Freelancer logo How It Works Browse Jobs Log In Sign Up Post a Project Profile cover photoundefined
You're now following .
Error following user.
This user does not allow users to follow them.
You are already following this user.
Your membership plan only allows 0 follows. Upgrade here.
Successfully unfollowed user.
Error unfollowing user.
You have successfully recommended
Error recommending user.
Email successfully verified.
User Avatar
$20 USD / hour
Flag of MOROCCO
salé, morocco
$20 USD / hour
It's currently 3:28 AM here
Joined November 30, 2020
2 Recommendations

Abdelhadi D.

@Abdelhoo

annual-level-two.svgpreferred-freelancer-v2.svg
5.0 (16 reviews)
4.4
4.4
$20 USD / hour
Flag of MOROCCO
salé, morocco
$20 USD / hour
100%
Jobs Completed
72%
On Budget
87%
On Time
14%
Repeat Hire Rate

Project Manager/PMP®/Civil Engineer

I'm a passionate professional willing to work hard and never stop learning. I'm offering my services in different fields of my expertise : ⭐⭐⭐⭐⭐ PROJECT MANAGEMENT & CIVIL ENGINEERING: ☑️ Project management & scheduling: >> ✨ PRIMAVERA P6 >> ✨ Microsoft Project ☑️ Structural engineering calculations (Autodesk Robot, SAP2000, Etabs) ☑️ BIM and 3d Modeling (Autodesk Revit) ☑️ CAD (Autodesk AutoCAD) ☑️ Soil Mechanics and geotechnical engineering ☑️ Design of roads and highways ☑️ Fluid mechanics ------------------------------------------------------------------------------ ⭐⭐⭐⭐⭐ TECHNICAL WRITING AND WEB CONTENT in FRENCH & ENGLISH: I'm also a passionate about Technical writing & Web Content: ☑️ Audio services and voice over in French and English ☑️ Research, Reports & Technical Writing ☑️ Technical Case Study ☑️ Thesis & Dissertations ☑️ Articles, Blogs & Content Writing ☑️ Content creation in ENGLISH & FRENCH ☑️ Content Management ☑️ Technical Translation ☑️ Transcription & Translation (English, French and Arabic) ☑️ Academic Content Development I will deliver a PLAGIARISM FREE work, Best Quality work, and in very reasonable prices and unlimited revisions until the entire satisfaction of the client.
Freelancer Project Managers Morocco

Contact Abdelhadi D. about your job

Log in to discuss any details over chat.

Portfolio Items

Link for the project:
https://www.freelancer.com/projects/oracle-primavera/Project-Schedule-Primavera-For-Retail/reviews

The project consisted of creating a detailed schedule, using PRIMAVERA P6, for fit out works for a retail shop. It consisted mainly on doing the following tasks:

* Create the WBS
* Define Activities.
* Sequence Activities.
* Estimate Activity Durations.
* Develop Schedule.
* Control Schedule.
* Resources Estimation and allocation
And all related steps to develop a professional and detailed Schedule using PRIMAVERA P6.
Project Schedule on Primavera For Retail Fit out Store
Link for the project:
https://www.freelancer.com/projects/oracle-primavera/Project-Schedule-Primavera-For-Retail/reviews

The project consisted of creating a detailed schedule, using PRIMAVERA P6, for fit out works for a retail shop. It consisted mainly on doing the following tasks:

* Create the WBS
* Define Activities.
* Sequence Activities.
* Estimate Activity Durations.
* Develop Schedule.
* Control Schedule.
* Resources Estimation and allocation
And all related steps to develop a professional and detailed Schedule using PRIMAVERA P6.
Project Schedule on Primavera For Retail Fit out Store
Link for the project:
https://www.freelancer.com/projects/oracle-primavera/Project-Schedule-Primavera-For-Retail/reviews

The project consisted of creating a detailed schedule, using PRIMAVERA P6, for fit out works for a retail shop. It consisted mainly on doing the following tasks:

* Create the WBS
* Define Activities.
* Sequence Activities.
* Estimate Activity Durations.
* Develop Schedule.
* Control Schedule.
* Resources Estimation and allocation
And all related steps to develop a professional and detailed Schedule using PRIMAVERA P6.
Project Schedule on Primavera For Retail Fit out Store
Link for the project:
https://www.freelancer.com/projects/oracle-primavera/Project-Schedule-Primavera-For-Retail/reviews

The project consisted of creating a detailed schedule, using PRIMAVERA P6, for fit out works for a retail shop. It consisted mainly on doing the following tasks:

