control performance for a Process plant - repost 2

Closed

The MVC-benchmark has been used to obtain an optimal benchmark and this can be use to assess process plant. The objective is not just minimizing process output variance but also keeping the input variability within some specified range to reduce upset to other processes, conserve energy and lessen the equipment wear.

Skills: Matlab and Mathematica

See more: variance, variability, process plant, plant, plant plant, within matlab, optimal control matlab, keeping repost, optimal control, control process, control range, range control, energy control, input control objective, objective control, matlab control, process webbrowser control 2005, power plant master control, process logic control software training experience chennai, daily performance measuring excel sheet bpo office process, process control projectsoutsource, process reduce cpu, scope drawings process control project, matlab process, reduce number mysql process php

Project ID: #4330084

3 freelancers are bidding on average $652 for this job

bchandra1955

Professional controls engineer can take care of your project

$555 USD in 35 days
(22 Reviews)
4.7
melsayedhasan

hello i'm ready to start from tomorrow

$650 USD in 20 days
(1 Review)
4.4
hsndehghan

Hi, please see the PM.

$750 USD in 20 days
(5 Reviews)
4.4