Freelancer logo How It Works Browse Jobs Log In Sign Up Post a Project Profile cover photo
You're now following .
Error following user.
This user does not allow users to follow them.
You are already following this user.
Your membership plan only allows 0 follows. Upgrade here.
Successfully unfollowed user.
Error unfollowing user.
You have successfully recommended
Error recommending user.
Something went wrong. Please refresh the page and try again.
Email successfully verified.
User Avatar
$20 USD / hour
Flag of EGYPT
al gomhoriyah (2), egypt
$20 USD / hour
It's currently 11:01 PM here
Joined June 23, 2019
1 Recommendation

Elsayed E.

@engselgendy

monthly-level-two.svg
4.9 (30 reviews)
4.9
4.9
$20 USD / hour
Flag of EGYPT
al gomhoriyah (2), egypt
$20 USD / hour
100%
Jobs Completed
79%
On Budget
81%
On Time
6%
Repeat Hire Rate

PMO Director, Civil Engineer, PMP®

I am civil engineer, construction, class 2004, Egyptian. PMO Director I have experience in Egypt, Emirates, and Saudi Arabia. I am Project Management Professional (PMP) certified since May 2013. Risk Management Professional (RMP). Primavera Software. Microsoft project software. Power BI, Dashboards. Primavera Risk Analysis Software. FIDIC Contract. Claims and delay analysis. Scheduling Professional (SP). Earned Value Management (EVM). Quality Management, planning, assurance, and controlling. submission of construction material and equipment lists Prepare technical offers for construction engineering projects for bids(tenders) Excel/Word programs. English level is Fluent. I am always keen to provide professional work, both academically and practically.
Freelancer Project Managers Egypt

Contact Elsayed E. about your job

Log in to discuss any details over chat.

Portfolio Items

Provide files of materials and equipment used in the construction industry. The files include the name of the material, equipment, function, and illustrative images.
The files are in excel format.
Submission of construction material and equipment lists
Provide files of materials and equipment used in the construction industry. The files include the name of the material, equipment, function, and illustrative images.
The files are in excel format.
Submission of construction material and equipment lists
Provide files of materials and equipment used in the construction industry. The files include the name of the material, equipment, function, and illustrative images.
The files are in excel format.
Submission of construction material and equipment lists
Provide files of materials and equipment used in the construction industry. The files include the name of the material, equipment, function, and illustrative images.
The files are in excel format.
Submission of construction material and equipment lists
This was Heaven Hills Resort to build villas on the Red sea beach, I prepare the project quality plan that includes all procedures to insure achieving the quality in the project, included Quality assurance and Quality control procedures. In addition prepare ITP ( Inspection and Test Plan) that includes the tests required for all works on the project.
Heaven Hills Resort
This was Heaven Hills Resort to build villas on the Red sea beach, I prepare the project quality plan that includes all procedures to insure achieving the quality in the project, included Quality assurance and Quality control procedures. In addition prepare ITP ( Inspection and Test Plan) that includes the tests required for all works on the project.
Heaven Hills Resort
RAS SHOKIER AIRPORT is an airport for helicopters, I prepare the risk plan and risk register with the quantitively and qualitative analysis for the project
RAS SHOKIER AIRPORT
RAS SHOKIER AIRPORT is an airport for helicopters, I prepare the risk plan and risk register with the quantitively and qualitative analysis for the project
RAS SHOKIER AIRPORT
This project consist of 16 BOQ(Bill of Quantities), 12 buildings, concrete water tank, pump rooms, infrastructure works.

the budget 120 millions/ SR(Saudi Riyal)

Project Duration 24 months

I achieve the project schedule, with all activities in the BOQ and allocating the resources to produce S-curve and cash flow (spreadsheet)
ElNamas Technical College Project
This project consist of 16 BOQ(Bill of Quantities), 12 buildings, concrete water tank, pump rooms, infrastructure works.

the budget 120 millions/ SR(Saudi Riyal)

Project Duration 24 months

I achieve the project schedule, with all activities in the BOQ and allocating the resources to produce S-curve and cash flow (spreadsheet)
ElNamas Technical College Project

Reviews

Changes saved
Showing 1 - 5 out of 30 reviews
Filter reviews by: 5.0
$30.00 USD
Excellent freelancer!! Very skilled and efficient in delivery. Highly recommended
Excel Research Writing Project Scheduling Business Analysis Microsoft Project
User Avatar
Flag of Fredrick I. @nickrushdon
•
29 days ago
5.0
$30.00 USD
Very helpful and quick to respond
Project Management Construction Management
A
Flag of Andrew C. @andrew358
•
3 months ago
5.0
$250.00 USD
professional and deliver the work on time
Project Management Construction Management
User Avatar
Flag of Mohamed I. @mohomarissa
•
4 months ago
5.0
$300.00 USD
Greal work deliverables from Elsayed and on time Definitely will hire him again
Legal Building Architecture Contracts Patents AutoCAD
User Avatar
Flag of Mishal A. @mishal585
•
5 months ago
4.0
$20.00 USD
Good work Elsayed. Thanks.
Project Management Research Writing Project Scheduling Project Planning
User Avatar
Flag of Sherwin D. @Writeristic
•
8 months ago

Experience

Project manager

Benaa Construction Company
Jun 2017 - Present
In EGYPT, as a Project manager

Quality manager

Al Kifah Contracting
Dec 2014 - Mar 2017 (2 years, 3 months)
Work in Saudi Arabia as a Quality manager

Consultant

Al Yamama Consulting
Jul 2011 - Jul 2014 (3 years)
Work in Saudi Arabia, as a consultant for ministry of Education, schools and administrative buildings.

Education

Good

Tanta University, Egypt 1999 - 2004
(5 years)

Good

Tanta University, Egypt 1999 - 2004
(5 years)

Qualifications

Project Management Professional (PMP)

Project Management Institute ( PMI)
2013
Project Management Professional (PMP) is the highest certificate at Project Management Science, it contain all aspects of the project, Integration, Scope, Time, Cost, Quality, Resources, Risk, procurement, Communication, and Stakeholders. I am certified since May 2013, and renew to May 2022.

Publications

When you are a project manager

Myself on Facebook pages, and my blog
I put in this book the way to be professional project manager, how reach your project goals.

Contact Elsayed E. about your job

Log in to discuss any details over chat.

Verifications

Preferred Freelancer
Identity Verified
Payment Verified
Phone Verified
Email Verified
Facebook Connected

Top Skills

Project Management 27 Project Scheduling 16 Research Writing 15 Civil Engineering 12 Management 7

Browse Similar Freelancers

Project Managers in Egypt
Project Managers
Project Scheduling Managers
Research Writers

Browse Similar Showcases

Project Management
Project Scheduling
Research Writing
Civil Engineering
Previous User
Next User
Invite sent successfully!
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2023 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.