Algorithm critical path methods jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    142 algorithm critical path methods jobs found, pricing in USD

    ... what do you mean by this and that it is not used having the best system in the world if it does not work correctly? So the whatsapp Bulk messages scheme has to have an algorithm clever enough to prevent this block by whatsapp. How to do this? By proxy, changing the network's I'm connected? By placing fake Ips or child shipping rules. example:

    $433 (Avg Bid)
    $433 Avg Bid
    2 bids

    ...logical and should not be very obvious to the student indicating the option is incorrect. There are three levels of thinking required. They are as following 1. Factual 2. Critical Thinking 3. Deep Thinking Please refer the below example to highlight the type of assessment question we require and what we are expecting from yourself. Rule 211 It is

    $82 (Avg Bid)
    $82 Avg Bid
    8 bids

    ...page. These features are: Adding a Profile image Header above an existing member profile image Adding a member photo Gallery Adding business opening hours Adding Payment Methods to display different payment option icons All the above added features development has to be completely step by step Logged for the future reference and updates. Thanks

    $230 (Avg Bid)
    $230 Avg Bid
    52 bids

    ... • Moisture control module: this module will control soil moisture, and give instruction to water pump for on or off. • Temperature control module: this module usage PID algorithm to control the desired temperature, user has to set temperature in degrees using mobile app. • IR module: it is used to control AC, TV and Music player. • Energy monitoring

    $1455 (Avg Bid)
    $1455 Avg Bid
    10 bids

    ... what do you mean by this and that it is not used having the best system in the world if it does not work correctly? So the whatsapp Bulk messages scheme has to have an algorithm clever enough to prevent this block by whatsapp. How to do this? By proxy, changing the network's I'm connected? By placing fake Ips or child shipping rules. example:

    $481 (Avg Bid)
    $481 Avg Bid
    9 bids
    priority queue data structure 6 days left
    VERIFIED

    Write a generic classes: vEBtree<T>, with methods ExtractMax(), Insert(value,priority), DecreaseKey(value,priority), and a constructor to create the data structure and populate it with a parametric collection of n items. • Create an instance of your BinaryHeap class with n entries with diļ¬€erent priorities. Make sure the entries are inserted in random

    $25 (Avg Bid)
    $25 Avg Bid
    6 bids

    Hi, this is fairly quick bug fix magento project. Need to remove this credit card form from Magento 1 one page checkout ...Magento 1 one page checkout by inspecting elements from browser it seems to be "payment_form_authorizenet" although in admin setting authorizenet and other credit card payment methods are turned off, Need to fix this quickly.

    $32 (Avg Bid)
    $32 Avg Bid
    19 bids

    I want to be able to have an edited version of one part of Olivia Newton Johns song 'Lets Get Physical'. I am going to give a short presentation on...a short presentation on 'Criticality' at a conference and so as I came up to talk I thought it would be good to have the chorus part of her son playing, but with the word 'Critical' replacing 'Physical'

    $13 (Avg Bid)
    $13 Avg Bid
    10 bids

    Passionate programmers are most welcome. You must know Python, SQLite, MySQL and must be good with Algorithm.

    $139 (Avg Bid)
    $139 Avg Bid
    15 bids

    Write a GUI with the following functions using Python 2.7.x: 1. Drag and drop icons of Wifi devices to locations in room, and use a formula we provide to calculate path loss between devices, and write the results into an array and save it to a file 2. Provide fields for user to enter wifi device IP addresses, paths of iperf and adb 3. Provide buttons

    $190 (Avg Bid)
    $190 Avg Bid
    3 bids

    Implement a file system in C in a fixed size file .This file system is basically described by its superblock, free blocks list, inodes and its corresponding data block...certain operations on the file system like adding the files , removing the files , listing the files,reading the file contents , print each inode and contents of each file in the path

    $118 (Avg Bid)
    $118 Avg Bid
    10 bids

    There is some issue with angular js So need help with that error is OPTIONS http://r/api?path=content&action=getTemplate net::ERR_NAME_NOT_RESOLVED For expert this is 10 mins job So need fast and best price for this task.

