Completed

Change order of Javascript content loading on my Web page

See my Wordpress blog at histalk2.com. The left column contains only widget-driven ads from my adserver. I would like the information in that column to be loaded only after the main content in the middle column has loaded. My page loads slowly and I would like readers to be able to read the content as soon as possible after hitting the page, with the ads loading afterward.

I've heard of a "defer" option in Javascript that may accomplish this and I'm sure there are other ways as well. I need the solution to work in IE, Firefox, and Chrome.

I'm interested in any other easy speed-up options you can suggest. I've tried Wordpress caching plug-ins an would prefer to not use those again. I'm also not interested in making major design changes or revising how the ads work.

Skills: Javascript, WordPress

See more: wordpress change order, web page making easy, how design web page, hitting the web, design my web page, blog web page design, javascript content loaded, firefox plug in, speed up my, loading, loading speed, chrome javascript, changes on c web, change chrome, javascript speed, content loaded, defer, wordpress page loading, change column, change javascript, wordpress loading, web page speed, may need change, making changes wordpress, loading page

About the Employer:
( 85 reviews ) Las Vegas, United States

Project ID: #1268241

Awarded to:

roonex

Can make it in the way you want.

$40 USD in 0 days
(62 Reviews)
6.2

5 freelancers are bidding on average $91 for this job

DrTech76

Hi! Ready to start whenever you decide to move forward with this. Kind Regards

$30 USD in 0 days
(115 Reviews)
5.8
westcowboy

hi i'm ready

$35 USD in 0 days
(15 Reviews)
4.6
paulrobin

Sir, University Graduate [url removed, login to view] check PM.

$250 USD in 5 days
(8 Reviews)
3.1
metal03326

There is a simple solution to this problem. I'll need access to WordPress files to fix this.

$30 USD in 1 day
(3 Reviews)
1.9
opacksolution

I have good skill contact me

$250 USD in 5 days
(0 Reviews)
0.0
imakethings

I'm sure, I can complete this.

$100 USD in 1 day
(0 Reviews)
0.0