* Create the WBS
* Define Activities.
* Sequence Activities.
* Estimate Activity Durations.
* Develop Schedule.
* Control Schedule.
* Resources Estimation and allocation
And all related steps to develop a professional and detailed Schedule using PRIMAVERA P6.
Project Schedule on Primavera For Retail Fit out Store
Link for the project :
https://www.freelancer.com/projects/microsoft-project/microsoft-project-building-programmer/reviews

The project consisted of creating a detailed construction schedule, interlinked with milestones and activities sequencing.
The inputs were architectural drawings and some information about the construction materials that were going to be used.
The challenge of the project was to translate these few information into a detailed schedule.
The challenge was met successfully to entire satisfaction of the client.
Microsoft Project - Building programmer
Link for the project :
https://www.freelancer.com/projects/microsoft-project/microsoft-project-building-programmer/reviews

The project consisted of creating a detailed construction schedule, interlinked with milestones and activities sequencing.
The inputs were architectural drawings and some information about the construction materials that were going to be used.
The challenge of the project was to translate these few information into a detailed schedule.
The challenge was met successfully to entire satisfaction of the client.
Microsoft Project - Building programmer
Link for the project :
https://www.freelancer.com/projects/microsoft-project/microsoft-project-building-programmer/reviews

The project consisted of creating a detailed construction schedule, interlinked with milestones and activities sequencing.
The inputs were architectural drawings and some information about the construction materials that were going to be used.
The challenge of the project was to translate these few information into a detailed schedule.
The challenge was met successfully to entire satisfaction of the client.
Microsoft Project - Building programmer
Link for the project :
https://www.freelancer.com/projects/microsoft-project/microsoft-project-building-programmer/reviews

The project consisted of creating a detailed construction schedule, interlinked with milestones and activities sequencing.
The inputs were architectural drawings and some information about the construction materials that were going to be used.
The challenge of the project was to translate these few information into a detailed schedule.
The challenge was met successfully to entire satisfaction of the client.
Microsoft Project - Building programmer
Challenge :

The project consisted in building a rail way of 22 km. The main challenge of my work was to translate the project technicalities into one resourced schedule that would allow to manage delays, different resources and costs of the whole project.
The planning was meant to be a dashboard for the whole project.

Solution :

• Elaborate the general schedule of construction work: calculation and affectation of work crews, calculation of task durations and planification of different activities referring to retained construction dispositions and delays;
• Elaboration of the Work Breakdown Structure (WBS) with the specific planification tool PRIMAVERA P6;
• Scheduling material and equipment and estimating quantities;
• Regular updates of the overall Planning;
• Reporting of work progress;
• Elaboration of detailed schedules for critical zones;
• Monitoring of material needs following the general schedule.
Project Management: Railway Construction Schedule
Challenge :

The project consisted in building a rail way of 22 km. The main challenge of my work was to translate the project technicalities into one resourced schedule that would allow to manage delays, different resources and costs of the whole project.
The planning was meant to be a dashboard for the whole project.

Solution :

• Elaborate the general schedule of construction work: calculation and affectation of work crews, calculation of task durations and planification of different activities referring to retained construction dispositions and delays;
• Elaboration of the Work Breakdown Structure (WBS) with the specific planification tool PRIMAVERA P6;
• Scheduling material and equipment and estimating quantities;
• Regular updates of the overall Planning;
• Reporting of work progress;
• Elaboration of detailed schedules for critical zones;
• Monitoring of material needs following the general schedule.
Project Management: Railway Construction Schedule
Challenge :

The project consisted in building a rail way of 22 km. The main challenge of my work was to translate the project technicalities into one resourced schedule that would allow to manage delays, different resources and costs of the whole project.
The planning was meant to be a dashboard for the whole project.

Solution :

• Elaborate the general schedule of construction work: calculation and affectation of work crews, calculation of task durations and planification of different activities referring to retained construction dispositions and delays;
• Elaboration of the Work Breakdown Structure (WBS) with the specific planification tool PRIMAVERA P6;
• Scheduling material and equipment and estimating quantities;
• Regular updates of the overall Planning;
• Reporting of work progress;
• Elaboration of detailed schedules for critical zones;
• Monitoring of material needs following the general schedule.
Project Management: Railway Construction Schedule
Challenge :

The project consisted in building a rail way of 22 km. The main challenge of my work was to translate the project technicalities into one resourced schedule that would allow to manage delays, different resources and costs of the whole project.
The planning was meant to be a dashboard for the whole project.