    $26 (Avg Bid)
    $26 Avg Bid
    7 bids

    Work in collaboration with the Business Development Team (sales, marketing, and client services) to coordinate critical touch points during the project selection, review and on-boarding processes Assist with the sourcing and maintenance of FarShore’s sales cycle (researching new client prospects, preparing documentation and presentations that communicate

    $13 / hr (Avg Bid)
    $13 / hr Avg Bid
    11 bids

    ...credit as a widget in anywhere on the site 6- let the users be able to add money to the public credit as they want 7- make all the public credit options be available on payment methods (if a public credit is for the specific group like the Orphans than it will be available only for them but if a public credit is for everyone then everyone including the Orphans

    $509 (Avg Bid)
    $509 Avg Bid
    12 bids
    Vegetarianism and Veganism 6 days left
    VERIFIED

    This project will be an essay based on a literature review on Vegetarianism and Veganism, its history, the differences, its importance, environmental impact and critical comparisons of other food eating groups such as pescatarians and meat eater. (2000 words)

    $60 (Avg Bid)
    $60 Avg Bid
    36 bids
    Landing Page / Online Sales 6 days left
    VERIFIED

    Apply to join our Landing Page / Online Sales Contest and a chance to win a €200 Prize. Prove that your methods and design skills generate money. Create a Landing Page, generate traffic and convert to real sales over an 8 week period. Sales must take place in the EU. We want to identify people who deliver bottom line results to work with on further

    $18 / hr (Avg Bid)
    $18 / hr Avg Bid
    16 bids
    Machine Learning 6 days left

    I need somebody to help me to outperforme ADE and machine learning algorithm for classification porpouse in order to surpass my current AUC 0.9

    $157 (Avg Bid)
    $157 Avg Bid
    16 bids

    - I am looking for an experienced graphic designer or agency who can also do thier own illustrations. - The logo is for a new business in the garden and plant sector. -...in the garden and plant sector. - The key themes for this logo are contemporary, luxury and simplicity. - The logo will be seen on giant signage to clothing So scale is critical

    $406 (Avg Bid)
    $406 Avg Bid
    93 bids

    ...generating revenue. We are constantly testing different layouts and optimizations to see what brings better return-on-investment. We are expecting: - Important: Availablity is critical, has to be available throughout the week (except on weekends unless there's an emergency) - Someone who knows all the workarounds of Shopify - Can fully modify our theme and

    $32 / hr (Avg Bid)
    $32 / hr Avg Bid
    45 bids

    I am looking for an algorithm expert who knows Floyd-Warshall algorithm well Here is the path of the problem you have to solve. [login to view URL] You don’t have to write the completed code, but

    $154 (Avg Bid)
    $154 Avg Bid
    9 bids

    ...the highest growing markets for 2019. We are currently looking for a social media Expert / Guru to bring to our team at [login to view URL] We wish to explore alternative payment methods vs the usual flat rate or hourly rate. We want to build a permanent team to our business. We would look at offering you a slice of the business and a commission in return

    $1144 (Avg Bid)
    $1144 Avg Bid
    9 bids

    ...interested of more likes to my page, I want organic people.. If you think you can analyze my competitors, work on my website to boost it in my area, run heavily facebook Algorithm to target specific people! Being able to demographically target these specific people that have visited certain sites or have displayed specific behavior is what I'm interested

    $98 (Avg Bid)
    $98 Avg Bid
    29 bids

    OUR FUTURE CTO if you...will bring you on board as our CTO/if you are open to that Building a platform to outsource full SKILLED TEAMS instead of individual freelancers Looking to develop an AI algorithm to vet the skills, and CV's and match the this candidates with the requests set by a "Leader" (project manager), in order to build a 1st class team.

    $563 (Avg Bid)
    $563 Avg Bid
    10 bids
    Simple C# API Program 5 days left
    VERIFIED

    ...published to the internet. Here is how the authentication works. I will provide you with the encryption key and endpoint URL. · Authentication request made against the path /User/AccessCheck/Authenticate · HTTP Method – POST · Data (example) - iv=123456789&token=TWFuIGlzIGRpc3Rpbmd1aXNoZWQsIG5vdCBvbmx5IGJ5IGhpcyByZWFzb24sIGJ1dCBi...

    $501 (Avg Bid)
    $501 Avg Bid
    29 bids

    I need Optical Mark Reader, algorithm with high accuracy (OMR Engine Required) Must be your own creation. not open source i am looking for experienced individual, has done this tasks already. if you have demo video you can send me for demonstration.

