In Progress

ITN 100 INTRODUCTION TO TELECOM 1

ITN 100 INTRODUCTION TO TELECOM| SP 13 |

THE BEST MEMORIAL HOSPITAL system has 3 hospitals ( H1, H2 and H3) . They are going to need your service to establish IT network in each Hospital and among the all three hospitals.

REQUIREMENTS ( EXPECTATIONS) FROM THE IT SYSTEM

o There hospital must be connected to each other

o The patient files are going to be located in the main hospital and will be shared with all computers within system by using the file transfer applications. H1 is the headquarter

o LAN requirements ( this for all LAN s in the system)

 Anticipated Max Data rate for LANs is 100Mbps

 Maximum Range of Wireless Ethernet is 150 Meters

 Maximum Bandwidth of Wireless Ethernet is 54Mbps

o BACKBONE

 The average distance between clinics to the hospitals is 3 kilometers

 Must use the Best technology available

o WAN Expected data rates between hospitals

 H1-H2 : 20 Gbps

 H1-H3 : 10 Gbps

 H2-H3 : 45 Mbps

H1 HOSPITAL Arlington VA ( Main Hospital)

• Employing 150 people (fulltime personnel).

• 5 story building

• In each floor there are three sections ( wards) .

o Each ward has 10 desktop computers (i.e. 10X 3 PCs on one floor)

o Each ward has 5 portable/laptop computers and need wireless connection

o Only One printer for all employees in each section. All office computers must have access to that printer.

• Hospital has 3 off-site clinics

o There are 20 people (personnel) in each site

o Allocating 10 office computer ( PC) for in each site.

o Proving wireless network for 5 portable Laptops and the patients.

H1 HOSPITAL Arlington VA

5 ward 1 ward 2 ward 3

4 ward 1 ward 2 ward 3

3 ward 1 ward 2 ward 3

2 ward 1 ward 2 ward 3

1 ward 1 ward 2 ward 3

o Only One printer for all employees in the clinic. All office computers must have access to that printer.

H2 HOSPITAL Chicago IL

• Employing 100 people (personnel).

• 3 story building

• In each floor there are four sections ( wards) .

o Each ward has 15 computers (i.e. 15X 4 PCs on one floor)

o Each ward has 5 portable/laptop computers and need wireless connection

o Only One printer for all employees in each wards. All office computers must have access to that printer.

o Proving wireless network for portable Laptops

• Hospital has 2 off-site clinics

o There are 10 people (personnel) in each site

o Allocating 8 office computer ( PC) for in each site.

o Proving wireless network for 5 portable Laptops and the patients.

o Only One printer for all employees in the clinic. All office computers must have access to that printer.

H2 HOSPITAL Chicago IL

Ward 1 Ward 2 Ward 3 Ward 4

Ward 1 Ward 2 Ward 3 Ward 4

Ward 1 Ward 2 Ward 3 Ward 4

H3 HOSPITAL Los Angeles CA

• Employing 175 people (personnel).

• 2 story building

• In each floor there are three sections (wards)

o Each ward has 7 computers (i.e. 7X 4 PCs on one floor)

o Each ward has 2 portable/laptop computers and need wireless connection

o Only One printer for all employees in each ward. All office computers must have access to that printer.

o Proving wireless network for portable Laptops

• Hospital has no off-site clinics

H2 HOSPITAL Chicago IL

ward 1 ward 2 ward 3 Ward 4

ward 1 ward 2 ward 3 Ward 4

FINAL REPORT

Your team will be preparing a report to fulfill the IT project. Prepare your recommendations by covering the following section.

SECTION A: Backbone for hospital and clinic

 Which Dedicated......................

Skills: Computer Security, Web Security

See more: section backbone hospital clinic, itn 100 final project, itn project best memorial hospital system hospitals, section one computers, patient access network, o.n.e. network, office max, e lans, office portable, access los angeles, access chicago, security for computers, ward, transfer data from one site to the other, memorial, max computers, lan wan, building wireless, wireless network report, computer network project, lan access, patient files, project report wireless technology, wireless access system, introduction report

About the Employer:
( 2 reviews ) Fairfax, United States

Project ID: #4492861

Awarded to:

mhamdy1

HI I am a network expert with an experience up to 12 years configuring cisco networking, I have been certified for CCNP since 2008 , CCNA-Voice since 2009. I have passed CCIE written and I am preparing for the lab exam More

$55 USD in 3 days
(0 Reviews)
0.0

2 freelancers are bidding on average $80 for this job

guddu7

Hi , Ready to help you

$105 USD in 10 days
(0 Reviews)
0.0