EXPLORE


0.0
0.0
0%
$15 USD / Hour
・

India (10:52 PM)
・
Joined on August 29, 2013
$15 USD / Hour
・
I am a Civil-Structural Engineer with 16 years experience. I am working here in Mumbai, India. I want home based engineering assignments & I am confident to timely finish them as per your reasonable expectations. I have extensive experience in Civil Engineering Design using softwares like STAAD, ETABS, SAFE, RCDC, Spreadsheets, Word etc..
Verifications

Design of pile & pile cap as per BS Code.

Sample program to design columns as per IS Code

Spreadsheet for Design of Base Plate for Steel Column

Design of pile & pile cap as per BS Code.

Sample program to design columns as per IS Code

Spreadsheet for Design of Base Plate for Steel Column
No reviews to see here!
Experience
Senior Manager-Structural
Dec, 2011 - Present
•
14 years, 7 months
Shapoorji Pallonji Limited
Dec, 2011 - Present
•
14 years, 7 months
Responsibilities: Design Coordination with Structural Consultant, Architects, MEP & Site. Checking & Value Engineering of projects, Proposals for projects. Key Projects: 1. Apollo Hospital (G+5 RCC Building) at Nasik 2. RBI Projects in Mumbai & Chennai. a. Mumbai projects: G+Podium+18 RCC staff building at Chembur & G+6 RCC Hostel building at Goregaon. b. Chennai projects: G+6 RCC hostel buildings at Annanagar & Annasalai. 3. Amway Project: Coordinated with P.E.B vendors for their warehouse in Madu
Dec, 2011 - Present
•
14 years, 7 months
Senior Associate Consultant-Structural
Sep, 2006 - Sep, 2011
•
5 years
Frischmann Prabhu Private Limited
Sep, 2006 - Sep, 2011
•
5 years
Responsibilities: Design of structures as per I.S & B.S. Key Projects: 1. Godavari Lift Irrigation Scheme Pump House: Designed entire structural steel superstructure of 7 pump houses in Andhra Pradesh for HCC. 3 Pump houses were supporting cranes of 50T over 14.4m span & 4 pump houses were supporting cranes of 100T capacity over 17.6m span. 2. Sports Complex at Balewadi, Pune for Government of Maharashtra: a. Badminton Court: Structural steel roof of 60m/90m clear span supported by RCC Columns & Foot
Sep, 2006 - Sep, 2011
•
5 years
Senior Design Engineer-Structural
Feb, 2005 - Aug, 2006
•
1 year, 6 months
Sterling Engineering Consultancy
Feb, 2005 - Aug, 2006
•
1 year, 6 months
Responsibilities: Design of buildings as per I.S All the analysis & design was done on STAAD & ETABS. Key Projects: 1. Hindoostan Mills at Prabhadevi, Mumbai.: G+18 RCC residential building 2. Dosti Flamingos at china mill compound, Mumbai. : 4 G+25, 1 G+15 & 2 G+9 RCC towers. 3. TCS at Andheri, Mumbai: G+2/3 RCC Buildings.
Feb, 2005 - Aug, 2006
•
1 year, 6 months
Education
College of Engineering Pune
2000 - 2002
•
2 years
M.Tech-Structure

India
2000 - 2002
•
2 years
University of Pune
1993 - 1997
•
4 years
B.E-Civil

India
1993 - 1997
•
4 years
Qualifications
P.G.D in Computer Aided Design of Concrete Structures
2006
Annamalai University
It was a post graduate diploma in computer aided design of concrete structures. It was a somewhat like a refresher course for me.
2006
Publications
Increase in CBR value of soil by using geolon
B.E-Civil project
1. California Bearing Ratios values were worked out for soil types like black cotton soil & murum with & without geolon. 2. The % increase in these values by using geolon was worked out. 3. Advantages of using geolon in embankments, roadways, earthen dams etc. was pointed out. 4. My project guide was Dr.Jain
Analysis of rectangular plate by finite difference energy method.
M.Tech-project
1. A rectangular plate was analysed using finite difference energy method. This plate was analysed for various boundary conditions & various load combinations. 2. Computer Programs were prepared in C++. 3. The Computer results were compared with Timoshinko in his book 'Theory of Plates & Shells'. 4. My project guide was Dr.Siddhaye.