Closed

Insulation Coordination Study

This project was awarded to allwriter4u for £100 GBP.

Get free quotes for a project like this
Project Budget
£20 - £250 GBP
Total Bids
10
Project Description

Carry out a simple insulation coordination study using the EMTP program.

1. Determine the worst-case lightning overvoltage level at the substation following a direct lightning strike to the overhead line at 1500m away from the substation. (use a 1.2/50, 32kA lightning strike.

2. Determine the most vulnerable points at the substation.

3. Using the supplied company specifications and manufacturer data ( buyers’ guide on ABB’s website), select an appropriate surge arrester(s) to ensure protection of all equipment at the substation.

4. Determine the switching overvoltage level for a simultaneous switching at the instant of peak voltage on phase A.

Write a short report summarising your results and showing typical waveforms of the computed voltages for each of the cases above, and give recommendations for overvoltage protection.

Awarded to:

Looking to make some money?

  • Set your budget and the timeframe
  • Outline your proposal
  • Get paid for your work

Hire Freelancers who also bid on this project

    • Forbes
    • The New York Times
    • Time
    • Wall Street Journal
    • Times Online