Matlab simulink wind solar jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Skills
Languages
    Job State
    384 matlab simulink wind solar jobs found, pricing in USD

    ...Only structure, no need for exterior design at this point. You would need to have some experience to help with reducing the materials costs. The build will need to check on wind, snow and seismic tests for specs in Europa > Romania (tested within Autodesk Robot Structural Analysis). Walls and rooftop: 100mm Metallic Sandwich Isolated Panel Rooftop

    $328 (Avg Bid)
    $328 Avg Bid
    9 bids
    lead generation 6 days left
    VERIFIED

    Just take a survey on call about solar awareness and Earn $60 per survey. good thing customers is paying nothing for that, So if you want to earn here is the place. thanks Commission per survey $60 no hourly

    $121 (Avg Bid)
    $121 Avg Bid
    12 bids

    ...inspiration to the world around us. The protective segment includes mainly infrastructure, bridges, O&G, chemical and petrochemical industry and power generation (including wind). In our campaigns we focus on direct customers (paint applicators and steel builders) asset owns and specifiers (i.e. architects and engineering companies)....

    $34 / hr (Avg Bid)
    $34 / hr Avg Bid
    5 bids

    ...level alert devices to residents of small towns and cities in Nigeria so as to alert users on time of low water level in their storage tanks. The device would operate with solar and installed on top of the tanks. The device should be capable of sending an SMS alert for 20% water level. The range of the sensor should be 3-6m max. It needs to be mass

    $249 (Avg Bid)
    $249 Avg Bid
    17 bids

    ...services: - Modeling and Simulation in engineering and applied physics - Optimization - Multiphysics Analysis We prefer to use the Autodesk family of products, MATLAB and Simulink, COMSOL Multiphysics, ANSYS Multiphysics, discipline specific software and software developed in-house. But the content, if possible, should be software independent

    $397 (Avg Bid)
    Urgent
    $397 Avg Bid
    34 bids

    I have incoming solar leads in South Carolina. Need a well spoken person to communicate in English. These are originated through web sites. I have the script and leads to ready to go.

    $498 (Avg Bid)
    $498 Avg Bid
    17 bids

    To give best solution for cleaning Solar module by automatic system.

    $25 (Avg Bid)
    $25 Avg Bid
    12 bids

    ...proposed FLC in controlling the voltage of the islanded system, irrespective of the load variability, is extensively validated based on simulation studies in the PSCAD/EMTDC or SIMULINK environment. Moreover, the paper highlights the superiority of the proposed FLC over the conventional proportional-integral controllers through comparing the transient responses

    $224 (Avg Bid)
    $224 Avg Bid
    9 bids
    Energy system 4 days left
    VERIFIED

    aimed at providing fundamental knowledge of thermodynamics, fluid mechanics, and heat transfer in context of Energy Systems Engineer...analysis skills necessary to determine the importance of energy conversion technologies, with special emphasis on energy efficiency and renewable energy (tidal, hydroelectric, wind, solar and geothermal). Pre/Corequisi

    $134 (Avg Bid)
    $134 Avg Bid
    25 bids

    Dear All We are looking for experienced/fresh call centers for our solar campaign. Process - Outbound for solar appointment fixing. Leads Supplied – YES VoIP Supplied - NO Script Provided: Yes Training Provided: Yes Payment Cycle - Weekly Payout - 130 $ Location - California-USA

    $4500 (Avg Bid)
    $4500 Avg Bid
    1 bids
    Solar tower power plants 4 days left
    VERIFIED

    I want you to write two pages single space (11 font) report about solar tower power plants. I want you to explain the method and the proseduce(How it works) in the two different ways: 1- Plants that uses molten salt as the high temepratre fluid. 2-Plants that heaten up the water directly with no high temerpate fluid. Also why they uses mplten salt

    $8 / hr (Avg Bid)
    $8 / hr Avg Bid
    25 bids

    a fuzzy logic controller (FLC) for autonomous (islanded) operation of an electronically interfaced distributed generation unit and its load. In the gridconnected mode, the voltage-sourced converter is operated in the active and reactive power (PQ) control mode, where a conventional control scheme is used to control the active and reactive power exchange with the grid. In the islanded mode, the pro...

    $252 (Avg Bid)
    $252 Avg Bid
    15 bids

    Similar to the Falcon project, request to have a stand-alone software picturing visual wind strings hitting an inserted 3D STL model.

    $1034 (Avg Bid)
    NDA
    $1034 Avg Bid
    13 bids

    ...(weather station), the station must acquire meteorological data and visualize them on the internet website. -The measured physical phenomena are: ambient temperature, air humidity, wind speed and direction, local atmospheric pressure, local rainfall index. -To carry out the project, the main requirements are defined: -The system shall record the date and time

    $10 / hr (Avg Bid)
    $10 / hr Avg Bid
    7 bids

    ...Cleaning up and creating multiple models. Creating natural textures of ice and melting ice. Animating human actions - strolling, rowing, walking. Adding natural animations such as wind through trees and waves in the sea. * maya editing, rigging, animating * preparing 3D assets for Unity * cleaning up photogrammetry models * 3D human editing * creating PBR

    $21 / hr (Avg Bid)
    $21 / hr Avg Bid
    30 bids

    ...station (weather station), the station must acquire weather data and then view them on internet the website. Physical phenomenon measured are: room temperature, air humidity, wind speed and direction, atmospheric local pressure, precipitation page. In order to carry out the project the main requirements are defined: - The system records the date

    $34 / hr (Avg Bid)
    $34 / hr Avg Bid
    19 bids
    Redundant Power Electronics 1 day left
    VERIFIED

    Redundant Power Electronics design using Simulink

    $547 (Avg Bid)
    $547 Avg Bid
    24 bids

    ...publications available about using neuronal network / AI to predict solar plant power / energy output based on 24h weater forecast. The idea is to build up an algorithm that can be trained with daily quarter hourly or hourly values measured from solar plant and 24h weather forecast, which predicts solar plant power energy reliable (in about 20% of daily real value)

    $205 (Avg Bid)
    $205 Avg Bid
    23 bids

    ...minimum torque specifications for hold down bolts and driver compartment screws for cast aluminum streetlight housing. Provide Effective Projection Area (EPA) Calculations for wind load calculations. Submitter shall be qualified to perform structural calculations and certifications for roadway structures. Submittal shall include all calculations

    $195 (Avg Bid)
    $195 Avg Bid
    8 bids