Solution :

• Elaborate the general schedule of construction work: calculation and affectation of work crews, calculation of task durations and planification of different activities referring to retained construction dispositions and delays;
• Elaboration of the Work Breakdown Structure (WBS) with the specific planification tool PRIMAVERA P6;
• Scheduling material and equipment and estimating quantities;
• Regular updates of the overall Planning;
• Reporting of work progress;
• Elaboration of detailed schedules for critical zones;
• Monitoring of material needs following the general schedule.
Project Management: Railway Construction Schedule
Challenge :

The project consisted in building a rail way of 22 km. The main challenge of my work was to translate the project technicalities into one resourced schedule that would allow to manage delays, different resources and costs of the whole project.
The planning was meant to be a dashboard for the whole project.

Solution :

• Elaborate the general schedule of construction work: calculation and affectation of work crews, calculation of task durations and planification of different activities referring to retained construction dispositions and delays;
• Elaboration of the Work Breakdown Structure (WBS) with the specific planification tool PRIMAVERA P6;
• Scheduling material and equipment and estimating quantities;
• Regular updates of the overall Planning;
• Reporting of work progress;
• Elaboration of detailed schedules for critical zones;
• Monitoring of material needs following the general schedule.
Project Management: Railway Construction Schedule
Link for the project :
https://www.freelancer.com/projects/mathematics/Building-Strength-Stability/reviews

The project consisted of designing a concrete retaining wall and checking the proposed design of the mass concrete retaining wall for the overturning and sliding limit states according to Eurocode 7.
Civil Engineering: Retaining Wall design
Link to the finished project reviews:
https://www.freelancer.com/projects/french/need-get-audio-translations-with/reviews

The project consisted of doing a voice-over in English for an audio recorded in French.
The work consisted of transcribing the French audio then translate it to English while keeping a background adapted for the original audio and then finally recording the voice-over in English.
The voice over had to be synchronized with the original audio.
Web Content: Voice over in English for an audio in French

Reviews

Changes saved
Showing 1 - 5 out of 16 reviews
Filter reviews by:
5.0
$60.00 CAD
Precise and within timeframes agreed on.
Project Management Technical Writing Project Scheduling Construction Monitoring
+1 more
User Avatar
Flag of Ray B. @Geeray
9 months ago
5.0
$80.00 USD
Many Thax for excelent wotrk. all the best
Project Management Project Scheduling
T
Flag of Abdullah A. @the3di
10 months ago
5.0
$95.00 CAD
great job creating the beginning of our work planning
Project Management Engineering Building Architecture Structural Engineering Construction Monitoring
User Avatar
Flag of Ray B. @Geeray
1 year ago
5.0
$100.00 USD
He did a great job delivering what I requested. communication was fast and The Deliverables were on point.
Project Management Project Scheduling Construction Monitoring Oracle Primavera Agile Project Management
User Avatar
Flag of Saud A. @SaudHE
1 year ago
5.0
$50.00 USD
Tres bonne communication. Travail bien fait et livraison on time
Project Management Technical Writing French Translator English (US) Translator
+1 more
User Avatar
Flag of Youness E. @ezzineyouness
1 year ago

Experience

Project Manager

Construction Company
Feb 2016 - Present
Management of construction projects.

Planning Engineer

Construction Company
Oct 2013 - Jan 2016 (2 years, 3 months)
• Collect requirements and create the WBS; • Define activities and sequence them; • Estimate activity resources and activity durations accordingly; • Develop the schedule using PRIMAVERA P6; • Control schedule throughout the lifetime of the project and perform updates when needed; • Elaborate all the needed work performance information and reports

Education

Master's degree in Civil Engineering

École Hassania des Travaux Publics, Morocco 2010 - 2013
(3 years)

Qualifications

Project Management Professional (PMP)®

Project Management Institute
2021
Project Management Professional (PMP)® Certification.

TEF : Test d'Evaluation de Français (French Assessment Test)

Centre de langue française de la CCI Paris Île-de-France
2020
Niveau : C2

IELTS - English Proficiency Exam

Cambridge Assessment English
2019
Overall Band Score : 7 CEFR Level : C1

Contact Abdelhadi D. about your job

Log in to discuss any details over chat.

Verifications

Preferred Freelancer
Identity Verified
Payment Verified
Phone Verified
Email Verified
Facebook Connected

Certifications

preferredfreelancer-1.png Preferred Freelancer Program SLA 1 100%

Top Skills

Project Management 10 Project Scheduling 8 Microsoft Project 5 Technical Writing 4 Construction Monitoring 4

Browse Similar Freelancers

Project Managers in Morocco
Project Managers
Project Scheduling Managers
Microsoft Project Experts

Browse Similar Showcases

Project Management
Project Scheduling
Microsoft Project
Technical Writing
Previous User
Next User
Invite sent successfully!
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2022 Freelancer Technology Pty Limited (ACN 142 189 759)
There is no internet connection
Loading preview