Profile image of goghie

goghie

and invite this freelancer
Flag of Serbia Belgrade, Serbia
It's currently I'm Online! I'm Offline
Member since January, 2012

I'm providing reliable solutions.

0.0 / 5
0.0 / 10

@goghie

  • N/AJobs Completed
  • N/AOn Budget
  • N/AOn Time
  • N/ARepeat Hire Rate

Top Skills

  • Javascript
  • Engineering
  • Electronics
  • Manufacturing
  • Microcontroller
  • Software Architecture
  • PLC & SCADA
  • Software Testing
  • Electrical Engineering
  • Mechatronics
  • Supplier Sourcing
  • Product Design
  • HTML
  • Instrumentation
  • Robotics
  • Energy
  • Engineering Drawing
  • Industrial Engineering
  • Telecommunications Engineering
+ show more

Recent Reviews

Experience

Robot for sponge packaging

Dec 2011 - Jan 2012 (1 month)

Complete project and commission for machine for sponge packaging with: - Mitsubishi RH-12SDH8535 Robot (application and commission) - Mitsubishi PLC FX3G - Mitsubishi Inverter - Weintek operator panel - Nanotec step motors

Coal Mine Pit

Oct 2011 - Feb 2011 (1 month)

Command and control center. Project scope: - SCADA (Citect/MX) with 1500 tags, for controlling 33 water drainage pump station. - Application for 33 PLC (Mitsubishi FX3U) for controlling 33 water drainage pump station. - Commission

Starch Factory Jabuka, Pancevo, Serbia

May 2011 - Aug 2012 (1 year)

- Creating PLC software for all processes (creating glucose and fructose syrup, isomerization, filtration and evaporation). Program is around 120 000 programming lines, including around 100 PID control loops. PLC Mitsubishi Q10. - Programming and adapting old Mitsubishi PLC Q06, and Mitsubishi MAC HMI in old factory to work together with processes in new factory. - Commissioning of whole factory system.

Meat production line

Feb 2011 - Jun 2011 (4 months)

- Complete automation of meat production lines, - LV electrical works, - Assembling and mounting of LV electrical enclosures with Schneider Electric TWIDO and MAGELIS HMI operator panels.

Copper Mines Majdanpek - Flotation

Jan 2011 - May 2011 (4 months)

Automation of electric motor drives star-feeder

Pumping station CS SAVA

Nov 2010 - Oct 2011 (11 months)

Client Schneider Electric, end-user Belgrade Water Treatment Company. Project includes: - Refurbishment of existing pumps (4 x 250kW, 1 x110kW), equipping them with 4 variable speed drives 250kW and 1 Softstarter 132kW, - Integration of two new Schneider Electric/Modicon M340 PLCs with 256 DI/DO and 48 AI/AO, - Expanding existing GE Ifix SCADA to meet new equipment. Communication CANopen, Modbus, Ethernet.

Buster station PINOSAVA

Jun 2008 - Oct 2008 (4 months)

- Complete electrical works, assembling and mounting of LV electrical enclosures, - integration of 75kW variable speed drive - Schneider Electric TWIDO PLC programming, - Schneider Electric Magelis HMI programming.

Termal Power Plant "Gacko"

Mar 2008 - Mar 2008 (1 month)

Electrical enclosures for command voltage.

IQF Freezers for freezing of fruit

Dec 1969 - Dec 1969 (1 month)

Complete lines for processing, freezing, and packing fruits and vegetables, with supervisory software

Education

Electrical technician in Energetic

1992 - 1996 (3 years)

Certifications

UnityPro programmer

Programming of Schneider Electric Modicon PLCs (Unity platform)

Prisma panel builder

Assembling Prisma Type-Tested Assemblies

XLPro3 panel builder

Principals of assembling XLPro3 Type-Tested Assemblies, and use of XLPro3 Design software

Badges

  • The Perfectionist

    Edited a bid.
  • The Perfectionist

    Edited a bid.