Refer appendix attached page 97 onward for drawings

To develop a basis for estimate. This assessment task accounts for 10% of total assessment. Assessment task Using the project documentation provided in Appendix 4, provide a list of at least ten key items (trades) that you would include in a take-off for the project. Make sure that you include the preliminary costs with items (i.e. building permit) listed. Before you start this assessment task, read carefully through all other assessment tasks, especially Assessment task 6 to gain better understanding of this task.

2)Assessment for this task will comprise a series of take offs as part of an overall project to produce the material quantities for the following building trades. Use the list of trades developed in Assessment task 1. Create drawings and/or take off sheets to show key measurements and details required for the detailed estimate. Make sure you use the correct symbols.

3)Prepare a list of plant and equipment that needs to be used on-site. Describe how you find out about the costs involved in using these items. Identify at least three materials in each of these categories and describe how you find out the costs for obtaining those materials. Include the stakeholders you would contact.  Standard items  Prime cost items  Provisional sum items

4)Assessment task  List three items on this project that could be subcontracted if you do not have in-house capacity to complete the project.  Develop an invitation to quote for one of the items. Include all necessary information about the project, including take off of quantities.  Describe the advantages of subcontracting the work.

5)Estimate the hours of labour required to supply and install each key item listed in your take offs used in Assessment task 2.

6)Based on the information you have collected for previous activities, create a project cost estimate. Set it out in an Excel table or similar format. The following can be used as the key sections of your overall estimate:  preliminaries  service connections  site works  concrete  carpentry  cabinetry  roof plumbing  sanitary plumbing  electrical  floor, wall and ceiling finishes  painting.

Full details in Zipped folder

Skills: Civil Engineering, Engineering, Building Architecture

See more: use msn list grabber php work, copy cost estimation sap, list name usman work lahore, civil engineering estimation ppt, unrealistic time cost estimation, msn contacts list grabber doesnt work, cost estimation matrimonial website, craigs list free lance work, best pay per cost message boards list, civil engineering estimation sample, cost estimation outbound call centre india, cost estimation hospital website sugar crm, cost estimation joomla site, cost estimation matrimony website, cost estimation php, cost estimation project net banking project, excel sheets cost estimation civil engineering, joomla cost estimation module, list marketing project work topics, civil cost estimation software

About the Employer:
( 547 reviews ) Bangalore, India

Project ID: #21028259

Awarded to:

sijuprakash

Dear sir/Madam, Iam siju [login to view URL] a professional 3d artist,2D&3D Animator and autocad draftsman.I will do 3d modeling,texturing,rendering,Wireframe rendering,autocad drawing,3D animation,2D animation.I More

₹3100 INR in 7 days
(17 Reviews)
4.1

5 freelancers are bidding on average ₹3395 for this job

Refaat90

Dear I'm a Civil Engineer and I work as a quantity surveyor and I can do your work well Please don't hesitate to contact me Regards,,,

₹4000 INR in 20 days
(1 Review)
1.5
vijayjamesmail

Hi, i have requirement. i can do it. 14 yr exp in Civil industry.................................................

₹3100 INR in 7 days
(1 Review)
1.0
udalaimesh

I am a Qualified Quantity Surveyor and I try to do my best Sir

₹3444 INR in 10 days
(0 Reviews)
0.0
Sreddy1964

I have exprince in civiling 27 years. Relevant Skills and Experience I worked in saudia Arabia i have good eprince in industrial projects

₹3333 INR in 10 days
(0 Reviews)
0.0