SDWAN Implementation

Closed Posted 2 years ago Paid on delivery
Closed

We have new opportunity as per below site address & we need engineer with networking skills who can provide onsite support. We want to know the costing for Per Hour, Half Day, Full Day, OOH.

Site Address:-

10443 - Russia MFG 2 Vokzalnaya 254 Chapayevsk Samarskaya oblast 446115 Russian Federation

SLA: - Ad-hoc requests

Language Required: - English and Russian

Skill Level: - CCNA certified or level having experiences in networking

Scope of Work: -

This project has 5 phases and each phase might require more than one visit.

1st Phase -Site Survey & Circuit Testing

2nd Phase - Racking, Stacking, Physical Connectivity, Labelling & Activation of VeloCloud Box

3rd Phase -Branch Migration (Stage1)

4th Phase -Branch Migration (Stage2)

5th Phase -Decommissioning on Existing (Legacy) WAN Routers

SOW for the first visit (Site assessment)

List of activities to be performed by Field Engineer

Validation of rack space utilization: check the following:

Network rack number

Dimension of rack

Rack Unit space used & free in rack

Power PDU used in rack, Number of PDU in a rack

Power PDU's free ports

Power PDU's free ports type (i.e. C13/C14 or any other)

Provide basic pictures/diagrams/layouts for Comms room /Data room and Rack as detailed

in the site visit checklist provided to the Supplier by HCL.

Validation of Core or LAN Switch: check the following:

Physical Location of Device (Data Room / Comms. room)

Device's mounted location (Rack/WALL Rack enclosure/etc.)

Device Model

Hostname & Serial no. of Device

Cable hand off towards WAN Edge Router is Structured or Unstructured

No. of free & used ports on device

Free port type (Ethernet/FC)

Validation of Patch Panel on rack

Label used in Rack for Network cabling (yes/No)

Length of cable (patch panel to device) if any

Length (from patch panel to device or from link termination to devices/patch panel etc.)

Length of cable (from WAN Link termination to devices)

Verification of WAN Link termination Link termination details/Process and handover type

WAN circuit testing.

Services Required - Description:

REQUIREMENTS:

• CCNA CERTIFIED

• Network installation experience

• Laptop with Serial port or USB port with laptop charger is a must.

• Cisco console cable (preferably CISCO): Engineer Must have Well tested Serial Port to RJ 45 and USB port to RJ 45, both console Cable

• label printer

• Putty installed (please download before going on site) link [login to view URL]

• Wireshark must be installed, its free ([login to view URL])

• USB drive

• TeamViewer installed on PC

• Cell phone and charger

• Internet dongle : with 3G/4G hotspot (Must)

• Screw driver

• Skype must be installed on Laptop . Its free to download

• Safety shoes

• Hard Hat

• Steel-toed boots

• Safety glasses

• Vest

Network Administration Network Engineering Cisco

Project ID: #31871773

About the project

4 proposals Remote project Active 2 years ago

4 freelancers are bidding on average $25/hour for this job

ramygoda1590

Hi there, I have an excellent experience in networking/Linux/windows/vpn. please just ping me on freelancer chat to have a short discussion on your project and have it done very quickly. below is a brief on my experi More

$25 USD / hour
(123 Reviews)
5.8
ExpertNetworkEng

Hello Dear, I am an Expert Network Engineer and I am working as Expert Network Engineer at a Multinational ISP. I have great hands-on experience for more than 15 years in various network technologies. I have Cisco C More

$25 USD / hour
(117 Reviews)
5.6
amitdxt56

I am already working on SDWAN live projects. I have expertise in VIPTELA , CISCO SDWAN devices. I will complete the project within SLA

$25 USD / hour
(0 Reviews)
0.0
anitchkababykin

Hi Team, We can provide onsite resource to your location. Please let me know what would be the scope of work for the engineer. Is it just to provide remote or does he need to do some config as well.

$25 USD / hour
(0 Reviews)
0.0