Cancelled

Task in \"Design for Manufacture and materials Optimisation \" - repost

Only 2000 words Assignment

Outcomes:

you have to satisfy for this assignment:

1. Evaluate design in relation to appropriate manufacturing processes, relative to quality and quantities and materials(DFM)

2. To analyze design assemblies to suit and take advantage of the methodology and apply cost reduction methods to design activities on particular components/products(DFMA).

Brief:

You have to develop an assembly line for the alternator shown on the attached sheet. All the parts listed on the sheet will be purchased and shipped to the factory using a JIT supply method, which aims to provide 5 days of inventory at all times. The demand for these alternators is within the region of 50,000 to 85,0000 per year and your assembly line must be able to cope with this variation. You can employ a maximum of 100 people plus a management staff of 10 to do the work and an unlimited amount of automation, but your solution should represent value for money

Your report will have to contain the following elements:

• A diagram of the assembly line in simple block format. (10% )

• An explanation of the methodology used. (30% )

• An explanation of the controls used. (20% )

• Suggestions on how the Alternator design could be changed to make it easier to assemble. (40%)

- We have the lectures for this task and We have also sample solution (to make idea how you can solve it - don't copy anything from the solution)

- No Plagiarism

- The Writer must be Good English Commend with experience in Harvard referencing system

Deadline three days maximum

Price 100$ Maximum

Note: any bidders exceed the time or the price will omit

Message me to send you more data

Skills: Manufacturing, Materials Engineering, Mechanical Engineering, Product Design, Research Writing

See more: writer for money, work in design, three line diagram, system design advantage, supply and demand data, products to manufacture, products manufacturing, method design, mechanical engineering cost, mechanical design 1, manufacturing products in demand, manufacturing money, in demand, how to manufacture, how to design products, harvard solution, harvard data, engineering on demand, engineering mechanical design, elements of design line, design methodology, design for money, design controls, demand and supply data, block design

About the Employer:
( 253 reviews ) Sydney, Jordan

Project ID: #4442632

3 freelancers are bidding on average $187 for this job

imranhossain

Thanks for the project. Regards

$147 USD in 4 days
(72 Reviews)
5.9
udayd75

i will do this

$315 USD in 7 days
(1 Review)
2.8
TharinduHTP

I would like to undertake this project. Please check PMB

$100 USD in 3 days
(0 Reviews)
0.0