Closed

Microsoft Project Scheduling

This project was awarded to RFadera for $245 AUD.

Get free quotes for a project like this
Project Budget
$30 - $250 AUD
Total Bids
11
Project Description

Ongoing requirement to support my business in various design and project management functions including:

- Microsoft Project Scheduling

- Estimating & quantity surveying

- Project reporting

- Architectural design, interior design and construction drawings

- Tendering / request for quotation

This request specifically relates to a residential extension to an existing dwelling. I initially require:

1) A microsoft project plan developed for the 2 storey extension off the rear of the existing dwelling

As part of your response, I will require:

1) A fixed price to develop MS project plan including task breakdown and durations (predecessors linkages and dates not critical at this stage)

2) A fixed response time for completion of work that can provided for this project and also assumed for future works.

It is expected that the the project schedule will include (but not be limited to):

Trades Suppliers

? Demolition ? Structural Steel

? Excavation ? Timber

? Structural steel install

? Concreting & Steel Fixing

? Carpentry

Brick / blockwork

Landscaping

? Joinery

? Aluminium windows & doors

? Asbestos Removal

? Steel roofing

? Tiled roofing

? Gutters, fascia, downpipes

? Tiling & waterproofing

? Shower screens, mirrors & splashbacks

? Excavation

Awarded to:

Looking to make some money?

  • Set your budget and the timeframe
  • Outline your proposal
  • Get paid for your work

Hire Freelancers who also bid on this project

    • Forbes
    • The New York Times
    • Time
    • Wall Street Journal
    • Times Online