control performance for a Process plant-repost

Closed

Description

The MVC-benchmark has been used to obtain an optimal benchmark and this can be use to assess process plant. The objective is not just minimizing process output variance but also keeping the input variability within some specified range to reduce upset to other processes, conserve energy and lessen the equipment wear.

Skills: Matlab and Mathematica

See more: variance, variability, process plant, plant, plant plant, within matlab, optimal control matlab, keeping repost, optimal control, control process, control range, range control, energy control, input control objective, objective control, matlab control, budgetary control system management performance pakistan, process webbrowser control 2005, power plant master control, process logic control software training experience chennai, daily performance measuring excel sheet bpo office process, process control projectsoutsource, process reduce cpu, scope drawings process control project, matlab process

Project ID: #4343753

3 freelancers are bidding on average $433 for this job

bchandra1955

Professional engineer from controls domain here

$550 USD in 18 days
(22 Reviews)
4.7
alncr

I'm at your service. Let's discuss and get it done quickly.

$250 USD in 4 days
(1 Review)
2.0
kannad

Hi. I have extensive experience (not to mention, a PhD) in optimal control system design and Matlab/Simulink.

$500 USD in 6 days
(0 Reviews)
0.0
betaenergy

Dear Sir, We are Reserach and Development company whose working area are : -Digital Motor Control -Analog Design -Electronic Design -Power Electronics -PCB design -Embedded system -Matlab -Simulation of ha More

$600 USD in 14 days
(3 Reviews)
0.0