In Progress

LINOG programing for production plan.

i want some one help me to generate a code by LINOG programing for production plan.

the same details in the paper.

Summry:

●Title : Optimization Model for Multi-period Multi-Product Multi-objective Production planning.

●Requirements:9equations : total cost, total profit and Overall Service Levels quality.

Total cost = fixed costs + material costs + manufacturing costs + non-utilized capacity costs + shortage costs + transportation costs + inventory holding costs.

●The Constraints: Balance constraints,Capacity constraints,Linking (contracts)-Shipping constraints,Shipping-Linking constraints and Maximum number of activated locations constraints

●total it is 26 equation and constraints.

Skills: C Programming, C++ Programming, Database Programming, C# Programming, R Programming Language

See more: help fix code, please help zip code, glade generate code, kml generate code api javascript, upload picture generate code, excel vba production plan, upload image generate code, generate code money phone number, redirect code generate code, script help generate pages keyword, generate code java, upload pic generate code, generate code php, generate code photo, create aouto generate code aspnet, pls help zip code

About the Employer:
( 9 reviews ) Riyadh, Saudi Arabia

Project ID: #31609097

1 freelancer is bidding on average $200 for this job

PershinAlexey

⭐⭐ Senior Expert in C# ⭐⭐ Hi, Thanks for the opportunity to bid on your project. I read your job description carefully. Also, I am an expert in Window desktop app with C# with 5 years of experience. So I will help you More

$200 USD in 2 days
(0 Reviews)
0.0