    $171 (Avg Bid)
    $171 Avg Bid
    5 bids

    ...(CS5) • excellent grammar and writing skills • min 2+ years experience of working in digital and/or advertising agency • BA in Journalism, English or Communications • critical thinking. The test task for this position : Check texts of the main (top) sections on [login to view URL] website, and describe why they should be changed. Include this description

    $20 / hr (Avg Bid)
    $20 / hr Avg Bid
    11 bids

    I have a micromouse project and I need help with MAZE SOLVING coding (I chose TREMAUX'S ALGORITHM) and MOTOR coding to make the mouse move seamlessly within the maze, experience in using MPLab X and C language is required. All files regarding components( DSPIC30F4011, L298 H Bridge and FAULHAGER), design notes and schematic for the mouse are attached

    $42 (Avg Bid)
    $42 Avg Bid
    2 bids

    ...scenarios, uploading test reports (logs and screencasts) Any bugs found will be paid extra in addition to this amount (from 1 EUR per bug of low priority up to 5 EUR per bug for critical issues such as app crash for example)...

    $31 (Avg Bid)
    $31 Avg Bid
    15 bids

    Path finding in a terrain having obstacles in artificial intelligence in javascript using A* algorithm

    $95 (Avg Bid)
    $95 Avg Bid
    9 bids

    ...of this year. I'm slated to speak at Data Connectors and Data Securers in New York City in on August 1. it would be phenomenal if we actually introduced some new or novel methods of penetration contests that we could present at thesell events and conferences that are listed on this page are in descending order (so the most recent) at the top. If you

    $34 / hr (Avg Bid)
    $34 / hr Avg Bid
    2 bids

    I need a critical thinker and a professional writer with a great background in Information Technology/Information Science/systems.

    $92 (Avg Bid)
    $92 Avg Bid
    24 bids
    Mom Blogger 5 days left
    VERIFIED

    ...researching, and pitching ideas for posts. 4. Writing, editing, publishing, and promoting content. 5. Promoting new posts using advertisements, emails, social media, and other methods to alert and attract new readers. 6. Advocating and educating others about interests, products, or services. 7. Inviting other bloggers, experts, or other notable guests to

    $16 (Avg Bid)
    $16 Avg Bid
    4 bids

    I have a micromouse project and I need help with MAZE SOLVING coding (I chose TREMAUX'S ALGORITHM) and MOTOR coding to make the mouse move seamlessly within the maze, experience in using MPLab X and C language is required. All files regarding components( DSPIC30F4011, L298 H Bridge and FAULHAGER), design notes and schematic for the mouse are attached

    $61 (Avg Bid)
    $61 Avg Bid
    2 bids
    java data structure 5 days left
    VERIFIED

    ...data structure class named BookShelf which has an array to store books and the size data member. The class should have suitable constructors, get/set methods, and the toString method, as well as methods for people to add a book, remove a book, and search for a book. Design and implement a Java class named Book with two data members: title and price

    $19 (Avg Bid)
    $19 Avg Bid
    34 bids
    Micromouse for C program code 5 days left
    VERIFIED

    I have a micromouse project and I need help with MAZE SOLVING coding (I chose TREMAUX'S ALGORITHM) and MOTOR coding to make the mouse move seamlessly within the maze, experience in using MPLab X and C language is required. All files regarding components( DSPIC30F4011, L298 H Bridge and FAULHAGER), design notes and schematic for the mouse are attached

    $63 (Avg Bid)
    $63 Avg Bid
    3 bids
    AWS Expert. 5 days left

    ...with deep knowledge of AWS CloudSearch, including: - Indexing and other best practices for millions of product titles, descriptions, categories, metadata, etc. - Search algorithm optimization - we can provide initial test cases but will need strategic guidance here. - Weighting, suggesters, fuzzy match, plural vs singular, stopwords, categorization

    $446 (Avg Bid)
    $446 Avg Bid
    12 bids
    lead score 5 days left
    VERIFIED

    I have a business that sells...PERFORMANCE DATA) that is the individual sales reps who go into these homes and the data that can be derived from their performance in these various environments. I need an algorithm that can make lead assignments or matches based on which rep performs best in which LEAD environment. I am happy to discuss in more detail.

