Closed

Building Construction Report

In an essay format prepare and explain the following

The building being used has 5 levels a:

• Lower underground car park

• Ground floor which is the entry point also has a café

• Level 1 which is 4 offices

• Level 2 which are 4 apartments

• Level 3 which is the plantroom

The building is in Carlton Melbourne VIC

• Methods used to connect main drains to local authority sewers in accordance with relevant building standards

• Disposal of sewerage within the control of the local authority sewer is assessed in accordance with relevant building regulations and standards.

• Sewer reticulation throughout new building project

• The location of Different stack types with reference to the number of fixtures and the building(s).

• Description of Fixture units and connection

• Requirements to control prohibited substances from entering the sewer system.

I expect 2000-3000 words

Skills: Building, Building Consultants, Civil Engineering, Report Writing, Structural Engineering

Location: Carlton, Australia

See more: training report on building construction pdf, construction report sample, construction project report sample, sample project report on building construction, building construction project report ppt, report on building construction pdf, internship report on building construction company pdf, project report on building construction in civil engineering, civil engineering building construction, estimating building construction, building construction website, compare contrast connect essay, building construction drawing, building construction websites, building construction company

About the Employer:
( 0 reviews ) Australia

Project ID: #14896015

1 freelancer is bidding on average $255 for this job

$255 AUD in 3 days
(0 Reviews)
0.0