and MC4 Connectors for Solar Industries.
• Meeting IP 65 & 67, TUV & UL solar Industries.
• Product Sizing, Material selection and troubleshooting customer complaints.
• Understanding the Design records, Engineering drawings / specifications from Customer.
• Conduct Engg specification and feasibility reviews.
• Involving in Reverse Engineering Process and Preparing prototype products.
• Responsible for Legacy Data Conversion 2D to 3D.
• Taking part in Finite Element Analysis.
• Major clients Moserbaer, Lanco and Tata BP.
Solar Junction Box Projects:

Software Used : AutoCAD2007, Solidworks2010, Tekla & Pro-e wildfire.
Responsibilities :
• Understanding the requirement.
• Preparation of Concept & machine layout.
• Designing a Suitable Main Frame as per the Machine Requirement.
• Designing the AUTOMATION Module As Per the Customer Requirement
• Creating the Part, Assembly drawings and Detailing.
• BOM generation and Drawing.
• Drawing standardization.
• Operation & maintenance documentation.
• To ensure timeliness of project deliverables within the allocated man-hours.

Project Title: Tube Loading & Unloading Machine.
Customer : TI-Tube Products, Chennai.
Project Description:
The tube from the furnace conveyor moves to the lifter machine and then moved to the mainline with the help of crane powered by motor.
Project Title: Automatic Fuse Assembly in Ultrasonic welding machine.
Customer : Cooper Bussmann India, Pondicherry.
Project Description:
This Project aimed to develop a material handling equipment for fuse assembly passing through ultrasonic welding, leakage inspection and finally to the bin. This setup was operated through pneumatic cylinders.
Other Projects handled.
M/[url removed, login to view] Metal form, Patabiram-Induction Table for Grinding and Buffing station.
M/[url removed, login to view] Metal form, Patabiram-Rafter Cutting machine to Pallet using Conveyor.
M/[url removed, login to view] Tube Products, Avadi-Bend Removing Machine in Tubes.
M/[url removed, login to view] Tube Products, Avadi-Dend Removing Machine in Tubes.
M/[url removed, login to view] Tractors and Farms- Carrier Assembly in assembly line.
M/[url removed, login to view] Access Hydraulic – Oil pump assembly line fixture lifter unit.
M/[url removed, login to view] Engineering Pvt Ltd –Rough Boring Machine.
M/[url removed, login to view] India-Fuse Cap assembly machine.
Project Title: 10000MW Phase I & II, Valves Expansion.
Customer : Bharat Heavy Electricals Limited., Trichy.
Project Description :
• Gathering the requirement and inputs.
• Analysing the Layout drawings.
• Preparing General Assembly drawings of Top Guard (Sun roof).
• Preparing detail drawings of Column, beam, bracing, support and purlin.
• BOM generation using the in-house designed tools.
• Preparing weight calculation.

Looking to make some money?

  • Set your budget and the timeframe
  • Outline your proposal
  • Get paid for your work

Hire Freelancers who also bid on this project

    • Forbes
    • The New York Times
    • Time
    • Wall Street Journal
    • Times Online