    $555 (Avg Bid)
    $555 Avg Bid
    15 bids

    We are a timber harvesting and forest remediation company focused on ecologically sustainable and low impact methods. Company name is Treehab Forest Management, LLC Need a logo that demonstrates our dedication to caring for the forest, clean lines, that will look sharp on our trucks and equipment. Prefer US based designers. We're owned and operated

    $68 (Avg Bid)
    $68 Avg Bid
    90 bids

    ...create a banner and logo combination for my website. I am a blogger / coach who works with people to help them improve their health via food, exercise, discussion, and various methods. I have managed a small rather crappy logo on my own but I'd prefer something more professional looking. The person I'd hook up with hopefully would be open to working together

    $29 (Avg Bid)
    $29 Avg Bid
    32 bids

    ...more methods, and what is more important, methods should be able to be chained, or used individually. Example: [login to view URL]({}).validateGroup(); This is only the first part of the work to be done. Each new library will be payed additional. If the developer or developers we hire are a good fit, we can keep working on the rest of the methods in the

    $450 (Avg Bid)
    $450 Avg Bid
    2 bids

    ...named "Aggiungi immagine" (add image) it opens a popup that is without vertical scrollbar, please add the srollbar To understand how it should works, you can follow the same path and at the end click on "Aggiungi Adesivo" and then you will see the scrollbar working well. IMAGE 4 - CHANGE HTML TITLE META TAG change title to the admin page from "theEFORTE_"

    $177 (Avg Bid)
    $177 Avg Bid
    8 bids

    ...according AAMVA standards The image in the attached file. The initial data for generation will be entered into the fields manually, or imported by a text or csv file. Generation algorithm is generally available, but most likely you will need edits to the desired project, based on the standards [login to view URL] Program languages: Python, Java, JavaScript I provide

    $622 (Avg Bid)
    $622 Avg Bid
    11 bids

    .../about ai/ml in agriculture ------Route = /ai crypto payments ------ Route = /crypto government system integrations ------ Route = /gov developers ----- Route = /dev api (future path) ----- Route = /api This application core will operate out of a Docker container, so I will also need you to be familiar with packaging you app into a docker container. I will

    $55 / hr (Avg Bid)
    $55 / hr Avg Bid
    38 bids
    Graph algorithms 5 days left

    ...according to given task. Main features - generate graph correctly, mannualy create graph by hand, BFS algoriththm for shortest path without the weight. Condition in general-Create and implement a random graph generation algorithm. Qualification upgrades must be top-down to provide more information on Kmax neighbors. The numbers Kmin and Kmax are also indicated

    $47 (Avg Bid)
    $47 Avg Bid
    6 bids
    Algorithms 5 days left
    VERIFIED

    Basic, small Java and Algorithm problems need to be solved.

    $26 (Avg Bid)
    $26 Avg Bid
    41 bids

    1. Use a three layer neural network to classify the two sets of 3-D data set. You should generate 100 samples for each...numbers with X ranges from 0.5 to 1.5; Y ranges from 0.5 to 1.5; and Z ranges from 0 to 1. Note, instead of backpropagation algorithm, use Simulated Annealing Algorithm. 2. Repeat problem 1 by using Genetic Algorithm

    $168 (Avg Bid)
    $168 Avg Bid
    22 bids

    Create a payment methods in website. I need to add credit cards, paypal, google pay [login to view URL] thx

    $160 (Avg Bid)
    $160 Avg Bid
    32 bids

    This project consists of 4 problems. The core topic is Geometric Brownian Motion and some simulation methods, eg. Monte-Carlo, antithetic variates, importance sampling and their implementation in C++. The solutions should be written in the form of a 20 pages report in LaTeX (not a Q&A format).

    $388 (Avg Bid)
    $388 Avg Bid
    18 bids

    I have paper in scheduling algorithm to reduce energy consumption in cloud datacenter. I need a freelancer to reproduce it in CloudSim as simulator tool and JAVA as programming language and regenerate the same graphs at least 10% difference from the original graph.

    $187 (Avg Bid)
    $187 Avg Bid
    5 bids

    ...app which utilizes the camera and some post-processing on the video from the camera. Our app developer needs advice and help in developing the app. We have developed an algorithm using Matlab to process the video and have a rudimentary app that does the same but would like to take the app to the next level. Increasing its speed at processing and robustness

    $14 / hr (Avg Bid)
    $14 / hr Avg Bid
    52 bids