In Progress

Construction Checklist Creation: Thermal & Moisture

Prepare list of construction inspection checkpoints. Expert level construction field quality experience required. Attached file shows a model for deliverable.

Division 7 Thermal and Moisture Protection - 19 sections:

07 10 00 Dampproofing and Waterproofing

07 21 13 Board Insulation

07 21 16 Blanket Insulation

07 22 00 Roof and Deck Insulation

07 24 00 Exterior Insulation and Finish Systems

07 25 00 Weather Barriers

07 31 00 Shingles and Shakes

07 32 00 Roof Tiles

07 40 00 Roofing and Siding Panels

07 41 00 Roof Panels

07 42 00 Wall Panels

07 46 00 Siding

07 50 00 Membrane Roofing

07 60 00 Flashing and Sheet Metal

07 61 00 Sheet Metal Roofing

07 72 00 Roof Accessories

07 81 00 Applied Fireproofing

07 84 00 Firestopping

07 90 00 Joint Protection

+The should be 8-12 checkpoints per section, with a total of 190 checkpoints.

+Checkpoints should be insightful list of check items for heightend awareness based on the writer's experience of frequency and severity of defects forund during construction.

+Checkpoints are for use by a QC inspector at the completion of the task - items must be verifieable at completion. Do not include preperatory or work in process items.

+Must be original work. I already have all the usual books!

+Document should be on one long Excel spreadsheet. Excel spreadsheet provided as attachment.

+25% progress payment on completion of first section.

Background information: This is one part in a series. The checkpoints will be used to create a series of QC inspection forms for general contractor.

Skills: Building Architecture, Civil Engineering, Construction Monitoring, Structural Engineering

See more: flashing sheet metal checklist, spreadsheet engineering, field engineering, excel model expert, engineering forms, creation architecture, construction work, construction background, be construction, applied systems, qc inspector, protection one payment, protection engineering, payment protection, a+ roofing, writer required for long task, thermal, Thermal engineering, siding, sheet metal, roofing, roof, qc, metal sheet, field inspection

About the Employer:
( 25 reviews ) 21114, United States

Project ID: #1097727

Awarded to:

philolin

See my PM ...

$250 USD in 5 days
(2 Reviews)
0.0

6 freelancers are bidding on average $167 for this job

hasance06

please check your pm for details.

$100 USD in 3 days
(32 Reviews)
4.8
ravi1214

I am working in Project Management [url removed, login to view] it will be easy for me to do the [url removed, login to view] you want any sample documents i can provide the same

$250 USD in 10 days
(0 Reviews)
0.0
schabna

I will provide the checklist within 15 days of your acceptance.

$175 USD in 15 days
(0 Reviews)
0.0
tahirengineer

i am interested in this task

$100 USD in 30 days
(0 Reviews)
0.0
dinkumarp

I waiting for your replay. if u want sample i can provide for at any time.

$125 USD in 7 days
(0 Reviews)
0.0