Completed

Engineering Management

Scenario:

You are a project manager for a Parcel Post company (e.g. Courier Post, NZ Courier, Fastway Couriers). You have been given a project aimed at giving more visibility to your customers in terms of where their parcels are. Currently, your barcode scanning system, can track the parcel when

the parcel is picked up by the courier van,

the courier van drops the parcel in a depot

the parcel is picked up at the depot by a courier van

the courier van drops the parcel at the destination

The missing information is tracking of the parcels between the depots (ie when the parcel is on the truck). The proposed solution is as follows:

As per current systems, the PARCELs are automatically sorted at the depot and placed in CONTAINERs, which are then loaded on to TRUCKs.

The CONTAINERS are to be tagged with RFID tags (currently they are just collapsible metal or plastic boxes without any RFID tags).

The TRUCKS currently have GPS tracking devices, but do not have sensors to identify which CONTAINERS are loaded. So they need to be fitted with such a device.

We need a SOFTWARE developed to track which PARCEL is in which CONTAINER, which CONTAINER is in which TRUCK, and the GPS location of the TRUCK.

At the destination depot, we need to make sure the CONTAINER is disassociated with the TRUCK when it is unloaded.

The current online tracking portal, where customers are tracking their parcel is to be modified to read the new tracking information from the new SOFTWARE.

Everybody involved needs to be trained appropriately to maintain the system.

Here are some other facts about the project

We have 100 TRCUKS in operation in the country

40 of the TRUCKS are independently owned and operated by individuals and are contracted out to us. They will be responsible for paying for purchasing and maintenance of the devices installed on their TRUCKS.

60 of the TRUCKS are owned by us.

We have 10,000 CONTAINERS. They are mostly sitting at depots and loaded and unloaded to and from the TRUCKS by forklift.

Forklift drivers treat the containers very poorly, and they are often knocked and need repair due to rusting, ware and tea and collisions.

Maintenance is provided by a third party Nationwide.

We need to engage with an external party for developing the SOFTWARE. We have not worked with such a company before.

We have not been able to find a local supplier of the RFID tags (for CONTAINERS) and sensors within our price range.

We have found a supplier in China, who does not have a local representative and have not sold them to a company in NZ before. We have been communicating via email and have got a quote from them.

The project is not time-critical and the the most important aspect of the project is for the whole system to work reliably and without a glitch.

The budget is limited but we have some freedom to ensure the right technology is purchased and implemented.

An internal team of 2 Business Analysts and 1 Solution Architect have been assigned to you (the Project Manager).

The ultimate responsibility of operating and maintaining the implemented system is on the company's Asset Manager.

Skills: Mechanical Engineering, Management

See more: telecom engineering management case studies, norahan company engineering management services, project management scenario questions, thesis construction engineering management, dissertation engineering management, project management scenario, essay engineering management, thesis topic construction engineering management, simple project management scenario, words engineering management, powerpoint background engineering management, engineering management project management dissertation, construction engineering management essay, engineering management website, engineering management report, engineering management, engineering management jobs, engineering management jobs in australia, outsourced engineering management

About the Employer:
( 1 review ) Auckland, New Zealand

Project ID: #21390023

Awarded to:

prithvi81

Hi, I am a PMP certified professional and can provide you comprehensive engineering management report including creating high level process flow map, integration of RFID technology with central workflow to accurately t More

$70 USD in 2 days
(16 Reviews)
5.3

10 freelancers are bidding on average $161 for this job

liveexperts123

Hi there, I have read your project description and i'm confident i can do this project for you perfectly.I still have a few questions. please leave a message on my chat so we can discuss the budget and deadline of the More

$250 USD in 3 days
(17 Reviews)
5.6
jameskaikai

Im a good designer with a team of experts in IT that can help shape the desired web Design. I would love to work with you so that you can realise your dream web design. I hope that together we can make this a reality. More

$100 USD in 7 days
(68 Reviews)
5.7
umg536

Hi there, please leave a message on my chat so we can discuss the budget and deadline of the project. I have read your project description and i'm confident i can do this project for you perfectly. Thanks . .

$250 USD in 3 days
(4 Reviews)
4.5
umairali8062

I have read your project and I am expert in this field. I can do this for you within due time and honestly kindly contact .Thanks

$100 USD in 7 days
(1 Review)
1.5
iffi37

Hi sir. Hope you are doing well. I have read you project. I would love to do your project . I'll do unlimited revisions till the satisfactorily completion of your project. Waiting for your positive response. Thank you

$222 USD in 3 days
(1 Review)
0.0
JackKarl

Hi,dear. I have just read your project and I felt happy to see it. I have experienced for +7 years in this field. Particularly, I have ever done the job like this as you want. I want to hear your advice and discuss in More

$200 USD in 3 days
(0 Reviews)
0.0
$161 USD in 3 days
(0 Reviews)
0.0
shahzaibahmed168

i have talent this and [login to view URL] ihave new. you believe i complete your task you give me a chance to complete this task.

$31 USD in 2 days
(0 Reviews)
0.0
maheshd25188

Hi i am having 7 + years of experience in project management working in sector such as oil and gas industry and renewable sector. Involved in project co-ordinaton , project execution, project budgeting, resource plann More

$222 USD in 30 days
(0 Reviews)
0.0